2019-01-14 General Committee Meeting Notes

of 5

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                     14 JANUARY 2019


           c.    the internal driveway at the access point must be widened sufficiently to ensure
                 that all vehicles exiting the site and travelling west can remain on the southern
                 side of the centreline of the improved Cooroy Mountain Road.
     9.    The full extent of the driveway from Cooroy Mountain Road to the loading area of the
           facility must be sealed, designed and constructed in accordance with AS/NZS2890.1-
           2004, AS2890.2-2002 and The Noosa Plan Planning Scheme Policy 5 Engineering
           Design Standards - Roads, Drainage and Earthworks. The driveway shall be designed
           and constructed to grades that prevent vehicles from scraping and/or bottoming.
           Should any driveways be constructed to grades that do not comply with
           ASINZS2890.1:2004 and AS2890.2-2002, Council will require that the driveway be
           removed and reconstructed to levels that do comply.
     B1.   The road reserve opposite the site access must be landscaped. The works must be
           undertaken in accordance with an Operational Works approval and the Noosa Plan for
           that specific area and must include in particular:
           a.    An accurate account of trees removed for the works including species, amount
                 of visual dominance in the landscape and approximate age.
           b.    Replacement planting of trees removed in must have a minimum pot size of 45L.
           c.    landscaping treatment to the northern road reserve including the provision of
                 advanced tree stock of local native species to provide and maintain visually the
                 rural nature of the road corridor.
           d.    A 36 months maintenance program to ensure the growth of the replacement
                 plantings.
     B2.   All landscape works must be established and maintained in accordance with the
           approved design for the life of the development, and in a manner that ensures healthy,
           sustained and vigorous plant growth. All plant material must be allowed to grow to full
           form and be refurbished when its life expectancy is reached.
     B3.   All landscape works must be maintained generally in accordance with the approved
           design for the life of the development.
C.   Refer the proposed upgrade of Cooroy Mountain Road and Topaz Street to the Director of
     Infrastructure Services to determine the timing of the upgrade works within the 10 year
     Capital Works Program.
                                                                                          Carried.
Cr Stockwell voted for the motion.




                                                                                     Page 3 of 5
Log in to download the original file

2019-01-14 General Committee Meeting Notes(PDF, 344KB).pdf · 353 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.