Skip to the record
Accept no imitations.

Council archive · source document

Decision Notice - Approved by Delegation of Authority - OPW26 0095 (As Published) · OPW26/0095

of 8

Text shows just the words. Original shows the document exactly as it was published.

               4.     ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. Where there are inconsistencies between the approved plan
                      and the conditions of the approval, the conditions of the approval override the approved
                      plans.
                      The approved plans are listed in the following table unless otherwise amended by these
                      conditions.

                        Plan No.       Rev.   Plan/Document Name                                   Date

                        200            C      Earthworks Plan Erosion & Sediment Control Plan      12 August 2026
                                              Prepared by Infinity CE
                                              As Amended by Council

                        300            C      Driveway Site Plan                                   12 August 2026
                                              Prepared by Infinity CE
                                              As Amended by Council

                        320            C      Driveway Long-section & Typical Cross section        12 August 2026
                                              Prepared by Infinity CE

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 21 September 2028, unless an application to extend the currency
                      period is approved by Council.
               SITE SPECIFIC CONDITIONS
                      Geotechnical Stability
               3.     The “proposed fill area” detailed in the Approved Plans must:
                      a.      be positioned in such a way that will not block, redirect or otherwise adversely affect
                              surface flow; and
                      b.      be provided with ground cover that achieves both short- and long-term stabilisation.
                      (*) Refer to Advisory Note.
               4.     All works must be carried out in accordance with a Geotechnical Report (or part thereof)
                      prepared by a qualified person*.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               5.     All necessary approvals from external service providers (e.g., Unitywater) and external
                      parties on which the development works are proposed have been obtained and a copy
                      supplied to Council.
               6.     Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               7.     Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.




                                                                                                          Page 2 of 8
Document Set ID: 25190217
Version: 3, Version Date: 28/09/2026

Used in these records

About this file

File size
156 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority - OPW26 0095 (As Published).pdf · 156 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.