Attachment E Stormwater Sediment Control plan

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                                                                                                               0.80




                                                                                                                                                                                                                                                                                                                                                                INSTALL 2 x 400mm MINIMUM WIDE ROLL
                                                                                                                                                                                                                                                                                                                                                                OF TURF ON THE VERGE ADJACENT KERB
                                                                                                                                                                                                                                                                                                                                                                TO MATCH TOP OF KERB LEVEL


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      BACK OF KERB
                                                                                                                                                                                                                                                                                                                                                                                                                       1.00




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       KERB & CHANNEL




                                                                                                                                                                                                                                                                                                                                                                            RETURN TURF STRIPS EVERY
                                                                                                                                                                                                                                                                                                                                                                              5m TO PREVENT SCOUR
                                                                                                                                                                                                                                                                                                                                                                                                       INSTALL 2 x 400mm
                                                                                                                                                                                                                                                                                                                                                                                                       MINIMUM WIDE ROLL
                                                                                                                                                                                                                                                                                                                                                                                                       OF TURF RETURNS




                                                                                                                                     EROSION AND SEDIMENT CONTROL NOTES:
                                                                                                                                     GENERAL:                                                                        SEDIMENT FENCE:
                                                                                                                                     1.   TO BE READ IN CONJUNCTION WITH 'SEDIMENT CONTROL DEVICES', REFER           1.   NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
                                                                                                                                          STD DRG IPWEA DS-040 & DS-041.                                             2.   NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM CATCHMENT
                                                                                                                                     2.   TEMPORARY DRAINAGE CONTROL FLOW SHOULD BE DIVERTED AROUND                       AREA 0.6Ha PER 100m LENGTH OF FENCE
                                                                                                                                          THE WORK SITE WHERE POSSIBLE.                                              3.   WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED ON
                                                                                                                                     3.   ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND
                                                                                                                                          BE OPERATIONAL BEFORE COMMENCING UP-SLOPE EARTHWORKS.
                                                                                                                                                                                                                          SMALL WORK SITES, I.E. OPERATIONAL PERIOD LESS THAN 6 MONTHS OR
                                                                                                                                                                                                                          ON SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS NOT EXPECTED
                                                                                                                                                                                                                                                                                                                                                                                                                   TURF FILTER STRIP DETAIL
                                                                                                                                                                                                                                                                                                                                                                                                                                          SCALE 1:20
                                                                                                                                     4.   CONTROL MEASURES TO BE INSPECTED AT LEAST WEEKLY AND AFTER                 4.   WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR THE
                                                                                                                                          SIGNIFICANT RUNOFF PRODUCING STORMS.                                            LAYOUT SHALL CONFORM TO 'TYPICAL LAYOUT' ACROSS GRADE.
                                                                                                                                     5.   IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED               5.   FENCES ARE REQUIRED 2m MIN. FROM TOE OF CUT OR FILL BATTERS,
                                                                                                                                          SURFACES TO BE EITHER MULCHED, COVERED WITH EROSION CONTROL                     WHERE NOT PRACTICAL ONE FENCE CAN BE AT THE TOE WITH A SECOND
                                                                                                                                          BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED                     FENCE 1m MIN AWAY. FENCE SHOULD NOT BE LOCATED PARALLEL WITH                                                                                                                                                                                     STABILISE STOCKPILE SURFACE
                                                                                                                                          FOR MORE THAN I4 DAYS.                                                          TOE IF CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE
                                                                                                                                     6.   CONTROL MEASURES MAY BE REMOVED WHEN ON-SITE EROSION IS                    TEMPORARY CONSTRUCTION ENTRY / EXIT:
                                                                                                                                          CONTROLLED AND 70% PERMANENT SOIL COVERAGE IS OBTAINED OVER
                                                                                                                                          ALL UPSTREAM DISTURBED LAND.                                               1.   ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM
                                                                                                                                                                                                                          ENTRY/EXIT.
                                                                                                                                     7.   STRAW BALE SEDIMENT TRAPS ARE TO BE SECONDARY OPTION WHICH                                                                                                                                             EARTH BANK FOR UPSTREAM




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            2.5 MAX
                                                                                                                                          GENERALLY SHOULD NOT BE USED IF OTHER OPTIONS ARE AVAILABLE.               2.   WHEEL-WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER.                                                           APPROACH FLOWS                                                                                                                                                                                                                                            SEDIMENT
                                                                                                                                                                                                                     STANDARD SPECIFICATIONS:                                                                                                                                                                                                                                1                                                                                                                             FENCING
                                                                                                                                     SEDIMENT CONTROL:                                                                                                                                                                                                                                                                                                                                                                                                       1
                                                                                                                                                                                                                                                                                                                         FLOW DIRECTION                                                                                                                                2
                                                                                                                                     1.   ALL SEDIMENT & EROSION CONTROL MEASURES TO BE IN ACCORDANCE                DRAWING TO BE READ IN CONJUNCTION WITH INTERNATIONAL EROSION                                                                                                                                                                                                                                                      GROUND LEVEL              2
                                                                                                                                          WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA            CONTROL ASSOCIATION (IECA) AUSTRALASIA BEST PRACTICES STANDARD
                                                                                                                                          GUIDELINES AND THE SPECIFICATIONS. THE BASIC PRINCIPLES ARE TO:            DRAWINGS & SPECIFICATIONS:
                                                                                                                                           · MINIMISE THE AREA OF DISTURBANCE;                                                 EXIT-01 - CONSTRUCTION EXIT - ROCK PAD
                                                                                                                                           · CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS                            EXIT-02 - CONSTRUCTION EXIT - ROCK PAD
                                                                                                                                             FROM SITE;                                                                        EXIT-03 - ROCK PADS FOR BUILDING SITES
                                                                                                                                           · MINIMISE EROSION;                                                                 CD-01 - CATCH DRAINS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TYPICAL STOCKPILE DETAIL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             SCALE 1:20
                                                                                                                                           · MINIMISE SEDIMENTATION;                                                           CD-02 - CATCH DRAINS - EARTH LINED
                                                                                                                                           · PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE                                RCD-01 - CHECK DAMS
                                                                                                                                     2.   SEDIMENT & EROSION CONTROL DETAILS SHOWN ARE MINIMUM                                 FF-01 - FILTER FENCE
                                                                                                                                          REQUIREMENTS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSTALL                                                                                                                                                                                                                SPILL THROUGH
                                                                                                                                                                                                                               SF-01 - SEDIMENT FENCE                                                             SEDIMENT FENCE IN ACCORDANCE
                                                                                                                                                                                                                                                                                                                                                                                                                       WEIR IF REQUIRED                2m NOM; 3m MAX
                                                                                                                                          ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY THROUGHOUT                                                                                                              WITH STD DRG IPWEA DS-040
                                                                                                                                          CONSTRUCTION.                                                                        SF-02 - SEDIMENT FENCE                                                                                                                                                                                                                                                                                               2.00                 1.00                 0.30

                                                                                                                                     3.   THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL                       ESC-02 - GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   FLOW DIRECTION                                                                       GROUND LEVEL
                                                                                                                                          DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL BLOCKED SEDIMENT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     0.60
                                                                                                                                                                                                                               ESC-03 - KERB INLET SEDIMENT TRAPS
                                                                                                                                          DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF WORKS.
                                                                                                                                                                                                                               R-01 - RENEGOTIATION - GENERAL                                                                                                                                                                                                                                                                                                                         1
                                                                                                                                     4.   CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE                                                                                                                                                                                                                                                                                                                                                                                 1




                                                                                                                                                                                                                                                                                                                                                                                                                0.30
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         1                                                2
                                                                                                                                          SATISFACTION OF THE SUPERINTENDENT. SHALL BE COMPLETED AND                                                                                                                                                                                                                                                                                                                                                                         2




                                                                                                                                                                                                                                                                                                                                                                                                                                               0.60
                                                                                                                                          EFFECTIVE PRIOR TO:                                                                                                                                                                                                                                                                                                                                                                                         6




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     0.20
                                                                                                                                           a. STRIPPING OF TOPSOIL AND GRASS.                                                                                                                                                                                                                                                                                                                                                   EARTH BANK FOR UPSTREAM
                                                                                                                                           b. BULK EARTHWORKS TO THE SITE.                                                                                                                                                                                                                                GROUND LEVEL                                                                                                          APPROACH FLOWS
                                                                                                                                                                                                                                                                                                                                                                                                                                                  FENCE STAKES
                                                                                                                                           c. SERVICES INSTALLATION.
                                                                                                                                           d. PAVEMENT CONSTRUCTION.                                                                                                                                                                                                                                     SEDIMENT FENCE AND WEIR                                                                                                    DIVERSION/ CUT-OFF DRAIN DETAILS
Filename: X:\200849 PROPOSED RESIDENTIAL DWELLING - 20 PARK CRESCENT, SUNSHINE BEACH\3.0 CAD\DRAWINGS\200849-C-00002.DWG




                                                                                                                                     6.   ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL                                                                                                                                                                                                                         SCALE 1:20                                                                                                                            SCALE 1:20
                                                                                                                                          INSTRUCTION IS RECEIVED IN WRITING FROM THE SUPERINTENDENT TO
                                                                                                                                          REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS.
                                                                                                                                     7.   BOTH TEMPORARY AND PERMANENT SEDIMENT MANAGEMENT/EROSION
                                                                                                                                          CONTROL DEVICES SHALL BE MAINTAINED AT A SUITABLE LEVEL/CONDITION                                                                                                                                                                                                                                           FORM U-SHAPED CREST TO ENSURE
                                                                                                                                          THROUGHOUT CONSTRUCTION TO THE SATISFACTION OF THE                                                                                                                                                                                                                                                          OVER-TOPPING AT CENTRE OF DAM                                     0.50                  LOOSE ROCK
                                                                                                                                          SUPERINTENDENT. SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN                                                                                                                                                                                                                                                                                                                                          PROTECTION, D50=150mm
                                                                                                                                          CAPACITY IS REDUCED BY 30%.




                                                                                                                                                                                                                                                                                                                                                                                                                                                            0.40 NOM
                                                                                                                                     8.   THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE
                                                                                                                                          READ IN CONJUNCTION WITH THE APPROVED DRAWINGS.                                                                                                                                                                                                                                                                                                               1                                                                    GROUND LEVEL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         1
                                                                                                                                     9.   PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE                                                                                                                                                                                                                                                                                           3                                                   3
                                                                                                                                          OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION OF THE SITE
                                                                                                                                          ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE MAINTAINED
                                                                                                                                          THROUGHOUT THE CONSTRUCTION PERIOD.
                                                                                                                                     10. IF EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN FOUND TO BE
Last saved by: GRANT(2021-02-18) Last Plotted: 2021-02-18




                                                                                                                                                                                                                                                                                                                                                                                                                                                            0.25 NOM
                                                                                                                                         DIFFERENT OR FAILED IN SERVICE, CORRECTIVE ACTION IS TO BE                                                                                                                                                                                                                                                                                                                                                        GEOFABRIC LINER
                                                                                                                                         UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS'
                                                                                                                                         ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH
                                                                                                                                         AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED
                                                                                                                                         NECESSARY AND RELEVANT.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            TEMPORARY ROCK FILTER DAM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             SCALE 1:20
                                                                                                                                     11. SEDIMENT TRAP TO BE FLOCCULATED AND DE-SILTED AS NECESSARY.
                                                                                                                                     12. WATER QUALITY TESTING / MONITORING TO BE UNDERTAKEN BY
                                                                                                                                         CONTRACTOR.




                                                                                                                                                                                         North Point         Scale                                            Horiz. Datum   Client                   Consultant                                                                                               Project                                                                                           Drawing
                                                                                                                                                                                                                                                                LOCAL                                                                                                                                                                                                              Drawn                GM                                                                                           Drawing No.               Rev No.
                                                                                                                                                                                                                                                                                      J & S DOUGLAS                                                                                                                    20 PARK CRESCENT                                                                                                 CIVIL
                                                                                                                                                                                                                     0                0.5             1       Vert. Datum                                                                                                                                           SUNSHINE BEACH, QLD, 4567                                      Design               GM                  EROSION & SEDIMENT CONTROL
                                                                                                                                                                                                                     A1 1:20
                                                                                                                                                                                                                                                          m      AHD
                                                                                                                                                                                                                                                                                                                                                                                                                 PROPOSED RESIDENTIAL DWELLING                                     Check                LS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                NOTES AND DETAILS                                             200849-C-00002                    A
                                                                                                                                                                                                                                                              RL Datum                                                                                  CIVIL | STRUCTURAL | GEOTECHNICAL                                                                                                                        Approved                    Signed
                                                                                                                            A FOR APPROVAL                             17.02.21 LS                                                                            PSM44270                                COPYRIGHT © All rights reserved.                                                                                                                                                                                                                                                                                 Sheet
                                                                                                                           Rev          Revision Description             Date Approved                                                                        RL 29.925
                                                                                                                                                                                                                                                                                                      This work is copyright and cannot be reproduced
                                                                                                                                                                                                                                                                                                      or copied in any form without the prior consent
                                                                                                                                                                                                                                                                                                                                                        SUNSHINE COAST | BRISBANE | GOLD COAST
                                                                                                                                                                                                                                                                                                                                                        www.arcosgroup.com.au | ABN 51 640 311 842
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Date               17.02.21   L.SWANN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 RPEQ   21223
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Status     NOT FOR CONSTRUCTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Size     A1
Log in to download the original file

Attachment E Stormwater Sediment Control plan.pdf · 429 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.