Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

6. Code assessment

of 64
Noosa Plan 2020: Amendment 1
Part 6 Zones \ 6.5 Industry Zones Category \ 6.5.2 Medium Impact Industry Zone Code




                                                        (b)   safe access for all staff eating; and
                                                        (c)   tables and rubbish bins

Security fencing                                        AO27                                                      N/A – No security fencing onsite
PO27                                                    Security fencing no less than 1.8 metres in height
All property boundaries are clearly identifiable and    encloses the rear and side boundaries of the site and
suitable day and night safety and security measures     prevents unauthorised access to all outdoor parts of
are provided to protect people and property.            the site involved in the use.

PO28                                                    AO28                                                      N/A – No security fencing onsite
Security fencing is in keeping with the surrounding     Fencing on any frontage is setback an average of 2
area and does not have an adverse impact upon the       metres provided that no part of the fencing is within 1
appearance of the streetscape.                          metres of the property boundary.

Table 6.5.2.3 Criteria for assessment. (part)

Performance outcomes                                    Acceptable Outcomes                                       Comments

All activities

Earthworks and drainage

PO29                                                    AO29                                                      N/A – No filling or excavation works proposed
Filling, excavation and retaining structures do not     Filling and excavation works are designed and
directly, indirectly or cumulatively cause adverse      constructed to ensure overland flow and/or flooding is
impacts external to the development site by:            not worsened, impeded, or otherwise diverted to
(a) causing ponding of water on the site or nearby      adversely affect other properties or downstream
       land;                                            environments.
(b) increasing flooding, which adversely affects the
       safety or use of any land upstream and
       downstream; or adversely affecting the flow of
       water in any overland flow path.




Print Date: 31/07/2020                                                                                                                                            Page 12

Log in to download the original (6. Code assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.