Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix I - Stormwater Management Plan

Attached to the e-mail MCU14/0083 Appendices.

of 77

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Gateway Drive, Noosaville




Stormwater Management Plan
Reference Number: 205-002-002R
Mogpropmanagement Pty Ltd
3/10/2014
Log in to download the original file

Appendix I - Stormwater Management Plan .pdf · 7.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of pages 2 to 68 (of 77)

Page 2

Prepared by:
                                         Projex Partners Pty Ltd
                                         ACN 153 518 971 ABN 62 153 518 971
                                         Level 2, 9 Capital Place
                                         KAWANA WATERS Qld 4575

                                         Telephone:   07 5493 3649
                                         Facsimile:   07 5493 3638




DOCUMENT ISSUE RECORD

Revision
            Date Revised                           Revision Details                       Author    Checked Approved
Code

    A         03/10/2014           Original Issue                                          TH          KP




 © 2014        Projex Partners Pty Ltd
 This document is and shall remain the property of Projex Partners Pty Ltd. This document may only be used for the
 purposes for which it was commissioned in accordance with the Terms of Engagement. Unauthorised use of this document
 in any form whatsoever is prohibited.

 This report has been prepared on behalf of and for the exclusive use of the Client, and is subject to all provisions of the
 agreement between Projex Partners and the Client. Projex Partners accepts no liability or responsibility whatsoever for
 reliance upon this report by any third party.

Page 3

CONTENTS
1 INTRODUCTION                                                           1

2 SITE CONDITIONS                                                        2
2.1 EXISTING CONDITIONS                                                  2
2.1.1 LOCATION                                                           2
2.1.2 SITE TOPOGRAPHY                                                    2
2.1.3 EXISTING LAND USE                                                  3
2.2 DEVELOPED CONDITIONS                                                 3
2.2.1 DESCRIPTION OF PROPOSED DEVELOPMENT                                3
2.2.2 PROPOSED STORMWATER DRAINAGE INFRASTRUCTURE                        3

3 WATER QUALITY MANAGEMENT                                               4
3.1 GENERAL                                                              4
3.2 TEMPORARY WATER QUALITY CONTROL                                      4
3.3 PERMANENT WATER QUALITY CONTROL                                      4
3.4 WATER QUALITY OBJECTIVES                                             4
3.5 IMPLEMENTATION                                                       5
3.5.1 STORMWATER DETENTION WITH FILTRATION                               6
3.5.2 GROSS POLLUTANT TRAPS                                              7
3.5.3 CALCULATIONS                                                       7

4 STORMWATER QUANTITY MANAGEMENT                                         9
4.1 STORMWATER QUANTITY MANAGEMENT ASSESSMENT                            9
4.2 Q100 FLOOD ASSESSMENT                                                9
4.3 LAWFUL POINT OF DISCHARGE                                            9
4.4 10 YEAR ARI – CONTRIBUTING CATCHMENT FLOWS                           9
4.4.1 EXISTING SCENARIO                                                 10
4.4.2 PROPOSED DEVELOPMENT SCENARIO                                     10
4.5 100 YEAR ARI – CONTRIBUTING CATCHMENT FLOWS                         11
4.5.1 EXISTING SCENARIO                                                 11
4.5.2 PROPOSED DEVELOPMENT SCENARIO                                     11

5 CONCLUSION                                                            13




APPENDICES

Appendix A          Preliminary Layout Plans
Appendix B          Proprietary Product Information
Appendix C          Noosa Council River and Storm Tide Flood Mapping
Appendix D          Development Site Catchment Area Plan
Appendix E          PCdrain Analysis Results
Appendix F          10 year ARI – Rational Method Calculations
Appendix G          100 year ARI – Rational Method Calculations


Mogpropmanagement Pty Ltd                       Page ii                205-002-002R
Stormwater Management Plan
Noosaville Site

Page 4

       1         Introduction

                 Projex Partners have been engaged by Mogpropmanagement Pty Ltd to prepare a
                 Stormwater Management Plan (SMP) to support a Material Change of Use
                 application for the proposed development at Lot 102 on SP241371 located at
                 Gateway Drive, Noosaville. The site is approximately 0.127 ha in area and is
                 proposed to be developed for a tyre retailer.
                 The object of this Stormwater Management Plan is to demonstrate how this
                 development will comply with Council’s stormwater management requirements. More
                 specifically the objectives are to demonstrate the following:
                            How stormwater will discharge to a lawful point of discharge;
                            How the impacts of stormwater run-off quality and quantity will be reduced.
                 This SMP has been prepared with consideration of the following documentation:
                      The Noosa Plan, Planning Scheme Policy 5- Engineering Design Standards-
                       Roads, Drainage and Earthworks;
                      Queensland Urban Drainage Manual (2013);
                      Music Modelling Guidelines Version 1.0 – 2010 (Water By Design, 2010);
                      Urban Stormwater Quality Planning Guidelines (Department of Environment
                       and Heritage Protection, 2010);
                      Institute of Engineers, Australia Soil Erosion and Sediment Control
                       Engineering Guidelines for Queensland Construction Sites;
                      Preliminary layout plans at Appendix A.




Mogpropmanagement Pty Ltd                            Page 1                                   205-002-002R
Stormwater Management Plan
Noosaville Site

Page 5

       2         Site Conditions

       2.1       Existing Conditions


        2.1.1 Location

                 The site is located on the corner of Gateway Drive and Eumundi-Noosa Road,
                 Noosaville. Figure 2.1 provides a site locality map.




                 Figure 2-1 Proposed development layout



        2.1.2 Site Topography

                 The site is covered by grass, scattered shrubs and young trees. A vegetated buffer
                 exists along the southern boundary of the site. The site generally falls to the
                 northwest corner of the site at an approximate grade of 10% and discharges to
                 Gateway Drive. The maximum level on the site is approximately R.L 22m AHD at the
                 south boundary, falling to R.L 17.0m AHD in the northwest corner.




Mogpropmanagement Pty Ltd                           Page 2                             205-002-002R
Stormwater Management Plan
Noosaville Site

Page 6

        2.1.3 Existing Land Use

                 The development site presented in Figure 2.1 is identified as Lot 102 on SP241371.
                 The site is currently vacant. The site is bound by Gateway Drive on the east and
                 west. The eastern Gateway Drive joins the Eumundi-Noosa Rd/Rene St roundabout.
                 The western leg of Gateway Drive joins the eastern leg of Gateway Drive and
                 Eumundi-Noosa Rd. A vacant land parcel shares the southern boundary of the site. A
                 faction impervious of 50% has been assumed for the site and catchment contributing
                 to the underground drainage system in Gateway Drive.


       2.2       Developed Conditions


        2.2.1 Description of Proposed Development

                 The proposed development will consist of a tyre retailer (578.9m2) and provide 15 car
                 parks. The site will have a 95% fraction impervious area.


        2.2.2 Proposed Stormwater Drainage Infrastructure

                 The proposed stormwater drainage concept consists of the following:
                      An internal stormwater drainage network for the proposed development site
                       designed to convey 10 year ARI flows;
                      Flows associated with 10 year ARI rain events will be directed to the existing
                       drainage infrastructure on Gateway Drive;
                      Provision for 100 year ARI flows to be conveyed to Gateway Drive.




Mogpropmanagement Pty Ltd                        Page 3                                    205-002-002R
Stormwater Management Plan
Noosaville Site

Page 7

       3         Water Quality Management

       3.1       General

                 Water quality issues are associated with both the construction and operational
                 phases of the development.
                 Stormwater run-off will be managed and treated in accordance with the principles of
                 Water Sensitive Urban Design with the objective of improving stormwater quality by
                 removing nutrients, suspended solids and gross pollutants prior to discharge from the
                 development site.


       3.2       Temporary Water Quality Control

                 Temporary water quality control measures are required to control and filter the run-off
                 from areas disturbed during construction. These are typically erosion and sediment
                 control measures and should be the first items constructed when works begin. As
                 part of the construction drawing set, a construction Erosion and Sediment Control
                 Plan (ESCP) will be required to be generated. During the construction phase of the
                 development, an ESCP will be required to minimise the impacts upon water quality.
                 Construction disturbance and management of water release affected by acid sulphate
                 soils will also require consideration. An appropriate acid sulphate soil management
                 plan may be required to be developed and approved by the Department and
                 Environment and Heritage Protection (DEHP) prior to commencement of construction,
                 should investigation determine it is required.


       3.3       Permanent Water Quality Control

                 Permanent water control works are to be implemented to control run-off water quality
                 beyond the initial construction and maintenance stages. These control measures will
                 manage water quality control during the operational phase of the development and
                 have been designed to meet water quality objectives as described below.


       3.4       Water Quality Objectives

                 In accordance with the Urban Stormwater Quality Planning Guidelines (EHP, 2010),
                 design of treatment systems will aim to meet the following pollution load reduction
                 targets at the lawful point of discharge:
                      Total suspended solids reduction of 80% from an unmitigated development
                       case.
                      Total phosphorus reduction of 60% from an unmitigated development case.
                      Total nitrogen reduction of 45% from an unmitigated development case.



Mogpropmanagement Pty Ltd                         Page 4                                    205-002-002R
Stormwater Management Plan
Noosaville Site

Page 8

                      Gross Pollutant reduction of 90% from an unmitigated development case.


       3.5       Implementation

                 Water quality objective targets have been demonstrated to be met by implementing
                 treatments through stormwater detention/filtration systems located near the northern
                 boundary of the site and gross pollutant traps to reduce nutrient loadings, suspended
                 solids and gross pollutants.
                 A possible treatment train for the site has been developed based on the preliminary
                 drawing no. SK-02 Rev P5 by Michael Carr Architects, which outlines the proposed
                 site layout as shown on Figure 3.1 below. Drawing no. 205-002-C10.01 (refer
                 Appendix A) depicts the stormwater layout plan.




                                     Figure 3.1 Proposed development layout




Mogpropmanagement Pty Ltd                        Page 5                                   205-002-002R
Stormwater Management Plan
Noosaville Site

Page 9

                                          Figure 3.2 MUSIC layout summary
                 The treatment train includes the following stormwater quality measures (refer Figure
                 3.2):
                      All flows from the site will be directed to field inlet pits containing gross
                       pollutant traps/filter bags (EnviroPod 200 or similar);
                      Flows from all catchments, will discharge to the end of line underground
                       stormwater detention/filtration system (ZPG Stormfilter or similar) through a
                       piped network before discharging to the external stormwater system.
                 Preliminary assessment has indicated that water quality treatment utilising the
                 filtration devices can be provided in one location on the site (refer to drawing no. 205-
                 002-C10.01 in Appendix A) with further consideration given to appropriate final
                 locations to be undertaken at detailed design stage.
                 Specific aspects of the treatment train are discussed in further detail in the sections
                 below.


        3.5.1 Stormwater Detention with Filtration

                 Stormwater from all site catchments (refer to drawing no. 205-002-C13.01 in
                 Appendix A) is proposed to be treated by a Stormwater360 detention system (or
                 approved equivalent) with a 4 cartridge ZPG Stormfilter system (Stormfilter
                 requirements determined in accordance with Stormwater360 product information -
                 refer product information provided by Stormwater 360 in Appendix B).
                 Maintenance frequency of the system is determined by the pollutant loading and in
                 this case, the system is expected to require annual maintenance.
                 Access will need to be provided for the maintenance and cleaning of the stormwater
                 filters due to their location within the product. Refer to product brochures in Appendix




Mogpropmanagement Pty Ltd                          Page 6                                    205-002-002R
Stormwater Management Plan
Noosaville Site

Page 10

                 B for further information on cleaning and maintenance of the detention/filtration
                 system.


        3.5.2 Gross Pollutant Traps

                 All field inlet pits are proposed to contain gross pollutant traps/filter bags (EnviroPod
                 200 or similar) prior to discharging to the stormwater quality device as discussed in
                 Section 3.5.1.
                 Refer to product brochures in Appendix B.
                 Based on the manufacturer’s advice, it has been estimated that the average cleanout
                 frequency is approximately once annually.
                 Clear and unobstructed access to the GPT’s will be required in order to regularly
                 clean and maintain the devices. GPT’s have been located within the proposed
                 driveway and as such are accessible by vehicles for servicing. The current proposal
                 shows nominal locations to demonstrate appropriate access for maintenance. Refer
                 to product brochures in Appendix B for further information on cleaning and
                 maintenance of the gross pollutant traps.


        3.5.3 Calculations

                 Reference is made to the attached drawing no. 205-002-C13.01 (Appendix D) which
                 details the development site catchment area requiring treatment by the system, post
                 development.
                 The treatment train which incorporates a stormwater detention/filtration system and a
                 gross pollutant trap was completed using the Model for Urban Stormwater
                 Improvements Conceptualisation (MUSIC) software to estimate system performance
                 against the water quality objectives.
                 The treatment train effectiveness (refer to Figure 3.4 overleaf) shows the total
                 suspended solids (TSS), total phosphorus (TP) and total nitrogen (TN) load removal
                 performance for the treatment train which demonstrates achievement of the water
                 quality targets detailed in Section 2.4 – Water Quality Objectives.
                 Figure 3.2 provides the layout of the source and treatment nodes used in the water
                 quality modelling.




Mogpropmanagement Pty Ltd                          Page 7                                    205-002-002R
Stormwater Management Plan
Noosaville Site

Page 11

                             Figure 3.4 MUSIC Pollutant Load Reductions




Mogpropmanagement Pty Ltd               Page 8                            205-002-002R
Stormwater Management Plan
Noosaville Site

Page 12

       4         Stormwater Quantity Management

       4.1       Stormwater Quantity Management Assessment

                 The stormwater quantity management assessment demonstrates that overland flow
                 within the network is reduced as a result of this development and is therefore not
                 expected to adversely impact on the stormwater network. Further details are outlined
                 in the following sections.


       4.2       Q100 Flood Assessment

                 Review of Noosa Shire Council’s storm tide information map for area 10-D34 (which
                 includes this site) confirms that the site is not subject to storm tide inundation.
                 Additionally, the river flood information map 10-D34 map confirms that the site is not
                 subject to river inundation.
                 Refer to Council maps attached in Appendix C.


       4.3       Lawful Point of Discharge

                 The existing stormwater overland flow from the site currently sheet flows across the
                 subject property and discharges towards the northeast and northwest sections of the
                 site onto Gateway Drive.
                 The proposed development will maintain a lawful point of discharge to Gateway Drive.


       4.4       10 Year ARI – Contributing Catchment Flows

                 The total site area (0.1266 ha) accounts for less than 5% of the total catchment area
                 associated with the overall stormwater network system (2.66 ha) and as such,
                 assessment of stormwater quantity has been undertaken on the assumption that the
                 additional flows resulting from the development will be negligible. Furthermore, it is
                 assumed that the recently constructed stormwater network along Gateway Drive, east
                 of the development site has been designed with sufficient capacity to allow for
                 development of the site. Therefore, this assessment will utilise the Rational Method
                 for comparative purposes to identify flows associated with the pre and post
                 development scenarios for the 10 year and 100 year ARI rain events.
                 Analysis of the minor event recognises the requirements pertaining to pipe capacity
                 for commercial development in accordance with QUDM is for a 10 year ARI. PCdrain
                 was utilised to model the internal stormwater network to ensure the requirements of
                 QUDM are achieved. Results of the analysis confirm that the proposed internal
                 stormwater network is sufficient to accommodate 10 year ARI flows. Results are
                 presented in Appendix E.



Mogpropmanagement Pty Ltd                         Page 9                                   205-002-002R
Stormwater Management Plan
Noosaville Site

Page 13

                 Drawing number 205-002-C13.01 in Appendix D indicates the development site
                 catchment area for which this assessment was undertaken.
                 Analysis of the two scenarios indicates that there is negligible difference between the
                 pre and post development scenarios. A summary of the 10 year ARI analysis for each
                 scenario is provided as outlined below.


        4.4.1      Existing Scenario

                 As outlined in Section 2.1.2, the existing site is predominately grassed with sparse
                 vegetation. As such, a fraction impervious of 0 is applicable and a subsequent C10
                 factor of 0.70 was applied based on Table 4.5.4 of QUDM. The site has an
                 approximate grade of 11% to the north over a distance of approximately 35m. Based
                 on Table 4.6.4 and Figure 4.6 of QUDM, a time of concentration of approximately 10
                 minutes was adopted for the undeveloped scenario (Refer Appendix F).
                 The analysis of the existing scenario utilising the above parameters for the Rational
                 Method determined that the undeveloped site contributes 43 l/s to Gateway Drive for
                 a 10 year ARI rain event. This is shown in Appendix F.


        4.4.2      Proposed Development Scenario

                 The proposed development is for a commercial tyre retailer which corresponds to a
                 fraction impervious of 0.90 in accordance with Table 4.5.1 of QUDM (refer Appendix
                 F). A time of concentration of 5 minutes has been adopted for the developed scenario
                 based on the site being a relatively small catchment area which consists of
                 predominately paved surface. This supports a conservative approach.
                 The analysis of the developed scenario utilising the above parameters for the
                 Rational Method determined that the developed site will capture 69 l/s for a 10 year
                 ARI rain event. Therefore, the internal drainage infrastructure associated with the
                 development will be designed to accommodate a minimum flow of 69 l/s as required
                 in QUDM for commercial developments.
                 The proposed development connection to the existing pipe network is shown on
                 drawing no. 205-002-C10.01, which shows the indicative connection to the pit located
                 on Gateway Drive, northwest of the site.
                 Notwithstanding the above assessment, further detailed design of the internal
                 stormwater system and connection to the existing pipe network will be required to be
                 undertaken as part of the future Operational Works application for the development.
                 Thus, although the analysis indicates an increase of 26 l/s of flow captured onsite as
                 a result of the development, all flows associated with the 10 year ARI will be
                 accommodated by the internal stormwater network system. The additional flow is




Mogpropmanagement Pty Ltd                         Page 10                                   205-002-002R
Stormwater Management Plan
Noosaville Site

Page 14

                 minimal and the external stormwater network is assumed to have sufficient capacity
                 to accommodate these flows. Refer Appendix F for calculations.


       4.5       100 Year ARI – Contributing Catchment Flows

                 For comparative purposes, analysis of the major 100 year ARI event has been
                 undertaken utilising the Rational Method in accordance with QUDM for the pre and
                 post development scenarios. The parameters for the pre and post development
                 scenarios remain consistent with those utilised for the 10 year ARI analysis
                 respectively.
                 A summary of the 100 year ARI analysis for each scenario is provided as follows.
                 Refer Appendix G for the pre and post development flow calculations for the 100 year
                 ARI rain event.


        4.5.1      Existing Scenario

                 The contributing flow associated with the existing scenario for the 100 year ARI rain
                 event was determined utilising the Rational Method to be 74 l/s. The overland flow
                 currently contributes to the two pits located on Gateway Drive, north of the site.


        4.5.2      Proposed Development Scenario

                 The resultant overland flow for the proposed development scenario has been
                 determined for the 100 year ARI to be 113 l/s utilising the Rational Method. However,
                 considering that the developed scenario will include an internal stormwater network
                 which is required to accommodate flows associated with the 10 year ARI rain event,
                 the overland flow contributing to Gateway Drive will not exceed 44 l/s. Table 4.1
                 outlines the overland flow associated with the 100 year ARI event for the developed
                 scenario.

                 Table 4-1 Overland flow - Post development

                        Qtotal (l/s)        Qpipe (l/s)         Qoverland(l/s)

                             113                69                   44

                 The above comparative assessment demonstrates that the proposed development
                 scenario results in a reduction in overland flow in the catchment i.e. 44 l/s (developed
                 scenario) compared to 74 l/s (existing scenario). Refer to Appendix G for calculation
                 of both scenarios for the major event.
                 As mentioned previously, this assessment has been undertaken on the basis that the
                 recently constructed stormwater network on Gateway Drive on the east side of the
                 site will have sufficient capacity to accommodate flows associated with the
                 development for the 10 year ARI rain event. In this case, the development will result
                 in less overland flow contributing to Gateway Drive through provision of an internal


Mogpropmanagement Pty Ltd                             Page 11                                205-002-002R
Stormwater Management Plan
Noosaville Site

Page 15

                 stormwater network with the capacity of accommodating 10 year ARI flows. Table
                 Furthermore, the developed scenario results in an overall reduction in flow width in
                 comparison to the pre development scenario. Table 4.2 outlines the reduction in
                 overland flow contributing to Gateway Drive as a result of the development.

                 Table 4-2 Overland flow contributing to Gateway Drive


                    Scenario           10 year ARI (l/s)       100 year ARI (l/s)

               Pre development                43                      74
               Post development                0                      44




Mogpropmanagement Pty Ltd                            Page 12                             205-002-002R
Stormwater Management Plan
Noosaville Site

Page 16

       5         Conclusion

                 Water quality objectives have been demonstrated to be achieved through the
                 implementation of a treatment train that incorporates gross pollutant traps/filter bags
                 and a ZPG Stormfilter system to reduce total suspended solids (TSS), total
                 phosphorus (TP), total nitrogen (TN) and gross pollutants.
                 Appropriate erosion and sediment control measures will be required to be prepared
                 and implemented on site during construction activities in order to minimise water
                 quality impacts during the construction phase.

                 The stormwater quantity management assessment demonstrates that overland flow
                 within the network is reduced as a result of this development by the inclusion of the
                 pipe network on the development site. Gateway Drive will therefore benefit as result
                 of reduced overland flow contributing to the road.

                 A PCdrain analysis determined that the proposed internal stormwater network was
                 sufficient to accommodate 10 year ARI flows.

                 Notwithstanding the assessment, further detailed design of the internal stormwater
                 system and connection to the existing pipe network will be required to be undertaken
                 as part of the future Operational Works application for the development.




Mogpropmanagement Pty Ltd                         Page 13                                   205-002-002R
Stormwater Management Plan
Noosaville Site

Page 17

ProjexPartners q

APPENDIX A

Preliminary Layout Plans

Page 18

                                                                                                                                                                                                                                                                                                                                                                                                                                                       LEGEND
                                                                                                                                                                                                                                                                                                                                                                                                                                                               17           New Contours (0.1m Intervals)

                                                                                                                                                                                                                                                                                                                                                                                                                                                                            New Concrete Driveway

                                                                                                                                                                                                                                                                                                                                                                                                                                                                            New Proposed Buildings

                                                                                                                                                                                                                                                                                                                                                                                                                                                                            New Landscaping / Streetscaping

                                                                                                                                                                                                                                                                                                                                                                                                                                                                            New Kerb / Kerb & Channel

                                                                                                                                                                                                                                                                                                                                                                               BUNNINGS WAREHOUSE                                                                           New Drainage Pipe


                                                                                                                                                                                                                                                                                                                                                                                       Lot 101
                                                                                                                                                                                                                                                                                                                                                                                      SP241371
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Field Inlet / Gully Pit

                                                                                                                                 SHOPPING PRECINCT




                                                                                                                                      Lot 308
                                                                                                                                     SP114181

                                                                                                                                                                                                                                                                                                                                                          NEW R
                                                                                                                                                                                             VE                                                                                                                                                                O             AD
                                                                                                                                                                                                                                                                                  18.0




                                                                                                                                                                                                                                                17
                                                                                                                                                                                        DRI




                                                                                                                                                                                                                                              .5
                                                                                                                                                                                                                                     17
                                                                                                                                                                                                                                 .0
                                                                                                                                                                                                                                                                                                                                                              Concrete Industrial Driveway
                                                                                                                                                                                          Y



                                                                                                                                                                                                                                                                                                             .5
                                                                                                                                                                                                                                                                                                                                                              crossover. Refer to IPWEAQ
                                                                                                                                                                                      EWA




                                                                                                                                                                                                                                                                                                           1818.5
                                                                                                                                                                                                                                                               18.5                                                                     54.                   Std. Drg. SEQ R-051
                                                                                                                                                                                                                                                                                                                                             9
                                                                                                                                                                                   GAT




                                                                                                                                                                                                                                                                                                                                 50
                                                                                                                                                                                                                                                                                                                                   .0
                                                                                                                                                                                                    17.0




                                                                                                                                                                                                                                                                                                                                             19




                                                                                                                                                                                                                                                                                                                       45.0
                                                                                                                                               Existing footpath to be removed                                                                                                                                                          .0




                                                                                                                                                                                                                                                                                                         40.0
                                                                                                                                                                                                                                                                                                35.0
                                                                                                                                             to allow for driveway construction.
                                                                                                                                                                                                                 17




                                                                                                                                                                                                                                                                                      30.0
                                                                                                                                                                                                                                                                        25.0
                                                                                                                                                                                                             .5




                                                                                                                                                                                                                                                                               19.0
                                                                                                                                                                                              0.0




                                                                                                                                                                                                                                                        20.0
                                                                                                                                                                                                           5.0




                                                                                                                                                                                                                                      15.0
                                                                                                                                                                                                                         10.0
                                                                                                                                                                                                                      18


                                                                                                                                                                                                                                 18




                                                                                                                                                    Concrete Industrial Driveway
                                                                                                                                                                                                                        .0


                                                                                                                                                                                                                                .5




                                                                                                                                                    crossover. Refer to IPWEAQ                                                                                                                          Lot 102




                                                                                                                                                                                                                                                                                                                                                               19.5
                                                                                                                                                           Std. Drg. SEQ R-051                                                                                                                         SP241371
                                                                                                                                                                                                                                                                                             Proposed Building

                                                                                                                                                                                                                                                                                                                                 20.0
                                                                                                                                                                                                                                                                                                                  19.5

                                                                                                                                                                                                                                                                      20.0
W:\205 Mogprop Management\205 002 MCU Gateway Dve Noosaville\Drawings\205-002-WORKING.dwg




                                                                                                                                                                                                                                                     19.5
                                                                                                                                   Lot 500
                                                                                                                                  SP114181                                                                                                                                            Existing Vegetation Area
                                                                                                                                                                                                                                                                Lot 500
                                                                                                                                                                                                                                                                                              to remain
                                                                                                                                                                                                                                                               SP241371
                                                                                                                                                                                                                                                                 Park




                                                                                                                                                                                                                                                   AD
                                                                                                                                                                                                                                     N DI NO OSA RO
                                                                                                                                                                                                                                EUMU



                                                                                                                                                                                                                                                       OVERALL LAYOUT
                                                                                                                                                                                                                                                               SCALE: 1:500 (A3)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         PRELIMINARY ISSUE
                                                                                                                                                                                    CLIENT                                                                                                                                                                             APPROVED                              SCALE
                                                                                                                                                                                                                                                                                                                                                                                                                                               LOT 102 SP241371 GATEWAY DRIVE, NOOSAVILLE
                                                                                                                                                                                       MOGPROP                                                                                                                                                                                                                 1:250   0   5   10   15   A1
                                                                                            PROJECT MANAGEMENT - ENGINEERING - PLANNING
                                                                                                                                                                                   MANAGEMENT PTY LTD                                                                                                                                                                                                          1:500                     A3                         OVERALL LAYOUT PLAN
                                                                                            SUNSHINE COAST      MACKAY             CAIRNS                                                                                                                                                                                                                              RPEQ
                                                                                            (07) 5493 3649      (07) 4957 4988     (07) 4041 5118                                                                                         1        PRELIMINARY ISSUE                                              07/08/14      RH            KP     JB        ----                                                                           DRAWING NUMBER                                                REVISION

                                                                                            projexpartners.com.au                                                                                                                         No.                                  Description                          Date       Drawn      Design   Check     RPEQ                                                                                                   205-002-C03.01                               1
                                                                                                                                                                                                                                      THIS DRAWING MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS PREPARED BY PARTIES AGREED TO BY PROJEX PARTNERS & MUST NOT BE USED BY ANYONE ELSE OR FOR ANY OTHER PURPOSE

Page 19

ProjexPartners q

APPENDIX B

Proprietary Product Information

Page 20

                             Operations and maintenance
                                  StormFilter EnviroPod Treatment Train
                                            ®




Our waterways. Our future.

Page 21

Device details

Location of Device

 

GPS Coord N:

D P Number:

 

Relevant Council

 

 

 

 

Company
Contact Email Ph
Engineer
Contact Email Ph

 

SFEP Treatment

 

 

Frequency of Inspection/Maintenance

Inspections
(time/year)

Major
Maintenance

 

 

 

StormFilter
EnviroPod

Contents

Treatment Train Specifications 2

Introduction 4
Why cleaning and maintenance are so vitally important 4

Health and safety 5
24 Personnel health and safety 6
2.2 Traffic control 7
2.3. Confined spaces 7
34 Maintenance and monitoring of EnviroPod filters 8

Operations 8
3.2 Stormwater pit cover removal 9
3.2.1 Hinged pit grates 9
3.2.2 Non-hinged pit grates 10
3.3. Cleaning methods a
3.3.1. Cleaning using an inductor truck a
3.3.2 Hand maintenance an]
3.4 Unit inspection 14
3.5 — Filter bag inspection and rejuvenation 14
3.5.1 Clogged filters 14
3.5.2 Damaged filters 15
3.6 Disposal of material 15
4A Spill procedures 16
4.2 Blockages 16

Emergency procedures 16

Maintenance Estimated Annual Cost

StormFilter

 

EnviroPod

 

TOTAL

 

The Stormwater Management StormFilter

14
1.2
1.24
1.2.2

Description
Operation
Purpose
Sizing

StormFilter overview

1.2.3
1.2.4
1.2.5

Basic function
Priming system function
Maintenance overview

StormFilter maintenance and
performance expectations

24
2.2
2.24
2.2.2
2.3
24
244
2.4.2
2.4.3

2.4.4

2.5

2.6

Types of maintenance
Maintenance activities
Maintenance activity timing
Maintenance activity frequency
Maintenance crew requirements
Maintenance methods

Minor maintenance/inspection (twice a year)
Major maintenance inspection (once a year)
Major maintenance: sediment removal and

cartridge replacement (and emergency)
Related maintenance activities
(performed on an as-needed basis)

Typical equipment required for
maintenance activities

Material Disposal

Next steps

Page 22

Maintaining the EnviroPod                                     ®



Stormwater Gully Pit Insert



Maintenance is as integral to every stormwater management
system as it is to any other item of machinery or equipment.

The primary purpose of the EnviroPod® Stormwater Gully Pit
insert is to filter out and remove pollutants from entering
our waterways. To ensure that the EnviroPod® continues
to function effectively, it is important that the pollutants
it captures are periodically removed, and the filtration
components properly cleaned.

Maintenance requirements and frequency are dependent
on the pollutant load characteristics of each site, as well
as the occurrence of events such as chemical spills or
excessive sediment loading due to site erosion or extreme
storms. Similarly, the system should be inspected after all
major storm events.




                                                                  Stormwater360 Operations and maintenance   1

Page 23

Treatment Train
Specifications

                                                                  Regardless of the system type, the media filtration system
Performance Specification                                         shall consist of the following components;

The stormwater filtration treatment train shall consist           •   Inlet energy dissipation
of         x 200 micron gully pit basket/s and        x           •   Cartridge section
460/690mm passive, siphon-actuated, radial flow, self             •   Outlet section to bypass storm flows and convey
cleaning media filtration cartridge system/s operating at a           treated stormwater
specific flow rate of not more than 1.5L/s/m2.
                                                                  •   Access Lids in roof slab for access to Cartridges
                                                                  •   Siphon actuated cartridges filled with proprietary
The gully pit basket system shall consist of the
                                                                      ZPG™ filter media
following components;
                                                                  •   Specific flow rate of each individual cartridge limited
•   Removable 200 micron Nylon monofilament Precision
                                                                      not to exceed 1.5L/s/m2
    woven Filtration Bag
                                                                  •   Air Lock Cap complete with one way Air Valve Flap
•   Fixed Galvanised Mesh Cage (no greater than 80mm x
                                                                  •   Outer Hood complete with Scrubbing Regulators
    80mm) around the Filtration Bag
                                                                  •   Automated high-energy turbulence on the screen face
•   Recycled modified ABS plastic to seal the unit into the pit
                                                                      (only) at the end of storm flows to flush pollutants from
•   By-pass mechanism above the Filter with no moving parts
                                                                      the cartridge
•   System rigidly fixed to the walls of the pit.
                                                                  •   Centre Drainage Tube complete with Buoyancy Float
The media filtration system shall be located within the           •   Individual Cartridge Flow Restrictor Disc
following structure.
                                                                  •   ¼ Turn Bayonet Fittings
•   Manhole                                                       •   Under drain manifold to convey treated stormwater to
•   DownPipe                                                          the receiving environment.
•   Linear
•   Vault
•   Large Box
•   Detention.




2   Stormwater360 Operations and maintenance

Page 24

Components of any
proposes treatment
train or technology

The components of any proposed the treatment train                Maintenance Overview
or technology, including a gully pit basket upstream
of a radial flow cartridge filtration system, must                The primary purpose of the Stormwater Treatment Train is to
be evaluated for a range of pollutants and these                  filter out and prevent pollutants from entering our waterways.
                                                                  Like any effective filtration system, periodically these
performance expectations must comply with current
                                                                  pollutants must be removed to restore the system to its full
best practice guidelines, i.e. Water by Design "MUSIC             efficiency and effectiveness.
Modeling Guidelines version 1.0 2010" for South
East Queensland.
                                                                          aintenance requirements and frequency are
                                                                         M
In short, the performance evaluation of any system                       dependent on the pollutant load characteristics
must show:                                                               of each site. Maintenance must be performed
                                                                         in accordance with the Treatment Trains
 1   Any reduction efficiencies are justified by rigorous
                                                                         Operation and Maintenance Guidelines.
     scientific testing as determined by an independent
     peer reviewer and the results further peer reviewed and
     published in a credible scientific journal. Any potential
     or perceived conflicts of interest should be disclosed
     within the published article.

 2   Published article providing insight into the pollutant
     composition (e.g. soluble vs particulate for nitrogen)
     and the mean concentration of inflow and outflow to
     compare to local and or regional conditions.

 3   Performance evaluation undertaken in dry weather
     conditions or a method to take into account any
     potential leaching of nutrients that may occur in
     the system(s).

 4   Evaluation is conducted using full-scale systems
     with details of treatable flow rates sampled and how
     they correlate to discrete removal efficiencies and
     comparisons to the designed treatable flow rates of
     the device. A comparison should also be made to the
     climatic conditions especially where un-restricted filters
     are used.




                                                                                        Stormwater360 Operations and maintenance   3

Page 25

Introduction

This manual has been designed to assist you with cleaning
and maintaining the EnviroPod Stormwater Gully Pit Insert,
                                                             Why cleaning and maintenance are
using the methods recommended by the manufacturer.           so vitally important
The cleaning process and methods described cover all
aspects of the system, including:                            Adhering to the inspection and maintenance schedule of
                                                             each stormwater treatment device is essential to ensuring
•   Removing the grate
                                                             that it works properly throughout its estimated design life.
•   Cleaning the filter bag
                                                             During each inspection and clean, details of the mass,
•   Inspecting the unit
                                                             volume and type of material that has been collected
•   Rejuvenating the filter bag                              by the device should be recorded. This data will assist
•   Re-installing the filter bags.                           with the revision of future management plans and help
                                                             determine maintenance interval frequency. It’s also
The manual should be used in conjunction with your
                                                             essential that qualified and experienced personnel carry
site’s traffic management and safety plans, as well as
                                                             out all maintenance (including inspections, recording and
other appropriate Stormwater360 (IES) documents such
                                                             reporting) in a systematic manner. To ensure consistency, we
as the IES Employee Health and Safety Manual. We also
                                                             recommend that one person be responsible for overseeing
recommend that maintenance and cleaning contractors, or
                                                             the management of the maintenance and cleaning process.
device owners, develop their own site-specific health and
safety activity plans to ensure a safe work environment.     Maintenance of your stormwater management system is
                                                             essential to ensuring ongoing at-source control of stormwater
                                                             pollution. Maintenance also helps prevent structural failures
         Please note: This manual consists primarily of     (e.g. prevents blocked outlets) and aesthetic failures (e.g.
          the processes and tasks associated with the        debris build up).
          hand maintenance and inductor maintenance
          procedures. It does not include details of the
          site’s traffic management or occupational health
          and safety requirements. Contractors or IES
          staff should utilise their own Employee Health
          and Safety Manual, which details the policies
          and procedures for safe work.




4   Stormwater360 Operations and maintenance

Page 26

Health and safety

The EnviroPod has been designed to trap and
retain pollutants in stormwater runoff, helping              he procedures indicated in the Operations
                                                            T
                                                            section of this manual are recommended as the
to maintain the quality of water entering our
                                                            safest and most efficient manner of conducting
aquatic ecosystems. Depending on the nature                 the maintenance of EnviroPod units (Section 2),
of your site, pollutants can range from organic             however contractors and cleaning staff may
material such as leaves and sticks through to               vary the procedure in response to the site
                                                            conditions; varying work practices; or general
debris such as broken glass, syringes or other
                                                            preferences in the cleaning techniques. Please
potentially harmful materials.                              note that procedures outlined in this manual
                                                            are not exhaustive, and that any changes
Access to gully pits containing EnviroPods may              made should always comply with general safe
require removing heavy protective grates,                   work practices.

while cleaning such pits may entail working in
confined spaces. For these reasons, all aspects
                                                     Cleaning of EnviroPod filters and StormFilters is a specialist
of maintaining and cleaning your EnviroPod
                                                     activity. The material collected by the devices can be
require careful adherence to Occupational            harmful, and needs to be handled correctly. For example,
Health and Safety (OH&S) guidelines. Doing so        sediments may contain heavy metals and carcinogenic
will ensure that all maintenance personnel are       substances as well as harmful objects such as broken
                                                     glass and syringes. It is essential that Occupational Safety
adequately protected and have been properly
                                                     and Health guidelines are followed at all times, and that the
trained before taking part in any specialist         following steps are carried out to ensure safe and successful
activities. The same level of care needs to be       maintenance operations.
taken to protect non-work personnel in and           In addition to the dangers associated with the cleaning and
around the site, while appropriate traffic control   handling of material in the filter bags, precaution needs
measures must be put in place where collection       to be taken with activities such as removing the grate as
pits are situated in, or adjacent to, roadways or    well as with managing the traffic, pedestrians and other non-
                                                     worker personnel at the site. The general workplace hazards
car parks.                                           associated with working outdoors also need to be taken
                                                     into account..




                                                                           Stormwater360 Operations and maintenance   5

Page 27

2.1	Personnel health and safety
All contractors and staff must comply with all current             While cleaning and maintaining filters, all relevant precautions
workplace health and safety legislation and take all practicable   must be taken to prevent contact with sediment and litter.
steps to:                                                          This includes wearing the following personal protective and
                                                                   safety equipment:
•   Comply with all applicable laws, regulations and standards
•   Ensure that all employees, contractors and visitors are        •   Puncture resistant gloves
    informed of and understand their obligations in respect of     •   Steel capped safety boots
    current workplace health and safety legislation                •   Fluorescent safety vest
•   Ensure that employees understand and accept their              •   Overalls or similar skin protection
    responsibility to practice and promote a safe and healthy
                                                                   •   Safety apron (if necessary)*
    work environment.
                                                                   •   Eye protection (if necessary)*.

                                                                   * Higher personal safety conditions may be required when maintaining units
          ake proper care. Pollutants can range from
         T                                                           that may contain more hazardous material, for example pits where syringes
                                                                     have been observed or pits located in areas associated with such activities.
         organic materials such as leaves and sticks
         through to debris such as broken glass,
         syringes or other potentially harmful materials.




6   Stormwater360 Operations and maintenance

Page 28

2.2 Traffic control                                                 2.3 Confined spaces
Stormwater collection pits are typically situated either in or on   Confined space entry procedures are not included as part
roads and car parks, or adjacent to roads in a footpath or swale.   of this manual. For IES employees these procedures are
Traffic control requirements across all such locations differ       included as part of the IES Safety Manual. It is recommended
with most of the state and local road authorities requiring the     that all contractors evaluate their own needs for confined
same controls to be implemented whether the work is to be           space entry and compliance with Occupational Health and
conducted on the road or on the road reserve.                       Safety regulations.

As traffic requirements differ depending on road usage and          When repairs or maintenance activities cannot be conducted
the specific road configuration, separate traffic control plans     from the surface, and there is a need to enter and work in a
should be prepared for each site. Given that maintenance is         confined space, only staff with current confined space training
typically a quick process, the contractor should liaise with the    are permitted to operate in a confined space. Appropriate
relevant road authority to determine the specific road safety       measures and controls must be put in place to meet confined
requirements for each location to ensure that on site workers       space entry requirements. At all times the necessary
can conduct the cleaning operations safely and efficiently,         safety equipment must be worn, and where gas or oxygen
while complying with all laws and regulations.                      hazards occur, only staff trained in its use will use breathing
                                                                    apparatus gear. Non-trained staff must not go into
State government publications such as the NSW RMS
                                                                    confined spaces.
Traffic Control at Work Sites safety manual outline the
signage requirements, placement of barricades or witches hats
and the positioning of traffic control personnel that’s required
when working on public roads. For increased safety, IES                     onfined spaces pose a serious safety hazard
                                                                           C
recommends that the maintenance vehicle be used to shield                  for all personnel; however during the normal
the work area from oncoming traffic.                                       maintenance procedures there should be no
                                                                           reason to enter a confined space and all
Photo 1 shows the maintenance vehicle with cones placed                    maintenance procedures are able to be
around and positioned to shield the work area. Photo 2 shows               conducted from the surface.
the head-on view, note the vehicle is positioned to allow
access to the drive, whilst still blocking the pit from on-coming
traffic. The vehicle has a flashing light on the roof and the
hazard lights switched on.




 Photo 1 Vehicle positioned near pit, preventing traffic from        Photo 2 Head-on view, indicating the placement of the
 passing close to the pit.                                           vehicle near the pit.




                                                                                          Stormwater360 Operations and maintenance   7

Page 29

Operations

 nviroPod units need to be regularly inspected
E                                                        This section outlines the procedures for cleaning the
                                                         EnviroPod units. It has been written so that someone who
to determine whether they require maintenance
                                                         has never previously encountered a stormwater pit or an
or cleaning. This process involves several steps,        EnviroPod unit can carry out such maintenance by simply
and may require two or more maintenance                  following the outlined steps.
personnel working together, as well the use of
specialised equipment such as a hydraulic lifting
arm or an inductor truck with a vacuum hose.             3.1	Maintenance and monitoring of
                                                              EnviroPod filters
As gully pit grates are usually quite heavy, it is
important that correct lifting procedures are adopted,   To ensure that each EnviroPod unit achieves optimal
                                                         performance, the material collected by the filter bag should
and that the area surrounding the opened pit is
                                                         be emptied when the level of material is no more than
shielded from access to non-work personnel.              approximately half to two thirds of the total bag depth or
                                                         when there is evidence of material overflow. While the bag has
If inspection reveals that the filter bag needs to be    a greater storage capacity, it is recommended that it is not left
emptied and rejuvenated, the entire unit should also     to fill completely prior to emptying, for the following reasons:

be examined to ensure that all connections and joints    •   the bags are capable of retaining a heavy mass of material
are sound. Any material that has accumulated in the          (in excess of 50kg), which will make them more difficult to
                                                             lift and empty
overflow diversion channels or outlet pipes also needs
                                                         •   material near the top of the bag can be re-suspended
to be removed, with those areas then being flushed.
                                                             during high to extreme rainfall events
Where required, filter bags may need to be cleaned
                                                         •   blockage of the overflow sections can occur, when
or repaired, and all waste material must be disposed         material is allowed to build up above the filter bag.
of according to local guidelines at either an approved
                                                         It is also recommended that additional monitoring is
disposal site or transfer station.                       conducted following moderate to extreme rainfall events,
                                                         especially when preceding months have had little or no
                                                         rainfall. This increased frequency of monitoring is necessary
                                                         as there is a greater accumulation of surface contamination
                                                         during low rainfall periods, which will then enter the unit with
                                                         the higher volumes of runoff generated during a major rainfall
                                                         event. It is also important to ensure that the units have not
                                                         been damaged due to high pipe velocities.




8   Stormwater360 Operations and maintenance

Page 30

3.2 Stormwater pit cover removal
3.2.1 Hinged pit grates

These are the steps for opening a hinged pit grate:
                                                                       Please note: Many cast iron hinges are not hinged
 1   Insert the lifting hooks beneath the grate.
                                                                        securely (to enable the removal of the grate). This
     (Position indicated in Photo 3)
                                                                        may result in the pit grate not being able to sit in an
 2   Check hinge point is not damaged and debris is not                 open position. Additionally the hinge pins may also
     caught in the hinge area.                                          be damaged or corroded, which may allow the
                                                                        grate to fall into the pit. Such pit grates can be
3    Fully open pit grate, ensuring that the grate will stay in
                                                                        removed using the method indicated below for
     the open position without any external forces applied.
                                                                        non-hinged grates.
     Grates that do not remain open without being held
     should be removed or secured during cleaning or
     maintenance activities. Photo 4 indicates the grate being
     opened and grate resting freely in the open position,
     respectively.




 Photo 3 Lifting the grate                                        Photo 4 Fully open grate




 Photo 5 Lowering grate



                                                                                       Stormwater360 Operations and maintenance   9

Page 31

3.2.2 Non-hinged pit grates
To remove a non-hinged pit grate:

 1    Place lifting hooks beneath grate, where possible in the
      four corners of the grate (see Photo 6). Concrete lids
      may have Gatic lifting points, a key arrangement or holes
      in the lid, which may require special equipment such as
      Gatic lifters

 2    Position each person either side of the grate
      (see Photo 7)

 3    Lift the grate, ensuring that good heavy lifting posture is
      used at all times

 4    Place the grate on an angle on the gutter, to allow for the
      lifting hooks to be removed (see Photo 8)
                                                                     Photo 6 Insert hook near edge of grate
 5    For extremely heavy one-piece grates and concrete Gatic
      covers, insert the lifters in place and slide the lids back.
      Note some lids may still require two people




 Photo 7 Position each lifter either side of the grate               Photo 8 Lift grate and move grate to one side




 Photo 9 Lift grate above the support frame                          Photo 10 Reinstated non hinged grate




10   Stormwater360 Operations and Maintenance

Page 32

3.3 Cleaning methods
One of the following maintenance methods should be used for servicing EnviroPod Filters:


3.3.1 Cleaning using an inductor truck                                3.3.2 Hand maintenance

Follow these steps to safely and efficiently clean the                To clean the EnviroPod manually by hand, follow
EnviroPod using an inductor truck:                                    these steps:

 1   Open gully pit (See Section 3.2)                                  1   Open gully pit (See Section 1)

 2   Place the inductor hose over the material collected in the       2    Place the lifting hooks in the lifting loops of the filter bag
     filter bag and switch on the inductor                                 (See Photo 12)

 3   Using the inductor hose, suck out all of the sediment,           3    For extremely heavy and overfilled bags either use a
     organic leaf material, litter etc. collected in the filter bag        hydraulic lifting arm to lift the bag, or remove excess
                                                                           material using a shovel or similar piece of equipment.
 4   Allow the filter bag to be sucked up into the inductor
                                                                           IES prefers the use of a post hole shovel, due to the
     hose for a few seconds to allow for the filter mesh
                                                                           reduced strain on the back when digging and the ability
     pores to be cleaned. Care is to be taken that there are
                                                                           of the shovel to grab material vertically
     no sharp edges on the inductor hose that can damage
     the filter bag                                                   4    Lift the bag vertically off the supporting frame, ensuring
                                                                           that no undue pressure is placed on the filter bag.
 5   If material has built up around the overflows, use the
                                                                           (See Photo 13)
     inductor hose to clear the accumulated material
                                                                      5    Lift the bag clear of the stormwater pit (See Photo 14)
 6   Remove filter bag from the pit
                                                                      6    Position the bag over the truck or other collection
 7   Sediment retained in the gully pit grate is to be removed
                                                                           vehicle, taking hold of the loops at the base of the bag
 8   Back-opening channels are to be cleared of any debris                 (See Photo 15 and Photo 16)
     to ensure flow is not hindered. This debris can also be
                                                                       7   Lift and empty the filter bag by holding the bottom
     collected using the inductor truck
                                                                           lifting loops only (See Photo 17)
 9   All gully pit waste is to be removed from the pit
                                                                      8    Completely empty the filter bag (See Photo 18)
10   Check the EnviroPod unit (Section 3.4)
                                                                      9    Brush the filter bag with a stiff brush to remove bound
11   Check filter bag (Section 3.4)                                        sediment from the filter pores
12   Reinstate filter bag and gully pit lids                          10   Check the EnviroPod unit (Section 3.4)

                                                                      11   Check the filter bag (Section 3.5)

                                                                      12   Reinstate filter bag, ensuring bag is installed the correct
                                                                           way (See Photo 19 and Photo 20)

                                                                      13   Reinstate gully pit lids (See Photo 21 and Photo 22)




 Photo 11 Cleaning an EnviroPod using the inductor method




                                                                                            Stormwater360 Operations and Maintenance   11

Page 33

 Photo 12 Place the lifting hooks through the bag loops   Photo 13 Lift the bag from the cage and support frame




 Photo 14 Lift the bag from the stormwater pit            Photo 15 Lift the bag onto the collection vehicle




 Photo 16 Grab the bottom lifting loops                   Photo 17 Lifting the bottom bag loops empty the filter bag




12   Stormwater360 Operations and maintenance

Page 34

Photo 18 Completely empty the contents of the filter bag   Photo 19 Reinstall filter bag




Photo 20 Ensure that the unit is positioned correctly,     Photo 21 Correctly installed filter bag
with the lifting loops on the inside



                                                                 Please note: Under no circumstances are
                                                                 gully pit sediments to be backwashed into
                                                                 the gully pit.




Photo 22 Installed filter bag and sealed pit




                                                                               Stormwater360 Operations and maintenance   13

Page 35

    Photo 23 Check seals are pushed against the pit walls           Photo 24 Check joining rivets (two piece unit shown above)




3.4 Unit inspection                                             3.5	Filter bag inspection
After the EnviroPod filter bag has been removed, emptied
                                                                     and rejuvenation
and cleaned, the following should be checked to ensure that
the unit has not been damaged:                                  After the filter bags have been emptied and cleaned, they
                                                                should be inspected to evaluate their condition. Given the
•    All connections and joints should be checked and broken    nature of stormwater, the filter bag may become considerably
     rivets replaced (See Photo 23)                             clogged with fine sediment or damaged by various objects
•    The plastic pit seals should be inspected for unit         in stormwater as well as fauna. Sharp material such as sticks,
     movement or damage (See Photo 24)                          combined with high velocity water and a large mass in the
•    The cage should be inspected for damage or movement.       filter bag, can cause small tears in the filter material. Animals
                                                                such as rats have also been known to chew through fine mesh
The overflow diversion channels, and the area between the
                                                                filter bags located in gully pits near takeaway food outlets.
EnviroPod cage and pit wall should also be inspected for any
accumulated debris. Any observed debris should be removed
and disposed of off-site. Accumulated material within the       3.5.1 Clogged filters
outlet pipe may also need to be flushed.
                                                                Clogged filter bags can be cleaned using several different
If spare parts are required, Stormwater360 is able to provide   methods. If the techniques described in the general
these at a cost to the owner of the EnviroPod unit, although    maintenance sections above do not adequately clean the filter
these parts may also be obtained from other suppliers.          bags, the following options should be considered:

                                                                •    Using a stiff brush and a bucket of soapy water, scrub the
                                                                     filter bag surface.
          Please note: If the units are not cleaned
                                                                •    Remove filter bags from the pit and wash the bags using a
           regularly, the mobilisation of material collected
                                                                     high pressure water spray, taking care not to transfer the
           in the EnviroPod unit may occur. As such,
                                                                     contamination elsewhere. Wastewater from the process
           cleaning of the units in accordance with this
                                                                     should be collected and disposed of correctly.
           management plan is required. As this plan is
           based on observations and data collected             •    Remove the filter bags from the pits and the support rings
           during the monitoring period, ongoing                     and wash the bags in an industrial washing machine.
           adjustment of the cleaning frequency is              This final option typically results in the bags appearing
           generally required to improve the overall            like new, with no visible stain or pore clogging within the
           efficiency in the removal of collected material      filter mesh.
           and prevent material overflow.




14    Stormwater360 Operations and maintenance

Page 36

 Photo 25 Slightly clogged filter bag, indicated by the brown         Photo 26 A clean used filter bag
 stain on in the centre of the bag


3.5.2 Damaged filters                                                3.6 Disposal of material
Damaged filter bags can often be repaired, provided the              All gully pit wastes are to be taken off site and disposed
damage is small. Small tears in the fabric may occur due to          of at a transfer station or similar approved disposal site.
several reasons, however the overall strength and structure          Stormwater sediments can contain lead, copper, zinc,
of the nylon fabric typically prevents small tears becoming          mercury, hydrocarbons and PCBs, which are harmful to
much larger. Although the bag is unlikely to tear further, care      both humans and the receiving environment. Appropriate
must be used when cleaning torn bags so as not to spill the          sampling and laboratory analysis may be required to
collected material into the pit.                                     classify the material as suitable for reuse, or disposal under
Small tears may be repaired by either sewing the tear back           appropriate local guidelines.
together with additional fabric to increase the strength of the
stitching, or by sewing a patch of the filter material onto the
filter bag. If large tears are present, the filter bag may need to
be replaced as it is no longer able to function as intended.




                                                                                           Stormwater360 Operations and maintenance   15

Page 37

Emergency procedures

Spills and blockages can have an immediate impact on          4.2 Blockages
the performance of a stormwater management system,
and can potentially result in serious damage to built         In the unlikely event of surface flooding around a gully pit
infrastructure as well as the surrounding waterways           fitted with an EnviroPod the following steps should be
                                                              carried out:
and wetlands.
                                                               1   Check EnviroPod overflow bypass. The EnviroPod filter
                                                                   has been designed with an overflow mechanism built
In these types of emergencies, it is important to act
                                                                   into the filter box. If surface flooding still exists, check
quickly to remediate the problem by removing affected              the overflow slots underneath the rubber seal. If debris
sediment or clearing the cause of the blockage, so                 is lodged in the overflow slots it can be easily cleared by
that the system can resume normal and effective                    hand or a steel rod.
functioning as soon as possible.                               2   If overflow is clear and surface flooding still exists remove
                                                                   EnviroPod and check outlet pipe for blockages.

                                                                   Removal of the EnviroPod may be difficult if the filter is
4.1 Spill procedures                                           3
                                                                   clogged and the EnviroPod is holding water. If the filter
                                                                   is clogged, brush the sidewalls of the filter with a yard
In the event of a spill discharging into any gully pit, all        broom or similar. This will dislodge particles trapped
sediment is to be extracted and the filter bags are to             at the interface allowing contained water to flow
be removed and replaced with rejuvenated filter bags.              through the filter.
Normal operation procedures apply to additional cleaning
as a result of spills.                                         4   If the outlet pipe is blocked, it is likely that a gully
                                                                   sucker truck will be required to unblock it. Debris
                                                                   should be removed from the EnviroPod with the gully
                                                                   sucker truck before removal of the EnviroPod filter. If
                                                                   a gully sucker truck is not available and the EnviroPod
                                                                   needs to be removed by hand, follow the steps below:
                                                               a   Remove excess debris by hand or brush the side
                                                                   of the filter.

                                                               b   Lift and place filter ring through the filter box and
                                                                   into cage.

                                                               c   Remove Filter box.

                                                               d   Lift cage containing filter bag and ring out of the pit.

                                                               e   Unblock outlet pipe.




16   Stormwater360 Operations and maintenance

Page 38

The Stormwater
Management StormFilter
                                                         ®




For almost two decades the Stormwater Management
StormFilter ® has helped meet the most stringent stormwater
quality requirements.

The system has been continually tested and refined, to
ensure it achieves maximum reliability and performance.

As a best management practice (BMP) system, it removes the
most challenging target pollutants – including fine solids,
soluble heavy metals, oils and total nutrients (including
soluble) – by using a variety of media to achieve site-specific
pollutant removal objectives.




                                                                  Stormwater360 Operations and maintenance   17

Page 39

StormFilter overview              ®




1.1 Description                                                      1.2.2 Sizing

                                                                     The StormFilter is typically sized to meet design water quality
StormFilter is a passive, flow-through stormwater filtration
                                                                     objectives, which are subject to legislation regulated by local
system consisting of vaults that house rechargeable
                                                                     government authorities and other relevant environmental
cartridges filled with a variety of filter media, and is installed
                                                                     bodies. MUSIC modelling software is used to determine
in-line with storm drains. The StormFilter works by passing
                                                                     pollutant loads from a site, influenced by a number of factors
stormwater through media-filled cartridges, which trap
                                                                     such as site area, imperviousness and land use. Pollutant
particulates and adsorb materials such as dissolved metals
                                                                     load reduction capabilities, based on third party testing,
and hydrocarbons. After being filtered through the media,
                                                                     allows the number of StormFilter cartridges required to
the treated stormwater flows into a collection pipe or
                                                                     achieve the relevant objectives to be established. Cartridges
discharges into an open channel drainage way. StormFilter
                                                                     are designed to treat a peak flow between 0.7 and 1.6 litres/
is offered in three different configurations: cast-in-place,
                                                                     second, depending on the cartridge size used. For example,
precast and linear. The precast and linear models utilise
                                                                     10 standard sized cartridges (460mm) are able to treat 11
pre-manufactured vaults. The cast-in-place units are
                                                                     L/s, as each filter can treat 1.1 L/s.
customised for larger flows and may be either covered or
uncovered underground units.                                         Because of the highly porous nature of the granular filter
                                                                     media, the flow through a newly installed cartridge is restricted
                                                                     to 1 L/s (average 460mm), using a restrictor disc, to ensure
1.2 Operation                                                        adequate pollutant-media contact time.




1.2.1 Purpose

The StormFilter is a passive stormwater filtration system
designed to improve the quality of stormwater runoff from
the urban environment before it enters receiving waterways.

Through independent third party studies, it has been
demonstrated that the StormFilter is highly effective for
treatment of first flush flows, and fast-paced flows, during
the latter part of a storm. In general, StormFilter’s efficiency
is highest when pollutant concentrations are highest.
The primary target pollutants for removal are: sediments
(TSS), soluble metals, soluble phosphorus, nitrates, and
oil and grease.

                                                                      Photo 27 Filter cartridge




18   Stormwater360 Operations and maintenance

Page 40

1.2.3 Basic function                                               1.2.5 Maintenance overview

The StormFilter is designed to siphon stormwater runoff            The primary purpose of the StormFilter is to filter out and
through a filter cartridge containing media. The variety of        prevent pollutants from entering our waterways. Like any
media available can be designed to act as a mechanical             effective filtration system, these pollutants must be removed
filter to remove sediments, as an ion exchanger to remove          periodically to restore the StormFilter to its full efficiency and
dissolved heavy metals, and as an absorber to remove oils          effectiveness. Maintenance requirements and frequency are
and greases.                                                       dependent on the pollutant load characteristics of each site.
                                                                   To assist the owner with maintenance issues, Stormwater360
                                                                   provides detailed Operation and Maintenance Guidelines with
1.2.4 Priming system function
                                                                   each unit.

The treated stormwater collects in the centre tube of the          Stormwater360 can provide maintenance services completely,
cartridge, which is equipped with a self-priming siphon            or in part. Available services include tracking of installed
system. (Figure 1 illustrates this system.) The key component      systems, advising the system’s owner of maintenance needs,
of the system is the plastic float, consisting of a ball located   and notification of the regulatory agency once the system has
at the base leading up to a larger portion, which provides         been maintained.
increased buoyancy. Initially the ball rests in a seat,
                                                                   Maintenance is usually performed in the dryer periods
effectively closing off the port to the drainage manifold.
                                                                   to rejuvenate the filter media and prepare the system for
As a result, the filter fills the centre drainage tube until the   the next rainy period. Maintenance activities can also
water level has risen high enough to purge the air from the        be required in the event of a chemical spill or excessive
filter cartridges and displaces the float. At a water depth of     sediment loading due to site erosion or extreme storms.
22 inches the float pulls loose and allows the filtered water      It is good practice to inspect the system after severe
to drain out through the manifold. This effectively “primes”       storm events.
a siphon within the drainage tube and greatly increases the
potential across the filter. The priming system increases
StormFilter’s ability to be loaded with sediment. A related                      AIR LOCK CAP WITH CHECK VALVE
                                                                                                                               LIFTING TAB

feature is the cartridge “hood”. This hood maintains the                                                                            FLOAT VALVE

siphon effect by preventing air from being drawn into the
cartridge until the external water level drops below the                                                                                 OUTER MESH
                                                                              FILTER MEDIA
bottom of the hood.
                                                                                                                                               HOOD
                                                                           CENTER TUBE
Cartridges are connected to the manifold with a plastic
                                                                        SCRUBBING REGULATOR
connector. These can be either quarter turn connectors or in
the older systems, threaded connectors.                                     UNFILTERED WATER

                                                                                                                                             UNFILTERED WATER
StormFilter is also equipped with flow spreaders that trap            UNDER- DRAIN
                                                                                                                                                   FILTERED WATER
                                                                      MANIFOLD
floating debris and surface films, even during overflow
conditions. Depending on individual site characteristics,                   FILTERED
                                                                             WATER
some systems are equipped with high and/or low flow
bypasses. High flow bypasses are installed when the                                                              UNDER-DRAIN MANIFOLD
                                                                                                                                               VAULT FLOOR
                                                                                                                 CAST INTO VAULT FLOOR
calculated peak storm event generates a flow that
overcomes the overflow capacity of the system. This is              Figure 1 Filter cartridge
especially important for precast systems. Low flow bypasses
are sometimes installed to bypass continuous inflows
caused by ground water seepage, which usually do not
require treatment. All StormFilter units are designed with
an overflow. The overflow operates when the inflow rate is
greater than the infiltration capacity of the filter media.




                                                                                                        Stormwater360 Operations and maintenance                    19

Page 41

StormFilter maintenance          ®



and performance
expectations

To ensure the optimal and ongoing performance of the      While some maintenance activities can be completed
                                                          by hand, others require specialised equipment such as
StormFilter, the system requires systematic inspection,
                                                          an inductor truck with a vacuum hose. In all cases, it is
cleaning and maintenance. This maintenance                important that maintenance staff are properly trained
regime falls into two categories – ongoing minor          in the functioning of the StormFilter system and have a
inspection and maintenance, and major cleaning and        good knowledge of the correct procedures for disposing
                                                          contaminated sediment as well as the methods for removing
maintenance. The maintenance frequency is largely
                                                          and installing StormFilter media cartridges.
determined by the conditions of each site, and the
                                                          At all times, appropriate safety equipment must be used, and
amount of sedimentation in the stormwater runoff
                                                          Occupational Health And Safety (OH&S) guidelines adhered to.
that flows through the system. Unexpected events
such as chemical spills, erosion or extreme storm
activity require immediate inspection of the system,
together with removal of debris or contaminated
sediment, and where appropriate, replacement of the
media cartridges.




20   Stormwater360 Operations and maintenance

Page 42

2.1 Types of maintenance
Presently, procedures have been developed for two levels               Inspection/minor maintenance typically involves opening
of maintenance:                                                        the flow restricting valves (to pre-set levels) and cleaning up
                                                                       vegetation and debris. Major maintenance typically includes
•    Inspection and/or minor maintenance
                                                                       cartridge recharging. Major maintenance may involve disposal
•    Major maintenance.                                                of materials that require consideration of regulatory guidelines.
Inspection/minor maintenance activities are combined since             Depending on the particular unit configuration and equipment
the minor maintenance does not require special equipment               used, major maintenance may require an understanding
and typically little or no materials are in need of disposal.          of OSHA rules. Table 1 summarises the primary activities
                                                                       associated with StormFilter maintenance.


Table 1: StormFilter

    Facility component          Maintenance activity        When maintenance                         Expected facility performance
    requiring maintenance                                   activity is required                     after maintaining

    StormFilter cartridges      Litter and                  Floatable objects or other litter        Permanent removal from
    and containment structure   debris removal              is present in the filter. Remove         storm system.
                                                            to avoid hindrance of filtration
                                                            and eliminate unsightly debris
                                                            and litter.

    StormFilter cartridges      Cartridge replacement       Media has been contaminated              New media is able to effectively
    and containment structure   and sediment removal        by high levels of pollutants,            treat stormwater.
                                                            such as after a spill.

    Drainage system piping      Flushing with water         Drainage system is obstructed            Outflow is not restricted.
                                                            by debris or sediment.




                                                                                                Stormwater360 Operations and maintenance   21

Page 43

2.2 Maintenance activities                                                 2.2.2 Maintenance activity frequency

                                                                           The primary factor controlling timing of maintenance for the
                                                                           StormFilter is sedimentation. A properly functioning system
2.2.1 Maintenance activity timing                                          will remove solids from water by trapping these particulates
                                                                           within the porous structure of the media. The flow through
Two scheduled inspections/maintenance activities should take
                                                                           the system will naturally decrease as more and more solids
place during the year. During the minor maintenance activities
                                                                           are trapped. Eventually the flow through a system will be
(routine inspection, debris removal), the type of major
                                                                           low enough to require replacement of the cartridges. Sediment
maintenance required is determined and, if required for
                                                                           should be removed from upstream trapping devices on an
disposal, samples of the sediments and media are obtained.
                                                                           as-needed basis to prevent material from being re-suspended
The next scheduled date is to perform major maintenance                    and discharged to the system.
activities (replacement of the filter cartridges and associated
                                                                           Site conditions greatly influence maintenance requirements.
sediment removal). In addition to the scheduled activities, it
                                                                           StormFilter units located in areas with erosion or active
is important to check the condition of the filter after major
                                                                           construction should be inspected and maintained more
storms to check for damage caused by high flows and to
                                                                           often than those in fully established areas. The maintenance
check for high sediment accumulation, which may be caused
                                                                           frequency may be adjusted as additional monitoring
by localised erosion in the drainage area. It may be necessary
                                                                           information becomes available during the inspection program.
to adjust maintenance activity scheduling depending on the
                                                                           Areas that develop known problems should be inspected
actual operating conditions encountered by the system.
                                                                           more frequently than areas that demonstrate no problems,
                                                                           particularly after large storms. Ultimately, inspection and
                                                                           maintenance activities should be scheduled based on the
                                                                           historic records and characteristics of an individual filter.



2.3 Maintenance crew requirements
Table 2 lists the anticipated crew requirements for                        applicable occupational health and safety (OH&S) and disposal
maintenance operations. Removal of water and sediments                     regulations should be followed. A general description of the
during major maintenance activities can be accomplished                    maintenance activities follows.
using either a pump and water truck or a vacuum truck. All


Table 2 Anticipated Crew Requirements

                                               Inspection/Minor       Major Maintenance:          Major Maintenance:
                                               Maintenance            Sediment Removal            Cartridge Replacement

  Labourer                                     1                                                  1

  Skilled Worker                               1                      1                           1

  Vacuum/Water Truck Operator                                         1                           0/1

  Total                                        2*                     2*                          2/3*

  Special Requirements                         Knowledge of Proper    Knowledge of                Knowledge of Cartridge Removal
                                               StormFilter Function   Disposal Requirements       and Installation Procedures

* May require OH&S trained person if/when vault entry occurs.




22   Stormwater360 Operations and maintenance

Page 44

2.4 Maintenance methods

2.4.1	Minor maintenance/inspection (twice a year)

Minor maintenance typically will involve the steps below, however if it appears that a spill of some type has occurred, the local hazard
control agency and Stormwater360 should be notified immediately.


Steps for Minor Maintenance/Inspection

 1   Maintenance to be performed by a skilled worker familiar            6    Take notes about the external and internal condition. This
     with StormFilter units.                                                  includes inspecting pit penetrations, walls, lids, ladders
                                                                              and grates etc.
 2   If applicable, set up safety equipment to protect
     pedestrians from fall hazards presented by open access              7    Give particular attention to recording the level of
     covers. Also set up appropriate safety equipment for                     sediment build-up on the floor of the vault and on top
     work near roadways.                                                      of the internal components. If flow is occurring, note the
                                                                              level of water and estimate the flow rate per drainage
 3   Inspect the external condition of the unit and take notes
                                                                              pipe. Record all observations.
     concerning defects/problems.
                                                                         8    Remove large loose debris and litter using a pole with a
 4   Open the access covers to the vault and allow the system
                                                                              grapple or net on the end.
     to air out for 5-10 minutes.
                                                                         9    Close and fasten the access cover, and remove
 5   Without entering the vault, inspect the inside of the
                                                                              safety equipment.
     unit, including components.
                                                                         10   Finally, make notes about the local drainage area relative
                                                                              to ongoing construction, erosion problems, or high
                                                                              loadings of other materials to the system.



                                                                                In the case of a spill, workers should abort
                                                                                 maintenance activities until the proper guidance
                                                                                 has been obtained.




                                                                                              Stormwater360 Operations and maintenance   23

Page 45

2.4.2	Major maintenance inspection                                2.4.3	Major maintenance: sediment
      (once a year)                                                      removal and cartridge replacement
                                                                         (and emergency)
The primary goal of the major maintenance inspection is
to assess the condition of the cartridges relative to the          Major maintenance/filter cartridge replacement typically
level of sediment loading. It may be desirable to conduct          involves the steps below. However, if it appears that a spill
this inspection during a storm to observe the relative flow        of some type has occurred, the local hazard control agency
through the filter cartridges. If the submerged cartridges         and Stormwater360 should be notified immediately. In the
are severely plugged, large amounts of sediments should            case of a spill, the worker should abort maintenance
be present and very little flow will be discharging from           activities until the proper guidance has been obtained.
the drainage pipes. It is likely that the cartridges need to
                                                                   Depending on the configuration of the particular system, a
be replaced. Major maintenance inspection will typically
                                                                   worker may be required to enter the vault to perform some
involve the steps below. However, if it appears that a spill of
                                                                   tasks. If vault entry is required, OH&S rules for general
some type has occurred, the local hazard control agency
                                                                   confined space entry must be strictly adhered to. Filter
and Stormwater360 should be notified immediately. In the
                                                                   cartridge replacement should occur during dry weather
case of a spill, the worker should abort maintenance
                                                                   and it may be necessary to plug the filter inlet pipe if base
activities until the proper guidance has been obtained.
                                                                   flows exist. Standing water present in the vault should be
Steps for Pre-Major Maintenance Inspection                         regarded as polluted and contained during this operation by
                                                                   temporarily capping the manifold connectors.
 1    Maintenance to be performed by a skilled worker
      familiar with StormFilter units.

 2    If applicable, set up safety equipment to protect
                                                                          Please note: Confined space entry may be
      pedestrians from fall hazards presented by open
                                                                           required on StormFilter systems. In this case,
      doors. Also, set up appropriate safety equipment for
                                                                           please ensure that appropriate Confined Space
      work near roadways.
                                                                           entry training and subsequent certification has
 3    Inspect the external condition of the unit and take                  been undertaken and is valid, and work
      notes concerning defects/problems.                                   procedures are strictly adhered to. If you are
                                                                           unsure, do not enter the vault and contact
 4    Open the access covers to the vault and allow the vault to
                                                                           Stormwater360 immediately.
      air out for 5-10 minutes.

 5    Without entering the vault, give the inside of the unit,
      including components, a general condition inspection.

 6    Take notes about the external and internal condition.

 7    Give particular attention to recording the level of
      sediment build-up on the floor of the vault, and on top
      of the internal components.

 8    Remove large loose debris and litter using a pole with a
      grapple or net on the end.

 9    If the visit is during a storm, make the flow observations
      discussed above.

10    Close and fasten the access cover, and remove
      safety equipment.

11    Make notes about the local drainage area relative to
      ongoing construction, erosion problems, or high loading
      of other materials to the system.

12    Review the condition reports from the previous
      minor and major maintenance visits and schedule for
      cartridge replacement if needed.




24   Stormwater360 Operations and maintenance

Page 46

Steps For Cartridge Replacement Maintenance

1    Depending on the particular unit, one or two utility         14   Using the appropriate lifting cap, attach the cable and
     workers and a hauling truck operator will deliver                 remove the cartridge (up to 10kgs. each) from the
     the replacement cartridges to the site. Information               vault. It is strictly prohibited to have personnel standing
     concerning how to obtain the replacement cartridges is            under suspended cartridges. Care must also be used
     available from Stormwater360.                                     to avoid damaging the cartridges during removal
                                                                       and installation. The cost of repairing components
2    If applicable, set up safety equipment to protect
                                                                       damaged during maintenance will be the responsibility
     pedestrians from fall hazards presented by open
                                                                       of the owner unless Stormwater360 is performing
     doors. Also, set up appropriate safety equipment for
                                                                       maintenance activities and damage is not related to
     work near roadways.
                                                                       discharges to the system.
3    Inspect the external condition of the unit and take
                                                                  15   Set the used cartridge aside or load onto the
     notes concerning defects/problems.
                                                                       hauling truck.
4    Open the doors to the vault and allow the system to air
                                                                  16   Repeat steps 14 to 15 until all cartridges have
     out for 5-10 minutes.
                                                                       been removed.
5    Without entering the vault, give the inside of the unit,
                                                                  17   Remove deposited sediment from the floor of the vault.
     including components, a general condition inspection.
                                                                       This can be accomplished by using the vacuum truck
6    Make notes about the external and internal condition.
                                                                  18   Once the sediments are removed, it is necessary
7    Give particular attention to recording the level of               to assess the condition of the vault, particularly
     sediment build-up on the floor of the vault and on top            the manifold and the connectors. These are short
     of the internal components.                                       sections of 2-inch schedule 50 PVC, or threaded
     Ensuring safe working procedures are met, off load the            schedule 80 PVC that should protrude above the floor
8
     replacement cartridges (16-39kgs each) and set aside.             of the vault. If required, apply a light coating of FDA
                                                                       approved silicon grease to the outside of the exposed
9    Remove the top cap (threaded), upper seal and                     portion of the connectors. This ensures a watertight
     float from the cartridge. Repeat procedure for every              connection between the cartridge and the drainage
     cartridge within StormFilter vault. Place items in a large        pipe. Replace any damaged connectors.
     plastic container to be lifted form the vault.
                                                                  19   Using the boom, crane, or tripod, lower and install
10   Using a cordless drill and 8mm hex head, remove                   the new cartridges (typically 30kg for standard
     the three screws located around the top perimeter of              460 cartridges). Once again, take care not to
     the cartridge hood. Place screws in the large plastic             damage connectors.
     container and, once full or completed, remove plastic
     container from vault.                                        20   Close and fasten the access cover, and remove
                                                                       safety equipment.
11   Move the vacuum truck near the StormFilter vault
     on the down-wind side. Be sure that the truck is not         21   Make notes about the local drainage area relative
     too close to the vault so that fumes will not enter the           to ongoing construction, erosion problems, or high
     vault. Make sure that the last 500mm of the nozzle is             loadings of other materials to the system.
     approximately 100-125mm in outside diameter.                 22   Finally, dispose of the residual materials in accordance
     Feed vacuum nozzle into cartridge bay and start                   with applicable regulations. Make arrangements to
12
     vacuum truck. Remove cartridge hood and place                     return the used cartridges to Stormwater360.
     nozzle directly onto filter media. Completely remove
     media from each cartridge and repeat process for
     every cartridge in vault.

13   Once completed disconnect cartridges from vault floor
     and place hood back on cartridges




                                                                                        Stormwater360 Operations and maintenance   25

Page 47

2.4.4	Related maintenance activities (performed on an as-needed basis)

StormFilter units are often just one of many components in                            components be properly maintained. The maintenance/
a more comprehensive stormwater drainage and treatment                                repair of upstream facilities should be carried out prior to
system. The entire system may include catch basins, detention                         StormFilter maintenance activities. In addition to considering
vaults, sedimentation vaults and manholes, detention/                                 upstream facilities, it is also important to correct any problems
retention ponds, swales, artificial wetlands, and other                               identified in the drainage area. Drainage area concerns may
miscellaneous components. In order for maintenance of the                             include: erosion problems, heavy oil and grease loading, and
StormFilter to be successful, it is imperative that all other                         discharges of inappropriate materials.



2.5 Typical equipment required for maintenance activities
Typical equipment required for conducting maintenance is                              with available labour and equipment resources may desire
shown in Table 3. Some of the materials listed are suggestions                        to use alternative methods. However, it is advisable that
rather than requirements. It should be noted that there                               guidance from Stormwater360 be obtained prior to using
is more than one way to accomplish some tasks. Owners                                 alternative techniques.


Table 3 Maintenance Equipment Requirements

  Maintenance equipment required

  Minor maintenance                          Pre-major maintenance inspection                   Major maintenance cartridge replacement

  •   Safety equipment*: First aid,          •   Safety equipment*: First aid,                  •   Safety equipment*: First aid, cones, barricades,
      cones, barricades, flagging,               cones, barricades, flagging, flares,               flagging, flares, tape, vests, hard hats
      flares, tape, vests, hard hats             tape, vests, hard hats                         •   Work clothes: Rubber boots, overalls, and gloves
  •   Work clothes: Rubber                   •   Work clothes: Rubber boots,                    •   Door bolt, wrench, Pentasocket and
      boots, overalls, and gloves                overalls, and gloves                               miscellaneous Tools
  •   Door bolt, wrench,                     •   Door bolt, wrench, proprietary                 •   Tape measure
      proprietary lifters (e.g. Gatic)           lifters (e.g. Gatic) and
                                                                                                •   Flashlight
      and miscellaneous Tools                    miscellaneous Tools
                                                                                                •   Grapple or net pole
  •   Tape measure                           •   Tape measure
                                                                                                •   Record keeping forms
  •   Flashlight                             •   Flashlight
                                                                                                •   Vacuum truck
  •   Grapple or net pole                    •   Grapple or net pole
                                                                                                •   Replacement cartridges
  •   Record keeping forms                   •   Record keeping forms
                                                                                                •   Cartridge hauling truck
  •   Litter/debris container                •   Litter/debris container
                                                                                                •   Crane, tripod and hoist, or other lifting device
                                                                                                    (150kg minimum capacity)
                                                                                                •   Shovels
                                                                                                •   Extra 50mm PVC cartridge connectors
                                                                                                •   Spare flow restrictor discs
                                                                                                •   Litter/debris container
                                                                                                •   Vault inlet pipe plug
                                                                                                •   Dolly
                                                                                                •   PVC Pipe cutter
                                                                                                •   Ladder
                                                                                                •   Cartridge installation and removal sling

*Confined space equipment may be required for vault entry. This equipment must be used by personnel with the appropriate OH&S training. This equipment typically
  includes: Atmospheric testing devices, atmospheric purging and ventilating devices, and entry, exit, and rescue assisting devices.




26    Stormwater360 Operations and maintenance

Page 48

2.6 Material Disposal
The accumulated sediment found in stormwater treatment
and conveyance systems must be handled and disposed of
in a manner that will not allow the material to affect surface
or ground water. It is possible for sediments to contain
measurable concentrations of heavy metals and organic
chemicals (such as pesticides and petroleum products). Areas
with the greatest potential for high pollutant loading include
industrial areas and heavily travelled roads. Sediments and
water must be disposed of in accordance with all applicable
waste disposal regulations.

It is not appropriate to discharge these materials back to
the stormwater drainage system. Part of arranging for
maintenance to occur should include coordination of disposal
of solids (landfill coordination) and liquids (municipal vacuum
truck decant facility, local wastewater treatment plant,
on-site treatment and discharge). Owners should contact
the local public works department and inquire about how
the department disposes of their street waste residuals.
Stormwater360 will determine disposal methods or reuse of
the media contained in the cartridges. If the material has been
contaminated with any unusual substance, the cost of special
handling and disposal will be the responsibility of the owner.




                                                                  Stormwater360 Operations and maintenance   27

Page 49

                                                                                                    A U S T R A L I A




SFEP StormFilter & Enviropod
Maintenance Data Sheet

Date:                                        Location:                                   GPS COORD:

System size:                                 Type:       Cast-in-place       Precast     Linear

Number of Cartridges:                        Type of Cartridge:      460mm           690mm        310mm

Filter Media:     ZPG         Perlite

Type of EnviroPods:                                                                      Number of EnviroPods:

Personnel:


STORMFILTER SYSTEM OBSERVATIONS
Last service:

Sediment Depth on Vault Floor:

Structural Damage:

Cartridges submerged:       Yes         No           How deep:
Comments:

ENVIROPOD SYSTEM OBSERVATIONS
Last service:

Amount of Sediment in Basket:

Structural Damage:

Comments:

DRAINAGE AREA REPORT
Excessive Oil and Grease Loading              Yes        No       Source:

Sediment Accumulation on Pavement             Yes        No       Source:

Erosion of Landscaped Areas                   Yes        No       Source:
Comments:




STORMFILTER CARTRIDGE MAINTENANCE ACTIVITIES
Remove Litter and Debris                      Yes        No       Details:

Sediment Removed from Vault Floor             Yes        No       Details:
Quantity of Sediment Removed (estimate?):

Replace Cartridges                            Yes        No       Details:

Minor Structural Repairs                      Yes        No       Details:
Residuals (debris, sediment) Disposal Methods:

Notes/Problems:

ENVIROPOD MAINTENANCE ACTIVITIES
Number of Bags Replaced:                     Clogged EnviroPods/Bags:          Yes      No

Comments:

Page 50

                                                                                                      A U S T R A L I A




SFEP Treatment Train
Inspection Data Sheet
It may be desirable to conduct this inspection during a storm to observe the relative flow through the filter cartridges. If the sub-
merged cartridges are severely plugged, large amounts of sediments should be present, very little flow will be discharging from the
drainage pipes, and it is likely that the cartridges need to be replaced during major maintenance.


 Date:                                        Location:                                    GPS COORD:

 System size:                                 Type:       Cast-in-place      Precast       Linear

 Number of Cartridges:                        Type of Cartridge:      460mm         690mm           310mm

 Filter Media:      ZPG        Perlite

 Type of EnviroPods:                                                                       Number of EnviroPods:

 Personnel Attending Inspection:


 STORMFILTER SYSTEM OBSERVATIONS
 Last service:

 Sediment Depth on Vault Floor:

 Structural Damage:

 Cartridges submerged:        Yes        No           How deep:
 Comments:

 ENVIROPOD SYSTEM OBSERVATIONS
 Last service:

 Amount of Sediment in Basket:

 Structural Damage:

 Comments:

 DRAINAGE AREA REPORT
 Excessive Oil and Grease Loading              Yes        No       Source:

 Sediment Accumulation on Pavement             Yes        No       Source:

 Erosion of Landscaped Areas                   Yes        No       Source:
 Comments:

Page 51

Next steps
Learn more
For more detailed technical information about
Stormwater360 products and solutions, visit
www.stormwater360.com.au


Connect with us
With more than 12 years experience in developing,
installing and maintaining innovative and efficient
site-specific stormwater management solutions,
Stormwater360’s highly qualified engineers and
consultants can assist you with every aspect of your
stormwater project.

Whether it’s an initial in-house technical presentation,
a request to inspect and clean your existing facility,
or assistance with designing a specific stormwater
management solution for your site, simply complete
the enquiry form at stormwater360.com.au or call
1300 354 722 to speak to a Stormwater360 consultant.


Start a project
If you are ready to begin a project, our engineering
team will provide you with everything you need,
from a free preliminary design to MUSIC modelling,
CAD drawings to maintenance frequency and
associated costs schedules. To find out more, simply
visit www.stormwater360.com.au/custom-solutions
and complete the Design Information Request form.

Page 52

©2013 Stormwater360 Australia

Nothing in this catalogue should be construed as an expressed warranty or an implied warranty of merchantability or fitness for any particular purpose.
See the Stormwater360 Australia standard quotation or acknowledgement for applicable warranties and other terms and conditions of sale.

The product(s) described may be protected by one or more of the following US, Australian and New Zealand patents: 5,322,629; 5,624,576; 5,707,527; 5,759,415;
5,788,848; 5,985,157; 6,027,639; 6,350,374; 6,406,218; 6,641,720; 6,511,595; 6,649,048; 6,991,114; 6,998,038; 7,186,058; 705,778; 711,957; 326,257; 332,517;
780521; 336761; 299114 or other patents pending.

Stormwater Management StormFilter is a licensed trademark of Stormwater360 Australia.

Page 53

Stormwater360 supplies and maintains
a complete range of filtration,
hydrodynamic separation, screening and
oil/water separation technologies.



Call 1300 354 722




www.stormwater360.com.au

Page 54

Next generation stormwater management
            Affordable. Effective. Environmental




                         Stormwater360
                         A U S T R A L I A

Page 55

 

www.stormwater360.com.au

Page 56

                                                          We are dedicated to investment in
                                                       on-going research and development,
                                                            and through undergoing rigorous
                                                        independent scientific research and
                                                     testing, our products have proven their
                                                    efficiency and performance in the field.




Stormwater360
Specialists in managing, treating and storing stormwater.
Stormwater360 is a leader in developing innovative and efficient
site-specific solutions that manage the impact of stormwater runoff
on the built environment, and prevent contaminants in the runoff from
entering aquatic ecosystems.
Whether the primary focus of your site is flood mitigation, water
quality or stormwater harvesting, we have the expertise and products
to develop the right water sensitive urban design (WSUD) solution to
achieve your runoff objectives.
Just as importantly, with stormwater regulations and water quality
standards becoming increasingly complex and onerous, our best
management practice filtration, screening and treatment systems
meet the most stringent regulatory requirements.

Page 57

                                                             The Stormwater360 Facilities
Ecologically sustainable                                     Management Plan
stormwater management                                        Managing the cost as well as the solution
Regardless of compliance measures, astute developers         It is clear that across Australia, government bodies are
and investors recognise that there is an increasing          increasing their regulatory involvement in stormwater
demand from business, consumers and the community            management and implementing stringent best practice
for projects that incorporate high environmental             guidelines. Even where regulations have not yet been
sustainability standards and are fiscally responsible.       mandated, there is a strong economic argument for
                                                             implementing BPM stormwater management systems at
This is even more critical in urbanised areas, where         the development stage, rather than meeting the higher
stormwater water run-off contaminated by pollution,          costs associated with a future retrofit.
heavy metals, total nutrients, hydrocarbons and
sediment, can affect the health of groundwater as            To assist developers better manage the costs associated
well as the ecology of streams, ponds, lakes and             with compliance, Stormwater360 has developed
harbours. In such regions, the environmental stormwater      a Facilities Management Plan for installation of the
management solutions developed by Stormwater360              StormFilter™ / EnviroPod™ (SFEP) Treatment Train. This
are not simply a ‘nice-to-have’, but define an               plan enables you to amortise the cost of your stormwater
aspirational benchmark for all organisations that            management system over a fixed period, so you can
recognise their corporate and social responsibilities.       achieve your water quality objectives without incurring
                                                             upfront capital costs.
By viewing stormwater as an asset and a resource, and
then managing it in an ecologically sustainable manner,      The Facilities Management Plan also incorporates an
we are helping to conserve one of the planet’s most          on-going maintenance agreement, providing you with
precious resources – a resource that’s inextricably linked   budgeting certainty for the functional operation of your
to our ability to sustain future populations. Similarly,     stormwater system for the life of the agreement. In
by maintaining the health of the world’s oceans and          addition, as inefficient maintenance is often the reason
waterways, we are preventing the disruption of the           for system failure, such as flooding or the inadvertent
food chain’s biodiversity and ensuring that tomorrow’s       release of pollutants into waterways, this comprehensive
children can enjoy simple pleasures such as swimming         maintenance service also helps minimise the risk of
in clean seas.                                               future inconvenience and disruption to site users (such
                                                             as tenants), as well as mitigate the risk of penalties for
                                                             regulatory breaches.

Page 58

                                                                             By viewing stormwater as an
                                                                           asset and a resource, and then
                                                                           managing it in an ecologically
                                                                              sustainable manner, we are
                                                                           helping to conserve one of the
                                                                        planet’s most precious resources.




A comprehensive stormwater                                   •   Guaranteed maintenance

management package                                           •   No replacement or reinstatement costs
                                                             •   A warranty on all parts, including EnviroPod bags and
In total, the Stormwater360 SFEP Treatment Train                 StormFilter cartridges, for the term of the agreement
Facilities Management Plan provides you with:                •   A single point of contact for design, supply
•   Supply of all StormFilter units required by your site        and maintenance.
•   Supply of EnviroPod gully pit baskets                    From every perspective, the Stormwater360 Facilities
•   12 monthly service of StormFilter units                  Management Plan provides a smart and sustainable way
                                                             to achieve your stormwater treatment objectives.
•   3-6 month service of EnviroPods
•   Disposal of contaminants
•   Yearly compliance certificate                            An integrated end-to-end solution
•   Warranty on all parts.
                                                             From design through to supply,
The benefits of the Facilities Management Plan are           manufacture and maintenance
extensive and include:
                                                             As a dedicated stormwater management specialist,
•   No capital cost
                                                             Stormwater360 offers a complete turnkey solution that
•   Enhanced cash flow and greater budgeting certainty       includes all the resources required to take any project
•   100% tax deductibility (as an operating expense and      from the conceptual design through to construction.
    off balance sheet)                                       Plus, with either a Maintenance Agreement, or as part
•   No additional unexpected costs relating                  of our Facilities Management Plan, we ensure that your
    to maintenance                                           stormwater devices and systems continue to provide
•   Clarity of actual costs when attributing outgoings for   optimal performance throughout their entire lifecycle.
    multiple dwelling developments
•   Flexible payment and contract terms
•   Guaranteed compliance with legislated water
    quality objectives

Page 59

                                                          A comprehensive project
                                                          planning and design service
The importance and value
                                                          The Stormwater360 solution includes a design and
of on-going maintenance
                                                          planning service, whereby our engineering division works
Wherever possible, Stormwater360 selects easy-to-         with developers, contractors and jurisdictional authorities
access treatment systems that have been designed          to select a runoff solution that will meet the climate and
for minimal maintenance. However, regular cleaning        geographic challenges of the site, as well as any relevant
and device maintenance are nevertheless necessary to      regulatory requirements. Whatever methodology is
remove pollutants and ensure the proper performance of    chosen, we will provide you with everything to get the
your stormwater management system.                        project started. This includes MUSIC (Model for Urban
                                                          Stormwater Improvement Conceptualisation) modelling,
Regular maintenance schedules minimise system failure     CAD drawings and product specifications together with
and prevent unnecessary damage (and the associated        maintenance schedules and associated cost schedules.
costs) to other infrastructure or drainage assets. It
also ensures compliance with corporate environmental      Once the system has been agreed on, we work together
policy guidelines.                                        with our precast production partner to manage every
                                                          aspect of the manufacturing process.
Maintenance is also vital to minimising the development
impact on the surrounding environment.                    Our end-to-end solution includes full maintenance of
                                                          your stormwater treatment devices, such as the removal
                                                          of sediment and the rejuvenation of filters. In addition to
                                                          ensuring the full functionality of your system, we provide
                                                          detailed reports that verify your ongoing compliance with
                                                          local authority regulations.

Page 60

                                                                              To find out more about
                                                                        Stormwater360’s stormwater
                                                                 management systems, or for details
                                                                   about the Facilities Management
                                                                  Plan, speak to your Stormwater360
                                                               consultant or call us on 1300 354 722.




Best management practice systems
Innovative solutions proven through
extensive in-field testing
The Stormwater360 line of stormwater treatment
solutions comprises the most innovative and effective
products available. We are dedicated to investment
in on-going research and development, and through
undergoing rigorous independent scientific research and
testing, our products have proven their efficiency and
performance in the field. Many have achieved hundreds of
standalone Best Management Practice (BMP) approvals
from regulatory agencies around the world.
The Stormwater360 StormFilter™ / EnviroPod™ (SFEP)
Treatment Train is the only proprietary treatment train
in Australia with published independent third party
field verification of performance. While stormwater is
dynamic, and no two sites or storms are the same,
when the StormFilter™ (a siphon actuated cartridge
filtration system) is combined in a treatment train with the
EnviroPod™ gully pit basket, its performance has been
evaluated as achieving reductions of up to 85% TSS (total
suspended solids), 70% TP (total phosphorous) and 45%
TN (total nitrogen).
Across our extensive range, each product we supply and
install meets Australia’s most stringent standards and has
been verified for its effectiveness in real world – not just
laboratory – situations.

Page 61

G
ve} mela) Ph. 1300 354 722

FSC Fax. 1300 971 566
www.stormwater360.com.au

responsible sources

wwwiscog FSEC* CO23428

 

Page 62

»>

ProjexPartners 4 %

APPENDIX C

Noosa Council River and Storm Tide Flood
Mapping

Page 63

                                                                                                                                                                                                                             NOOSA




                                                T.
                                             SD N . S
                                                                                                                                                                                                                             NORTH
                                                                                                                                                                                                                                                                                                             i ve
                                                                                                                                                                                                                                                                                                                 r                                                I
                                                                                                                                                                                                                                                                                                                                                                  !




                                                                     MM
                                                                                                                                                                                                                             SHORE                                                                          R
                                                                         R
                                                                             .A                                                                                                                                                                                                                      No osa




                                                                                                                                                                                                                                                                                                                                                                  RIVER FLOOD INFORMATION MAP 10-D34 - September 2012
 www.sunshinecoast.qld.gov.au/disaster                                             VN
                                                                                            .
                                                        Cr
                                                          an




                                                                                                                                                                                                                                                                                                   A ROAD
HOW TO USE THIS MAP                                         ks                          k                         HI                                                                                                                                                              E
                                                                                                                                                                                                                                                                                                                                  N O O S A PA R A D E




                                                                               ee
                                                                                                                       LT O                                                                                                                                                  AC
                                                                             Cr                                               N TE                                                                                                                                T   ER
                                                                                                                                                                                                                                                                         R
(1) Identify locations important to                                                                                                   RRA CE
                                                                                                                                                                                                       ERRA C E                                    GY
                                                                                                                                                                                                                                                        MP
                                                                                                                                                                                                                                                             IE
                                                                                                                                                                                              M PI E T




                                                                                                                                                                                                                                                                                           W E YB
you such as home, work, and                  Doonella                                                                                                                                    GY

                                                                                                                                                                                                                         Noosa Home




                                                                                                         GO O D
where your children go to school.             Lake




                                                                                                                                                                                                                                                                                                                                                                                                                        Path: B:\Workflow\Projects\M3633_SCRC_Disaster_Management\R4815_Evacuation_Planning_Analysis\V20110809\Maps\Final Draft MXD's 23 Aug 2012\SCRC_Riverine_Flood_Hazard_Street-Level_PUBLIC_A4L_DDPAtlas_draft_20120828_1613_KelvinM.mxd - Printed on: 28/08/2012, Created by: at005, Date Created: Tuesday, 28 August 2012
                                                                                                                                      NOOSA
(2) If any of these places are in                                                                                                    LEISURE                                                                             Maker Centre




                                                                                                           CHA




                                                                                                                                                          R O AD
one of the coloured zones, you                           T E WA N T I N                                                              CENTRE                                                       G I B S O NNoosa
                                                                                                                                                                                                              R O A D Village




                                                                                                              P S
may be at risk from river




                                                                                                                  TR
                                                                                                                  EE




                                                                                                                                                          SA
flooding.




                                                                                                                       T
                                                                                                                                                                                                              Noosa




                                                                                                                                                   I N OO
(3) Discuss and develop an
                                                                                                                                                                                                              Waters                                                                                                       W E Y B A RO A
emergency plan for you and your                                                                                                                                                                               Canals                                                                                                                                    D
family, and identify potential                                                                                                                                                                                                                                                                      NOOSA AUSTRALIAN




                                                                                                                                               ND
evacuation routes and high                                                                                                                                                                                                                                                                             FOOTBALL CLUB




                                                                                                                                            MU




                                                                                                                                                                                                                                                                                        R EE T
ground in your neighbourhood in




                                                                                                                                         EU




                                                                                                                                                                                                                                                                                      R E E F ST
case roads are closed.
                                                                                                                                                         LUTHERN
(4) During an event, stay tuned                                                                                                                          OVALS
to local radio, council's website,                                                                                                                                                   N O O S AV I L L E
                                                                                                                                                         PARK



                                                                                                                                   W
                                                                                                                                       A




                                                                                                                                                                                                                                                                                         R.
                                                                                                                                         L




                                                                                                                                                                                                                                                                                        S.
facebook and twitter sites for                                                                                                                                                                                                                                                                              EE
                                                                                                                                       D TE                                                                                                                                                                      NIE
                                                                                                                                         R                                                                                                                                                                                        CRE
updates and evacuation advice.                                                                                                             I




                                                                                                                                             R E
                                                                                                                                                                                                                                                                                                                                        E K ROA
                                                                                                                                                                                                                                                                                                                                                            D


                                                                                                                                              V
                                                                                                                                               HA
                                         BC KM N
                                                        . R OA
                                                                                                                                                                                       E E N IE C R


                                                                                                                                                  Y
                                                                 D
         This area w ill flood first.                                  E UM N D. N O O S A R O A D                                                                                                            EE
                                                                                                                                                                                                                    K R




                                                                                                                                                                                                                                                                                                                   Wey ba Creek
         In a major flood, waters                                                                                                                                                                                           OAD
         will be deepest here.                                                                                                                                     E
                                                                                                                                                                       IV



                                                                                                                                                                        R H AY D R
         This area w ill flood after
         the red zone in a
         moderate flood.                                                                                                      Noosa
         This area w ill flood after                                                                                           Civic                                                                                                                                                                                               NOOSA
                                                                                                                                                                        LTE


         the orange zone in a                                                                                                                                                                                                                                                                                                      HEADS
         major flood.
                                                                                                                                                                       A




                                                                                                     ie C
                                                                                                                                                                   W
                                                                                                en




                                                                                                         r ee
         This area m ay flood in                                                                E                 k
         an extreme flood event
         but water will be                                                                                                                                                                                                                                                                                                               Lake
         shallow er than other                                                                                                                                                                                                                                                                                                          Weyba
         zones.                                                                                         Disclaimer
                                                                                                        This map has been produced in response to the recom mendations of the Qld Floods Commission of Inquiry to prom ote           While every care is taken to ensure the accuracy of this product, neither the Sunshine Coast Council nor the
                                                                                                        awareness of potential flood prone areas. The inform ation is of a general nature and is not intended to replace the         State of Q ueensland m akes any representations or warranties about its accuracy, liability, completeness or
                                                                                                        need for site specific enquiry of Council records or to be a substitute for more formal flooding investigation required in
                                         0              125           250                   500                                                                                                                                      suitability for any particular purpose and disclaim s all responsibility and all liability (including without lim itation,
                                                                                                        any developm ent approval or perm it process. The information presented on this map is either model based,
                                                                                                                                                                                                                                     liability in negligence) for losses, damages (including indirect or consequential damage) and costs that may
                   Major Roads                                       Metres
                                                                                                        derived from historic flood data, or estim ated using the best judgem ent of a professional hydrologist. The m ap
                                                                                                        is not accurate to the scale of a specific property and for som e areas flood information is not available.                  occur as a result of the product being inaccurate or incomplete in any way or for any reason.

Page 64

                                                          T.
                                                       SD N . S
                                                       DO NLL
                                                                   . STR E
                                                                               ET                                                                                                                                                                                                                NOOSA
                                                                                                                                                                                                                                                                                                 NORTH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 I
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 !




                                                                              M
                                                                                 M
                                                                                       R
                                                                                           . A




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 S T O R M T ID E IN F O R M AT IO N M A P 1 0 -D 3 4 - S e p te m b e r 2 0 1 2
w w w. noosa.qld.gov.au                                                                          VN                                                                                                                                                                                              SHORE
                                                                                                       .
H O W T O U S E T H IS M A P                                        Cr                             k                                                                     N o osa River                                                                                                                                                             RA
                                                                                                                                                                                                                                                                                                                                                         CE
                                                                                                                                                                                                                                                                                                                                                                                                                       N O O S A PA R A D E
                                                                      an                         ee                                                                                                                                                                                                                                          R




                                                                                                                                                                                                                                                                                                                                                                            D
                                                                                                                              HI                                                                                                                                                                                                          TE
                                                                                    ks C




                                                                                                                                                                                                                                                                                                                                                                      A ROA
                                                                                                                                                                                                                                                                                                                                    IE




                                                                                           r
                                                                                                                                      LT O N                                                                                                                                                                                 MP
                                                                                                                                                                                                                                                                                                                       GY
(1) Identify locations im portant to                                                                                                                    TERRA
                                                                                                                                                                               CE
you such as hom e, w ork, and




                                                                                                                                                                                                                                                                                                                                                                    WEYB
                                                                                                                                                                                                                                             G YM PIE TE R R AC
                                                                                                                                                                                                                                                                                   E
                                                                                                                                                                                                                                                                                  Noosa Hom e




                                                                                                                   GOODC
w here your childre n g o to school.
                                                                                                                                                             NOO SA




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Pa th : B: \W o rk flo w \P roje c ts \M 3 63 3_ S C RC _D isa s te r_M a n ag em e nt \R 48 15 _ E v ac u at io n_ P lan nin g_ A na ly s is \V 2 0 11 0 80 9\ M ap s \F ina l D raft M X D's 2 3 A ug 2 01 2 \S CR C _S to rm T id e _F lo od _H a z ard _S t ree t-L ev e l_ P UB L IC _A 4 L _D DPA t la s _d ra ft_ 20 1 20 82 8 _1 60 4 _K e lv in M .m x d - P rin te d on : 29 /0 8/ 20 12 , Cre at ed b y : a t0 05 , Da te C rea te d: W ed n es d ay, 2 9 A ug u s t 2 01 2
(2) If any of these places are in                                                                                                                           LEISU RE                                                                                                              Maker C entre




                                                                                                                                                                                      R OAD
                                                                   T E W A N T IN




                                                                                                                      HAP
one of the coloured zone s, you                                                                                                                             CENTRE                                               G IB S                                                  Noosa Village
                                                                                                                                                                                                                                 ON R
m ay be at risk from storm tide




                                                                                                                           S TR
                                                                                                                                                                                                                                                  OAD
flooding.




                                                                                                                             EE
                                                                                                 Doonella




                                                                                                                                                                                N O OS A
                                                                                                                                  T
(3) D iscuss and develop an                                                                       Lake
                                                                                                                                                                                                                                                                                                                                                                                                           WE
em ergency plan for you and your                                                                                                                                                                                                                                                                                                                                                                                      YBA ROAD
fam ily, and identify potential                                                                                                                                                                                                                                                                                                                                          NOO SA AU STRALIA N




                                                                                                                                                                              I
                                                                                                                                                                         ND
evacuatio n routes and h igh                                                                                                                                                                                                                                                              Noosa                                                                             FO OTBALL CLU B




                                                                                                                                                                                                                                                                                                                                                                       T R EE T
                                                                                                                                                                    MU
ground in your neighbourhood in                                                                                                                                                                                                                                                           Waters




                                                                                                                                                                 EU
                                                                                                                                                                                                                                                                                          Canals
case ro ads a re closed.




                                                                                                                                                                                                                                                                                                                                                                      REEF S
                                                                                                                                                                                     LUTHERN
(4) D uring an event, stay tuned                                                                                                                                                     OVALS
to local radio, council's w ebsite,                                                                                                                                                  PAR K




                                                                                                                                                                                                                                                                                                                                                                    R.
                                                                                                                                                                                                                                                                                                                                                                   S.
facebook and tw itter sites for
updates and evacuation ad vice.
         T h is a re a w ill flo o d w h e n       B CK MN
                                                                  . ROA
                                                                          D                                                                                                                                                           E ENIE C
         th e B u re a u o f M e te o ro lo g y                                                                                                                                                                                                                 RE
                                                                                                                                                                                                                                                                         EK
                                                                                                                                                                                                                                                                                    ROAD
         (B O M ) p re d icts a sto rm tid e
         o f 1 m e tre a b o v e H AT.*                                                                                                                                                             VE



                                                                                                                                                                                                         I
                                                                                                                                                                                                            R H AY D R
         T h is a re a w ill flo o d a fte r
         th e re d zo n e w h e n th e                                   N O O S AV IL L E
                                                                                                                                                                                                                                                                                                                                                                                                                        NOOSA




                                                                                                                                                                                                                                                                                                                                                                                                          W ey
         B u re a u o f M e te o ro lo g y                                                                                                    Noosa
         (B O M ) p re d icts a sto rm tid e                                                                                                   Civic                                                                                                                                                                                                                                                                    HEADS




                                                                                                                                                                                                                                                                                                                                                                                                              ba
                                                                                                                                                                                                          LTE


         o f 1 -2 m e tre s a b o ve H AT.




                                                                                                                                                                                                                                                                                                                                                                                                                 C re
                                                                                                                                                                                                                                                                                                                                                                                                                     ek
         T h is a re a w ill flo o d a fte r
                                                                                                                                                                                                       A




                                                                                                           en ie
                                                                                                                                                                                                   W
                                                                                                           E




         th e o ra n g e z o n e w h e n th e                                                                         Cr e
                                                                                                                              ek
         B u re a u o f M e te o ro lo g y                                                                                                                                                                                                                                                                                                                                                                                            Lake
                                                                                                                                                                                                                                                                                                                                                                                                                                     We yba
         (B O M ) p re d icts a sto rm tid e
         o f 2 -3 m e tre s a b o ve H AT.
                                                                                                               Disclaim er
                     M a jo r R o a d s                                                                        T h is m a p h a s b e e n p ro d u ce d in re sp o n s e to th e re c o m m e n d a tio n s o f th e Q ld F lo o d s C o m m iss io n o f In q u iry to p ro m o te
                                                                                                               a w a re n e ss o f p o te n tia l flo o d p ro n e a re a s . T h e in fo rm a tio n is o f a g e n e ra l n a tu re a n d is n o t in te n d e d to re p la ce th e
                                                                                                                                                                                                                                                                                          W h ile e v e ry ca re is ta ke n to e n su re th e a cc u ra cy o f th is p ro d u ct, n e ith e r th e S u n sh in e C o a st C o u n cil n o r th e
                                                                                                                                                                                                                                                                                          S ta te o f Q u e e n s la n d m a k e s a n y re p re se n ta tio n s o r w a rra n tie s a b o u t its a c cu ra cy , lia b ility , co m p le te n e ss o r
                                                                                                               n e e d fo r s ite s p e c ific e n q u iry o f C o u n cil re co rd s o r to b e a s u b stitu te fo r m o re fo rm a l flo o d in g in ve stig a tio n re q u ire d in   su ita b ility fo r a n y p a rticu la r p u rp o se a n d d is cla im s a ll re s p o n sib ility a n d a ll lia b ility (in clu d in g w ith o u t lim ita tio n ,
                                                   0              12 5          25 0               50 0        a n y d e v e lo p m e n t a p p ro v a l o r p e rm it p ro c e s s. T h e in fo rm a tio n p re se n te d o n th is m a p is e ith e r m o d e l b a se d ,
* HAT- H ig h est A stro no m ica l Tide                                      M e tre s
                                                                                                               d e riv e d fro m h isto ric flo o d d a ta , o r e s tim a te d u sin g th e b e s t ju d g e m e n t o f a p ro fe s sio n a l h yd ro lo g is t. T h e m a p
                                                                                                               is n o t a cc u ra te to th e sca le o f a sp e cific p ro p e rty a n d fo r so m e a re a s flo o d in fo rm a tio n is n o t a v a ila b le .
                                                                                                                                                                                                                                                                                          lia b ility in n e g lig e n c e ) fo r lo ss e s , d a m a g e s (in clu d in g in d ire ct o r c o n s e q u e n tia l d a m a g e ) a n d c o s ts th a t m a y
                                                                                                                                                                                                                                                                                          o c cu r a s a re s u lt o f th e p ro d u c t b e in g in a ccu ra te o r in co m p le te in a n y w a y o r fo r a n y re a s o n .

le ve ls a re sim ilar to K in g Tid e le ve ls.

Page 65

»>

ProjexPartners 4 %

APPENDIX D

Development Site Catchment Area Plan

Page 66

                                                                                                                                                                                                                                                                                                                                                                                                                              DRAINAGE CATCHMENT LEGEND
                                                                                                                                                                                                                                                                                                                                                                                                                                           255.5               New Contours
                                                                                                                                                                                                                                                                                                                                                                                                                                                               New Drainage Pipe
                                                                                                                                                                                                                                                                                                                                                                                                                                                               Catchment Areas

                                                                                                                                                                                                                                                                                                                                                                                                                                                               Gully Pit, Field Inlet,
                                                                                                                                                                                                                                                                                                                                                                                                                                                               Manhole, Headwall

                                                                                                                                                                                                                                                                                                                                                                                                                                                               New Pit No./Line No.


                                                                                                                                                                                                                                                                                                                                                                                                                                                               Existing Stormwater Pipe
                                                                                                                                                                                                                                                                                                                                                       BUNNINGS WAREHOUSE
                                                                                                                                                                                                                                                                                                                                                                                                                                           255.5               Existing Contours




                                                                                                                       SHOPPING PRECINCT




                                                                                                                                                                                                                                                                                                                                     NEW R                                                                                 CATCHMENT AREA TABLE
                                                                                                                                                                                                                                                                                                                                                   OAD
                                                                                                                                                           VE


                                                                                                                                                                                                                                                     18.0                                                                                                                                                                  CATCHMENT    AREA




                                                                                                                                                                                                                17
                                                                                                                                                          DRI




                                                                                                                                                                                                             .5
                                                                                                                                                                                                                                                                                                                                                                                                                                     C1            0.0101 Ha




                                                                                                                                                                                                        17
                                                                                                                                                                                                    .0
                                                                                                                                                                                                                                                                                                                                                                                                                                     C2            0.0097 Ha
                                                                                                                                                    WAY




                                                                                                                                                                                                                                                                                        .5
                                                                                                                                                                                                                                                                                      1818.5                                                                                                                                         C3            0.0084 Ha
                                                                                                                                                                                                                                                                                                                                                                                                                                     C4            0.0561 Ha
                                                                                                                                                                                                                                  18.5                                                                              54.
                                                                                                                                                      E




                                                                                                                                                                                                                                                                                                                        9
                                                                                                                                                                                                                                                                                                                                                                                                                                     C5            0.0386 Ha
                                                                                                                                                  GAT




                                                                                                                                                                                                                                                                               C3
                                                                                                                                                                                                                                                         C2
                                                                                                                                                                                                                                  C1                                                                         50
                                                                                                                                                                                                                                                                                                               .0
                                                                                                                                                                      17.0




                                                                                                                                                                                                                                                                                                                      19




                                                                                                                                                                                                                                                                                               45.0
                                                                                                                                                                                                                                                                                                                    .0




                                                                                                                                                                                                                                                                                    40.0
                                                                                                                                                                                                                                                                        35.0
                                                                                                                                                                                   17




                                                                                                                                                                                                                                                         30.0
                                                                                                                                                                                                                                           25.0
                                                                                                                                                                               .5




                                                                                                                                                                                                                                                  19.0
                                                                                                                                                                0.0




                                                                                                                                                                                                                           20.0
                                                                                                                                                                             5.0




                                                                                                                                                                                                         15.0
                                                                                                                                                                                            10.0
                                                                                                                                                                                        18


                                                                                                                                                                                                   18
                                                                                                                                                                                        0  .


                                                                                                                                                                                                   .5




                                                                                                                                                                                                                                                                                                                                        19.5
                                                                                                                                                                                                                                                                                                         C4
                                                                                                                                                                                                                                              C5
                                                                                                                                                                                                                                                                                                             20.0
                                                                                                                                                                                                                                                                                           19.5
W:\205 Mogprop Management\205 002 MCU Gateway Dve Noosaville\Drawings\205-002-WORKING.dwg




                                                                                                                                                                                                                                         20.0
                                                                                                                                                                                                                     19.5




                                                                                                                                                                                                                                               D
                                                                                                                                                                                                                                         SA ROA
                                                                                                                                                                                                        DI NOO
                                                                                                                                                                                                   EUMUN



                                                                                                                                                                                                                              CATCHMENT AREAS
                                                                                                                                                                                                                                     SCALE 1:1000 (A3)                                                                                                                                                                                                                PRELIMINARY ISSUE
                                                                                                                                                          CLIENT                                                                                                                                                                                       APPROVED                          SCALE
                                                                                                                                                                                                                                                                                                                                                                                                                           LOT 102 SP241371 GATEWAY DRIVE, NOOSAVILLE
                                                                                                                                                              MOGPROP                                                                                                                                                                                                                      1:250   0   5   10   15   A1
                                                                                            PROJECT MANAGEMENT - ENGINEERING - PLANNING
                                                                                                                                                          MANAGEMENT PTY LTD                                                                                                                                                                                                               1:500                     A3                    DRAINAGE CATCHMENT PLAN
                                                                                            SUNSHINE COAST      MACKAY           CAIRNS                                                                                                                                                                                                                RPEQ
                                                                                            (07) 5493 3649      (07) 4957 4988   (07) 4041 5118                                                                      1      PRELIMINARY ISSUE                                                     07/08/14           RH      KP       JB        ----                                                                      DRAWING NUMBER                                                  REVISION

                                                                                            projexpartners.com.au                                                                                                    No.                                  Description                                 Date          Drawn   Design   Check     RPEQ                                                                                           205-002-C13.01                                   1
                                                                                                                                                                                                                  THIS DRAWING MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS PREPARED BY PARTIES AGREED TO BY PROJEX PARTNERS & MUST NOT BE USED BY ANYONE ELSE OR FOR ANY OTHER PURPOSE

Page 67

»>

ProjexPartners 4 %

APPENDIX E

PCarain Analysis Results

Page 68

                                                                                                                                                                                                                                                                                                                                                                                            N1
                                                                                                                                                                                 5/1


                                                                                                                                                                                                                        4/1


                                                                                                                                                                                                                                                                  3/1


                                                                                                                                                                                                                                                                                                               2/1


                                                                                                                                                                                                                                                                                                                                                      1/1




                                                                                                                                                                                                                                                                                                                                                                                                                             1/2


                                                                                                                                                                                                                                                                                                                                                                                                                                                                       2/1
                                                                                                                                                  STRUCTURE




                                                                                                                                                                                  Enviropod or approved equivalent



                                                                                                                                                                                                                            Enviropod or approved equivalent



                                                                                                                                                                                                                                                                      Enviropod or approved equivalent



                                                                                                                                                                                                                                                                                                                Enviropod or approved equivalent




                                                                                                                                                                                                                                                                                                                                                                                                                              Enviropod or approved equivalent



                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Enviropod or approved equivalent
                                                                                                                                                  NAME




                                                                                                                                                                                                                                                                                                                                                          New 2440 dia. Stormwater 360
                                                                                                                                                                                  900x600 Field Inlet with



                                                                                                                                                                                                                            900x600 Field Inlet with



                                                                                                                                                                                                                                                                      900x600 Field Inlet with



                                                                                                                                                                                                                                                                                                                900x600 Field Inlet with




                                                                                                                                                                                                                                                                                                                                                                                                                              900x600 Field Inlet with



                                                                                                                                                                                                                                                                                                                                                                                                                                                                        900x600 Field Inlet with
                                                                                                                                                                                                                                                                                                                                                                                                Existing Gully Pit
                                                                                                                                                  STRUCTURE




                                                                                                                                                                                                                                                                                                                                                          Manhole Filter
                                                                                                                                                  DISCRIPTION




                                                                                                                                                  PIPE SIZEmm (Class)                                       225(2)                                   225(2)                                    225(2)                                    225(2)                                 225(2)                                                                 225(2)


                                                                                                                                                  PIPE GRADE %                                                3.10%                                     3.91%                                     1.12%                                     2.00%                                  9.80%                                                                  2.79%
                                                                                                                                                                                                              32.27                                     25.56                                     89.28                                     50.00                                  10.21                                                                  35.82
                                                                                                                                                  PIPE SLOPE 1 in X
                                                                                                                                                  FULL PIPE FLOW VELOCITY (m/s)                                      0.80                                      0.92                                      1.01                                      1.89                                  1.89                                                                    0.80
                                                                                                                                                                                                                     1.89                                      2.14                                                                                                                      3.62
                                                                                                                                                  PART FULL FLOW VELOCITY (m/s)
                                                                                                                                                                                                    DATUM RL 7.0
                                                                                                                                                                                  18.486



                                                                                                                                                                                                                            18.098



                                                                                                                                                                                                                                                                      17.870



                                                                                                                                                                                                                                                                                                                17.746



                                                                                                                                                                                                                                                                                                                                                          16.988



                                                                                                                                                                                                                                                                                                                                                                                                15.850



                                                                                                                                                                                                                                                                                                                                                                                                                              18.004



                                                                                                                                                                                                                                                                                                                                                                                                                                                                        17.746
                                                                                                                                                  WATER LEVEL
                                                                                                                                                  IN STRUCTURE
                                                                                                                                                                                  18.486
                                                                                                                                                                                  18.254


                                                                                                                                                                                                                            18.091
                                                                                                                                                                                                                            18.014


                                                                                                                                                                                                                                                                      17.870
                                                                                                                                                                                                                                                                      17.837


                                                                                                                                                                                                                                                                                                                17.740
                                                                                                                                                                                                                                                                                                                17.409


                                                                                                                                                                                                                                                                                                                                                          16.988
                                                                                                                                                                                                                                                                                                                                                          16.424


                                                                                                                                                                                                                                                                                                                                                                                                15.850



                                                                                                                                                                                                                                                                                                                                                                                                                              18.004
                                                                                                                                                                                                                                                                                                                                                                                                                              17.799


                                                                                                                                                                                                                                                                                                                                                                                                                                                                        17.740
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        17.409
                                                                                                                                                  HYDRAULIC
                                                                                                                                                  GRADE LEVEL
W:\205 Mogprop Management\205 002 MCU Gateway Dve Noosaville\Drawings\205-002-WORKING.dwg




                                                                                                                                                  PIPE FLOW
                                                                                                                                                                                                               0.033                                     0.038                                     0.041                                     0.078                                 0.078                                                                   0.033
                                                                                                                                                  (Cumecs)

                                                                                                                                                  PIPE CAPACITY                                                0.083                                     0.093                                     0.050                                     0.066                                 0.147                                                                   0.079
                                                                                                                                                  AT GRADE (Cumecs)
                                                                                                                                                                                                     1.295


                                                                                                                                                                                                                            1.195
                                                                                                                                                                                                                            1.215


                                                                                                                                                                                                                                                                      1.295
                                                                                                                                                                                                                                                                      1.315


                                                                                                                                                                                                                                                                                                                1.395
                                                                                                                                                                                                                                                                                                                1.495


                                                                                                                                                                                                                                                                                                                                                          1.475
                                                                                                                                                                                                                                                                                                                                                          2.405


                                                                                                                                                                                                                                                                                                                                                                                                1.000




                                                                                                                                                                                                                                                                                                                                                                                                                                                 1.874


                                                                                                                                                                                                                                                                                                                                                                                                                                                                        1.495




                                                                                                                                                  DEPTH TO INVERT
                                                                                                                                                                                                     18.025


                                                                                                                                                                                                                            17.805
                                                                                                                                                                                                                            17.785


                                                                                                                                                                                                                                                                      17.425
                                                                                                                                                                                                                                                                      17.405


                                                                                                                                                                                                                                                                                                                17.265
                                                                                                                                                                                                                                                                                                                17.165


                                                                                                                                                                                                                                                                                                                                                          17.125
                                                                                                                                                                                                                                                                                                                                                          16.195


                                                                                                                                                                                                                                                                                                                                                                                                15.000




                                                                                                                                                                                                                                                                                                                                                                                                                                                 17.500


                                                                                                                                                                                                                                                                                                                                                                                                                                                                        17.165




                                                                                                                                                  INVERT LEVEL
                                                                                                                                                  OF DRAIN
                                                                                                                                                                                  19.320



                                                                                                                                                                                                                            19.000



                                                                                                                                                                                                                                                                      18.720



                                                                                                                                                                                                                                                                                                                18.660



                                                                                                                                                                                                                                                                                                                                                          18.600



                                                                                                                                                                                                                                                                                                                                                                                                16.000



                                                                                                                                                                                                                                                                                                                                                                                                                              19.374



                                                                                                                                                                                                                                                                                                                                                                                                                                                                        18.660




                                                                                                                                                  DESIGN SURFACE
                                                                                                                                                  LEVEL

                                                                                                                                                  REACH LENGTH                                           7.100m                                    9.200m                                12.500m                                       2.000m                              12.200m                                                               12.000m


                                                                                                                                                  LINE                                                                                                                                                     1                                                                                                                                                       2



                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        PRELIMINARY ISSUE
                                                                                                                                                                        CLIENT                                                                                                                                                                                                                                                                                                                                                                         APPROVED   SCALE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  1:1000   0   10   20     30   40     50   60   A1
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       LOT 102 SP241371 GATEWAY DRIVE, NOOSAVILLE
                                                                                                                                                                            MOGPROP                                                                                                                                                                                                                                                                                                                                                                               1:2000
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    HORIZONTAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 A3
                                                                                            PROJECT MANAGEMENT - ENGINEERING - PLANNING
                                                                                                                                                                        MANAGEMENT PTY LTD                                                                                                                                                                                                                                                                                                                                                                         1:100   0   1    2              4        6    A1
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   DRAINAGE LONGITUDINAL SECTION
                                                                                            SUNSHINE COAST      MACKAY           CAIRNS                                                                                                                                                                                                                                                                                                                                                                                                                RPEQ
                                                                                            (07) 5493 3649      (07) 4957 4988   (07) 4041 5118                                                                                                                                                                                                                                                                                                                                                                                                                    1:200                                         A3
                                                                                                                                                                                                                                                                                                            1                   PRELIMINARY ISSUE                                                                                                                                                          07/08/14    RH      KP       JB      ----                                    VERTICAL                      DRAWING NUMBER                                REVISION

                                                                                            projexpartners.com.au                                                                                                                                                                                          No.                                                                                                       Description                                                                            Date      Drawn   Design   Check   RPEQ                                                                                    205-002-C11.01                    1
                                                                                                                                                                                                                                                                                                          THIS DRAWING MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS PREPARED BY PARTIES AGREED TO BY PROJEX PARTNERS & MUST NOT BE USED BY ANYONE ELSE OR FOR ANY OTHER PURPOSE

The text continues on page 69.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.