Appendix I - Stormwater Management Plan
Attached to the e-mail MCU14/0083 Appendices.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn N1
5/1
4/1
3/1
2/1
1/1
1/2
2/1
STRUCTURE
Enviropod or approved equivalent
Enviropod or approved equivalent
Enviropod or approved equivalent
Enviropod or approved equivalent
Enviropod or approved equivalent
Enviropod or approved equivalent
NAME
New 2440 dia. Stormwater 360
900x600 Field Inlet with
900x600 Field Inlet with
900x600 Field Inlet with
900x600 Field Inlet with
900x600 Field Inlet with
900x600 Field Inlet with
Existing Gully Pit
STRUCTURE
Manhole Filter
DISCRIPTION
PIPE SIZEmm (Class) 225(2) 225(2) 225(2) 225(2) 225(2) 225(2)
PIPE GRADE % 3.10% 3.91% 1.12% 2.00% 9.80% 2.79%
32.27 25.56 89.28 50.00 10.21 35.82
PIPE SLOPE 1 in X
FULL PIPE FLOW VELOCITY (m/s) 0.80 0.92 1.01 1.89 1.89 0.80
1.89 2.14 3.62
PART FULL FLOW VELOCITY (m/s)
DATUM RL 7.0
18.486
18.098
17.870
17.746
16.988
15.850
18.004
17.746
WATER LEVEL
IN STRUCTURE
18.486
18.254
18.091
18.014
17.870
17.837
17.740
17.409
16.988
16.424
15.850
18.004
17.799
17.740
17.409
HYDRAULIC
GRADE LEVEL
W:\205 Mogprop Management\205 002 MCU Gateway Dve Noosaville\Drawings\205-002-WORKING.dwg
PIPE FLOW
0.033 0.038 0.041 0.078 0.078 0.033
(Cumecs)
PIPE CAPACITY 0.083 0.093 0.050 0.066 0.147 0.079
AT GRADE (Cumecs)
1.295
1.195
1.215
1.295
1.315
1.395
1.495
1.475
2.405
1.000
1.874
1.495
DEPTH TO INVERT
18.025
17.805
17.785
17.425
17.405
17.265
17.165
17.125
16.195
15.000
17.500
17.165
INVERT LEVEL
OF DRAIN
19.320
19.000
18.720
18.660
18.600
16.000
19.374
18.660
DESIGN SURFACE
LEVEL
REACH LENGTH 7.100m 9.200m 12.500m 2.000m 12.200m 12.000m
LINE 1 2
PRELIMINARY ISSUE
CLIENT APPROVED SCALE
1:1000 0 10 20 30 40 50 60 A1
LOT 102 SP241371 GATEWAY DRIVE, NOOSAVILLE
MOGPROP 1:2000
HORIZONTAL
A3
PROJECT MANAGEMENT - ENGINEERING - PLANNING
MANAGEMENT PTY LTD 1:100 0 1 2 4 6 A1
DRAINAGE LONGITUDINAL SECTION
SUNSHINE COAST MACKAY CAIRNS RPEQ
(07) 5493 3649 (07) 4957 4988 (07) 4041 5118 1:200 A3
1 PRELIMINARY ISSUE 07/08/14 RH KP JB ---- VERTICAL DRAWING NUMBER REVISION
projexpartners.com.au No. Description Date Drawn Design Check RPEQ 205-002-C11.01 1
THIS DRAWING MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS PREPARED BY PARTIES AGREED TO BY PROJEX PARTNERS & MUST NOT BE USED BY ANYONE ELSE OR FOR ANY OTHER PURPOSE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.