Council archive · source document
Decision Notice - Approved by Delegation of Authority - OPW26 0095 (As Published) · OPW26/0095
4. ASSESSMENT MANAGER CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. Where there are inconsistencies between the approved plan
and the conditions of the approval, the conditions of the approval override the approved
plans.
The approved plans are listed in the following table unless otherwise amended by these
conditions.
Plan No. Rev. Plan/Document Name Date
200 C Earthworks Plan Erosion & Sediment Control Plan 12 August 2026
Prepared by Infinity CE
As Amended by Council
300 C Driveway Site Plan 12 August 2026
Prepared by Infinity CE
As Amended by Council
320 C Driveway Long-section & Typical Cross section 12 August 2026
Prepared by Infinity CE
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 21 September 2028, unless an application to extend the currency
period is approved by Council.
SITE SPECIFIC CONDITIONS
Geotechnical Stability
3. The “proposed fill area” detailed in the Approved Plans must:
a. be positioned in such a way that will not block, redirect or otherwise adversely affect
surface flow; and
b. be provided with ground cover that achieves both short- and long-term stabilisation.
(*) Refer to Advisory Note.
4. All works must be carried out in accordance with a Geotechnical Report (or part thereof)
prepared by a qualified person*.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
5. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
6. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
7. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
Page 2 of 8
Document Set ID: 25190217
Version: 3, Version Date: 28/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority - OPW26 0095 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 156 KB (small file)
- File type
No other editions are linked here.