Application No. MCU22/0207 & OPW22/0314
Applicant Robert David Martyr and Catherine Ellen Martyr
Proposal Material Change of Use - Landing – Residential and
Operational Works – Prescribed Tidal Works - Jetty
Properly Made Date 2 December 2022
Information Request Date 23 December 2022
Information Response Date 27 February 2023
Decision Due Date 2 May 2023
Report Reviewed & Daniel Epps – 12 April 2023
Finalised By
PROPERTY DETAILS
Property Address 24 Wesley Ct Noosa Heads Qld 4567
RP Description Lot 45 N 21844
Land Area 649.0000 m²
Existing Use of Land Residential
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Zone Low Density Residential
Precinct Not Applicable
Local Plan Area Noosa Heads
Overlays Acid Sulfate Soils, Flood
Assessment Type Code
1. PROPOSAL
The application seeks approval for a Material Change of Use - Landing – Residential and
Operational Works – Prescribed Tidal Works – Jetty.
Document Set ID: 22369420
Version: 4, Version Date: 13/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
The locality and proposal plan are included below.
Figure 1 – Locality
Page 2 of 7
Document Set ID: 22369420
Version: 4, Version Date: 13/04/2023
Page 3
Figure 2 – Site Plan
2. SITE DETAILS
2.1. Background
There is no higher order approval requiring the works.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
• State Planning Policy;
• South East Queensland Regional Plan;
• Planning Regulation 2017;
• Coastal Protection and Management Act; and
• Noosa Plan 2020.
3.2. Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
• Watercourses Work Code
The application has been found to generally comply with all applicable statutory instruments.
Assessment
It is noted that a number of the submitted plans also indicate modifications and extensions to the
existing dwelling. These modifications and extensions are not part of the subject application and
the approved plans will be annotated accordingly.
Page 3 of 7
Document Set ID: 22369420
Version: 4, Version Date: 13/04/2023
Page 4
4. CONSULTATION
4.1. Referral Agencies
The applicant was referred to the following Referral Agencies:
• Department of Infrastructure, Local Government and Planning (SARA)
The Department is a referral agency for operational work for tidal works or works in a tidal
management district
The Department has responded on the 15 March 2023 advising that they are in support of the
application subject to conditions.
4.2. Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
• Planning
5. CONCLUSION & REASONS FOR DECISION
The proposed development generally complies with the requirements of the planning scheme and
does not raise any significant issues that cannot be addressed by reasonable and relevant
conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No MCU22/0207 for a Material Change of Use - Landing – Residential
and OPW22/0314 for Prescribed Tidal Works – Jetty situated at 24 Wesley Ct Noosa Heads Qld
4567 and described as Lot 45 N 21844, it is recommended the application be approved in
accordance with the following details for the Decision Notice:
1. APPLICATION DETAILS
Application No: MCU22/0207 & OPW22/0314
Street address: 24 Wesley Ct Noosa Heads Qld 4567
Real property description: Lot 45 N 21844
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
Council decided to issue the following type of approval:
• Development Permit for Material Change of Use - Landing – Residential and
• Development Permit for Prescribed Tidal Works – Jetty.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
Page 4 of 7
Document Set ID: 22369420
Version: 4, Version Date: 13/04/2023
Page 5
CR-2023-K < Site Plan prepared by Mandy’s Drafting 16 February 2023
Only
As Annotated by Council
22-0632-F3 B Foundation and Jetty Plan prepared by 16 February 2023
Lindsay Consulting
As Annotated by Council
22-0632-F4 B Typical Foundation Detail prepared by 16 February 2023
Lindsay Consulting
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 12 April 2025,
unless an application to extend the currency period is approved by Council.
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
General Conditions
4. The maximum number of vessels that may be berthed, moored, attached or stored on the
structure must not exceed 2.
5. The use of the jetty must not cause any adverse effects on the amenity of the surrounding
areas including changes to light, views, air quality and noise.
6. Vessels berthed/moored at the jetty must be located a minimum of 1.0 metres from the
prolongation of the property boundaries.
7. Vessels and boatlifting devices must be connected directly to the jetty, and not located side
by side or in tandem with another vessel.
8. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall
9. All structures must have no detrimental effects on stormwater drains and/or easements.
10. Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
revetment wall.
11. A rigid handrail must be fitted on one side of the walkway. The handrail must be of an open
design and be visibly unobtrusive.
12. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide necessary support for the handrail.
13. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without Council approval.
14. There must be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall unless all switches and power outlets are positioned above the
1%AEP flood level.
15. Lighting associated with the use must be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
Page 5 of 7
Document Set ID: 22369420
Version: 4, Version Date: 13/04/2023
Page 6
16. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
17. Boat repair activities are not permitted on site.
18. Wastewater and sullage must only be disposed of at approved pumpout facilities.
19. The mooring facility must not be utilised for live-aboard purposes.
20. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.
21. Certification by a Registered Professional Engineer of Queensland that states that the jetty
is constructed in accordance with best practice methods and is structurally sound must be
submitted to Council. This certification must be submitted to Council within three (3) months
of the completion of the works. A final inspection and approval of the structure by Council’s
Inspector is also required. Please contact Council’s Development Assessment Branch on
5329 6500 to arrange the inspection.
22. This approval lapses where the construction of the jetty has not commenced within two (2)
years of the date of issue of the approval, unless application is made and approved by
Council for an extension.
23. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP Via Planning Regulation The agency provided its
MyDAS2 at 2017 Schedule 10, Part response on 15 March
https://prod2.devasses 17 – Tidal Works or 2023 (Reference No.
s. qld.gov.au/suite/ (for Works in a Coastal 2212-32645 SRA). A
assistance, contact Management District copy of the response is
DILGP at 5352 9701 or [Insert trigger title] attached
email:[email protected]
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
2. The approval or conditions do not absolve the owner of the land from complying with all the
conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
statues and/or statutory regulations in the execution and/or performance of said works.
3. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
Page 6 of 7
Document Set ID: 22369420
Version: 4, Version Date: 13/04/2023
Page 7
4. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Building and Construction Industry (Portable Long Service Leave) Levy
5. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Aboriginal Cultural Heritage Act 2003
6. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Not applicable.
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Page 7 of 7
Document Set ID: 22369420
Version: 4, Version Date: 13/04/2023