CONSOLIDATED PROJECT LIST - COVID RECOVERY FUNDING $4.6M
TOTAL FUNDING $ 4,620,346
Project name/description Type Total Project Funding Stream Project Review update
Project Management
Cost
Public Amenities Renewal of fit outs and fittings Capital - $ 220,000 Buildings & State W4Q - $2m Unite 12 locations identified for works, 9
across a number of public amenities across the Renewal Facilities and Recover completed with 3 to be finished Nov 20.
Shire, as a result of recent condition Additional locations for works to be
assessments. completed with remaining funding.
Boreen Point Campground - Tank replacement x Capital - $ 60,000 Buildings & State W4Q - $2m Unite 100% Design Complete in two stages the
5 existing concrete tanks are suffering concrete Upgrade Facilities and Recover Water storage went to Market 6Oct20,
cancer and are leaking
Boreen Point - Groundwater Treatment Existing Capital - $ 160,000 Buildings & State W4Q - $2m Unite 100% Design Complete in two stages the
system past end of useful life, less than optimal Upgrade Facilities and Recover Water storage went to Market 6Oct20,
water treatment - leading to maintenance issues
with hot water systems, clogging of pipes etc.
Peregian Beach Boardwalk Renewal North of Capital - $ 230,000 Design, Delivery State W4Q - $2m Unite Design finalised. Procurement docs
Tower to Access 57 includes removal of existing Renewal and and Recover prepared.
boardwalk, revegetation, relocation of Infrastructure
replacement shower facility and concrete
pathway and timber boardwalk as well as
completing final link of boardwalk
Noosa Heads Sunshine Beach Road Pathway Capital - $ 150,000 Design, Delivery State W4Q - $2m Unite Contract awarded, works to commence
Lighting Upgrade (Transit Centre to Bicentennial Upgrade and and Recover early in the new year.
Drive) - finishing components to complete Infrastructure
lighting in this section. Safety issue.
Noosa Regional Gallery - Refurbishment of Capital - $ 200,000 Buildings and State W4Q - $2m Unite Final architect drawings and hydraulic
Foyer & Amenities to be DDA Compliant Renewal Facilities and Recover plans to be approved and ITQ released.
Page 37 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.