Original source · versioned page text
Stormwater Management Plan MCU17/0014
Original PDF page 38, section 1. The text section number identifies this passage in the reader.
Introduction
This manual has been designed to assist you with cleaning
and maintaining the EnviroPod Stormwater Gully Pit Insert,
Why cleaning and maintenance are
using the methods recommended by the manufacturer. so vitally important
The cleaning process and methods described cover all
aspects of the system, including: Adhering to the inspection and maintenance schedule of
each stormwater treatment device is essential to ensuring
• Removing the grate
that it works properly throughout its estimated design life.
• Cleaning the filter bag
During each inspection and clean, details of the mass,
• Inspecting the unit
volume and type of material that has been collected
• Rejuvenating the filter bag by the device should be recorded. This data will assist
• Re-installing the filter bags. with the revision of future management plans and help
determine maintenance interval frequency. It’s also
The manual should be used in conjunction with your
essential that qualified and experienced personnel carry
site’s traffic management and safety plans, as well as
out all maintenance (including inspections, recording and
other appropriate Stormwater360 (IES) documents such
reporting) in a systematic manner. To ensure consistency, we
as the IES Employee Health and Safety Manual. We also
recommend that one person be responsible for overseeing
recommend that maintenance and cleaning contractors, or
the management of the maintenance and cleaning process.
device owners, develop their own site-specific health and
safety activity plans to ensure a safe work environment. Maintenance of your stormwater management system is
essential to ensuring ongoing at-source control of stormwater
pollution. Maintenance also helps prevent structural failures
Please note: This manual consists primarily of (e.g. prevents blocked outlets) and aesthetic failures (e.g.
the processes and tasks associated with the debris build up).
hand maintenance and inductor maintenance
procedures. It does not include details of the
site’s traffic management or occupational health
and safety requirements. Contractors or IES
staff should utilise their own Employee Health
and Safety Manual, which details the policies
and procedures for safe work.
4 Stormwater360 Operations and maintenance
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Stormwater Management Plan MCU17_0014.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.