Skip to the record
Every meeting, every word.

Original source · versioned page text

Appendix I - Stormwater Management Plan

Attached to the e-mail MCU14/0083 Appendices.

of 77

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Components of any
proposes treatment
train or technology

The components of any proposed the treatment train                Maintenance Overview
or technology, including a gully pit basket upstream
of a radial flow cartridge filtration system, must                The primary purpose of the Stormwater Treatment Train is to
be evaluated for a range of pollutants and these                  filter out and prevent pollutants from entering our waterways.
                                                                  Like any effective filtration system, periodically these
performance expectations must comply with current
                                                                  pollutants must be removed to restore the system to its full
best practice guidelines, i.e. Water by Design "MUSIC             efficiency and effectiveness.
Modeling Guidelines version 1.0 2010" for South
East Queensland.
                                                                          aintenance requirements and frequency are
                                                                         M
In short, the performance evaluation of any system                       dependent on the pollutant load characteristics
must show:                                                               of each site. Maintenance must be performed
                                                                         in accordance with the Treatment Trains
 1   Any reduction efficiencies are justified by rigorous
                                                                         Operation and Maintenance Guidelines.
     scientific testing as determined by an independent
     peer reviewer and the results further peer reviewed and
     published in a credible scientific journal. Any potential
     or perceived conflicts of interest should be disclosed
     within the published article.

 2   Published article providing insight into the pollutant
     composition (e.g. soluble vs particulate for nitrogen)
     and the mean concentration of inflow and outflow to
     compare to local and or regional conditions.

 3   Performance evaluation undertaken in dry weather
     conditions or a method to take into account any
     potential leaching of nutrients that may occur in
     the system(s).

 4   Evaluation is conducted using full-scale systems
     with details of treatable flow rates sampled and how
     they correlate to discrete removal efficiencies and
     comparisons to the designed treatable flow rates of
     the device. A comparison should also be made to the
     climatic conditions especially where un-restricted filters
     are used.




                                                                                        Stormwater360 Operations and maintenance   3
Log in to download the original file

Appendix I - Stormwater Management Plan .pdf · 7.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.