Council archive · source document
Appendix D - Civil Engineering Report · MCU21/0175
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
$1301229
SITE LOCALITY
Proposed Underground Works Plan Validity
This included proposed works plan has the same period of validity as the
Enengex maps & Energex response, which is 23 Days.
‘The 28 days is effective from the Date of Response on the Energex DBYD
Response Coversheet.
maintained for the entize period of the proposed works.
Notice It is the xesponsibility of the applicant to ensuxe that valid plans are
ENERGEX EASEMENT PLAN
of ENERGEX proposed Underground
out in the area of your DBYD request.
‘The cable voltages detailed may include, Low Voltage, 1IKV, 33KV
or HIOKV Transmission and Pilot (Fibre Optic) underground.
Cables. The details of the underground works plan provided, is
information only as the works may not be constructed at
i ON ~ INSTALL NEW S00KVA PMT, 11KV & LV CABLE, CONDUITS, PILLARS, PTS
time. U vi STREETLIGHTS
=) 23 LOT CB SUBDIVISION
NOOSA civic
28 EENIE CREEK RD, NOOSAVILLE QLD 4566
As the details shown on this works plan may differ from the final
construction details, no responsibility is incurred by ENERGEX for
the accuracy or completeness of the information provided.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Civil Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.