62 Buderim Avenue ALEXANDRA HEADLAND QLD 4572 PROJECT STRATEGY QLD Pty Ltd Phone: (07) 5444 0727 Fax: (07) 5444 0627 Mobile: 0418 989 897 ABN 37719 035 906 Email: [email protected] 30th April 2008 The Chief Executive Officer Sunshine Coast Regional Council PO Box 141 TEWANTIN QLD 4565 Attention: Land Development - Trish Sweeney Dear Trish, RE: DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS = SCAPING AT GATEWAY DRIVE, NOOSAVILLE RECONFIGURATION OF A LOT APPROVAL REFERENCE 2007/1626 Further to our engineer's application for Operational Works - Civil Works, we forward three (3) copies of the Landscape design plans ED 7197 OPW-01 to OPW-04 prepared by Element Design. We also enclose a cheque for $1,625.00 together with IDAS Form 1 Part A and E and the IDAS Assessment Checklist. We trust this information is sufficient for you to satisfactorily process this application. Yours faithfully J Andrew Mufray For PROJECT STRATEGY QLD PTY LTD Encl.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 26 pages
Page 2
Our Ret 6631
The Chief Executive Officer
Noosa Council
PO Box 1414
TEWANTIN QLD 4565
Via: Mail
Dear Sir / Madam
@ RE: LETTER OF CONSENT OF OWNER
FOR APPLICATION FOR A MATERIAL CHANGE OF USE AND RECONFIGURATION OF A LOT
178-182 EUMUNDI NOOSA ROAD, NOOSAVILLE
We, the undersigned, on behalf of Bunnings Properties Pty Ltd (CAN 008 557 622), hereby consent to
the lodgement of the necessary Applications for the establishment of a Bunnings Warehouse and an
{Industrial Subdivision over Lot 1 on RP133192, Lot 21 on RP867627 and Lot 14 on SP170295.
Yours faithfully
Director
Rodney Boys
oUF a 2 Dh
@ we agian ae Dae fd TA 9 eS
Doni Ant sueri Secretary
The ACN must be iInduded and accompanied by -
« the signature of either-
~ Two directors of the company
— Adirector and a company secretary of the company or
~ ifaproprietary company that has a sole director who Is also the sole company secretary, that director
OR
* The company seal (if the company has a common seal) witnessed by-
— Two directors of the company
~ Adirector and a company secretary of the company or
— Fora propriety company that has a sote director who is aise the sole company secretary, that director.
6631 _Iu.consent.ROL_mdm_281106.doc
Page 3
Page | of 1 Andrew Murray From: Andrew O'Neill [[email protected]] Sent: Monday, 13 August 2007 2:01 PM To: Andrew Murray Subject: Authorised signatories Dear Andrew As discussed, | can confirm the foilowing: 1. That the original consent letter provided remains valid for the reconfiguration and Operational Works applications; 2. That the CAN number quoted in our original letter remains the same 3. That the following people remain authorised signatories for Bunnings Properties Pty Ltd: (i) Rodney Boys @ (ii)Dominic Antenucci regards Andrew O'Neill Regional Property Development Manager - Northern NSW & QLD Bunnings Group Limited 141 Shirley Street, Rosehill NSW 2142 Locked Bag 30, Granville NSW 2142 Phone __: (02) 9846-7266 Facsimile : (02) 9846-7530 Mobile =: 0417-873-217 email : [email protected] Website : www.bunnings.com SCOR IOI A AOI ORC AIO IIE OIC RR GIGI I ICICI ROR ICICI eke ak oles aki Bunnings Legal Disclaimer: @ 1) This email is confidential and may contain legally privileged information. [f you are not the intended recipient, you must not disclose or use the information contained in it. If you have received this email in error, please notify us immediately by return email and delete the document. 2) All emails sent to and sent from Bunnings Group Limited. are scanned for content. Any material deemed to contain inappropriate subject matter will be reported to the email administrator of all parties concerned. 2 a eo ee onc ae oe he oe te oe ie oe fe oe a ee oe RR Re he oe oR OR 30/04/2008
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Common details
NOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
Applicant details (The Appicant is the person responsible for making the application and need not be the owner of the land, The Applicant is responsible for ensuring the
information provided on the IDAS Application Form Is correct. This information is refed upon by the Assessment Manager and any referral agencies when assessing and
deciding this application. By lodging this application, the Applicant incurs the obligations and responsibilities prescribed by the IPA. Any development permit or preliminary
approval that may be issued as a consequence of this application will be issued to the Applicant.)
Company or organisation name (if applicable) G ATEw, AY Rise Pry ixo
Individual applicant/Contact person (if there is more than one appicant, provide additional applicant details on an attachment to this form)
Tite] 12. {Firstname | AWO@EW rast | MURRAY
Postaladdress|} 2 BUOE QW AVE. ALEXANIOZA HEAOLANS QLD 4572
Contact telephone number |OW SUG OTZT : Mobile phone number! OLLI QAAQGBQ 7
Facsimile number 1Q7 Sule O62 e-mail address prajectsrategy @ biq pond . ton
Details of the premises (1.0. the Jand on which the development is proposed - refer to the advice at the end of the form)
4. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A if the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
Name of each local government area in which the mobile and temporary ERA is proposed to operate
1.
OR
Table B Street address for the premises ( ~ applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
(i) Street address / lot on plan for the premises (Appropriate for most applications including buiking applications); OF
(i) [0 Street address /lt on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty, pontoon
etc) (Note: Lot on plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government.)
Street address Lot on plan description Local government area (0.9
Unit | Stoet Street Name and official suburbfocalty name Gost | totno.| Ban ye and Logan, Cams)
1. Gareway Dawe neue, 18\ [SP2\ (G87 | NCosA
NOOSAALLE .
AND/OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remnote areas, over part of a Jot, in water (e.g. channel dredging in Moreton Bay) efc.)
Coordinates
(Note: place each set of coordinates in a seperate row) Rea ce Datum Local arora) area
Easting Northing Latitude Longitude
1. C0 coaos (] wese4
1 Other
Page 1 \
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: ‘n mast instances, the premises will not involve any of the folowing characteristics, however some applications may involve one or more of these characteristics — complete only if appitcable) Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, fake, canal) Name of water body, watercourse or aquifer (If known) Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994 Lot on pian description for strategic port tand Port authority for the fot Table F Complete if the premises are in tidal water Name of local government for the tidal area (if appficable) Name of port authority for the tidal area (/f appfcable) 1. 3. Indicate the total area of the premises on which the development is proposed: (Note: The fofal area may include land both above and betow water) Total area of premises (land on which the development is proposed) - Q1S |G \Cm Ufectares ( apptcabie uni Existing use of the premises 4. Current use/s of the premises: (e.g. vacant and, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.) NACANT LAND 5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.) No o Yes ~ Ensure the type, location and dimensions of each easement are included in plans, submitted with the application Proposal details 6. Brief description of the proposal: (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture etc.) 1 Lot SuB0wision ~ INQUSTZIAL 7. Does the proposal include new building work or operational work (including any services) on the premises? oO No &m Yes - Ensure the nature, location and dimensions of the proposed works ara included in plans, submitted with the application Resource entitlement (if appticable) — further information is provided in the advice section at the end of the form 8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (o.g. the application involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.) §0 No - Goto.a9 (J Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource allocation ar entitlement must be submitted with the application. You do not need to answer Q9 — go to the next section. Nature of State-owned resource TableG Nature of evidence required Allocation/entitlement ss “a wa State Government Date of | Date of reference number Name of authorising officer Position of authorising officer Department issue _| expiry Owner's consent (if applicable) — further information is provided in the advice section at the end of the form 9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable. Table H Premises Owner's name/s Details of the premises owned ; * Date consent Owner's signature’ and postal address (street address or lot on plan description) was obtained 1. Buanvags & Pro perben Qf] Lor B\ se ZN 687 Lele attacdiment \a|l2|ob Come i ‘iow 2\G2 * Owners signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager an an attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a company may sign as owner. Templates for the provision of awner’s consent are available on the IPA website . Page 2
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Attachments and supporting information (Complete Table !~ Use 2 separate row for each type of attachment or information, inckxding information required under this Parl) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form. Description of attachment or information ; Table | . Title (if appicable) Method of delivery to (29 Pat CalFanm t owners coset eee frau? | fag Gon Auten, Lanes Stoet Tra Repat) | __ Ot assessment manager 1. Ounes Coreers 13-1296 | aMaded Londecape. Araurngs (Seeks) eona7 aPW-01 to | t0- & -ab} athadwol EOTKAT OMI -0 Portable Long Service Leave (PLSL) levy (Applicable for certain building and construction work valued over $80,000 only) 10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (“box if applicable) CD the application seeks a preliminary approval only; D the application is not for building and construction work under the Building and Construction industry (Portable Long Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or (0 the work is being carried out under an owner-builder permit issued under the Queensiand Building Services Authority Act 1991 - Complete and submit a QLeave Notification and Payment Form (ne payment required if owner-buikder permit number stated). The receipted form must be sighted by the assessment manager before @ development perrrit can be given. 41. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information) DANO tnsotrana (Yes - Answer Q12 below 12. Has the PLSL levy been paid? Oo No ~ (NOTE: An application can be jodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit a Notification and Payment Form to QLeave.) oO Yes - Complete Table L and submit, with the appication, the “yellow” (Local Govemment's (Council) / Private Certifier's) copy of the receipted QLeave Form. . . QLeave Project Number Table L Amount paid Date paid (6 digits, starting with A, B, E, L or P) OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier} (Optional) Fee (8) Date received oh Refefence NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER To: Council. | have been engaged as the private certifier for the building work referred to in this application. Date of engagement Name BSA Certification license number Building classification/s QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) A paid Date receipted form Description of the work QLeave Project Number 6) Date paid sighted by Name of officer who sighted the form assessment manager Privacy Statement The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legistation (including the Freedom of Information Act 1992) or as required by Parfiament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002. Page 3
Page 7
Part E, Version 3.1, 3 March 2008
Ar ee
Building &/or operational works assessable
against a planning scheme
Nature of the works
1. Nature of work that requires assessment against a planning scheme:
{7 Building work - Complete Table A {X] Operational work - Complete Table B
2. What is the dollar value of this operational work? (ie. the total value including GST, materials and tabour) 1$ 50,000
@ Mandatory Information
3. Confirm that the following mandatory information accompanies this application
Confirmation of
lodgement Method of lodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
lextent of any cut and fil) [AL Confirmed
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
Generat advice
¢ Part A must also be completed for all IDAS development applications.
* The applicant is responsible for answering ail questions fully and correctly, uniess following a response there is a statement to go directly to another question.
Q1 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
Page 8
INTEGRATED PLANNING ACT 1997 Part E, Version 3.0, 3 September 2007
Table B
(i) What is the nature of the operational work?
[1 Roadworks Ls Stormwater (1 Water infrastructure (1 Sewerage infrastructure
M1 Landscaping (1 Clearing vegetation under the planning scheme Earthworks
1 Orainage works ([) Signage (11 Other - Specify befow
]
(ii) 1s the application for operational work involving the creation of new lots?
1 No
[BH Yes - Specify number below
(7 plus deletion akin
(iii) What type of approval is being sought?
Development Permit (0 Preliminary Approval
(iv) Is there a current Preliminary Approval for this operational work on the premises?
No
[1 Yes - Complete Table B(a)
Table B(a)
List of approval references Date approved | Date approval lapses
{ 1.
{v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
M ves - Complete Table B(b)
Table B(b)
List of approval references Date approved | Date approval lapses
Lt. [ReconRiqualnon 2607 [1626 13Dec OF | i2De Zeal
a. Cole Cathwats ZOOT iets ZT 07 260en. 2011
| GENERATE ANOTHER TABLE B
Mandatory information
3. Confirm the following mandatory information accompanies this application
Confirmation of Method of lodgement
lodgement
Plans, and specifications if applicable, showing the nature and location of the proposed works
{including the extent of any out end i) B Confirmed
OFFICE USE ONLY
[Date received | | [Reference numbers
Advice for completing Part E
General advice
« — Part A must also be completed for all IDAS development applications.
« All questions must be answered unless, following a response, there is a statement to go directly to a particular question.
Q18&2 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.
-2-
Page 9
IDAS Assessment Checklist, Version 21.2, 31 March 2008 pra Assessment Checklist DAS Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act 1997 IPA). Form 1 is made up of various Parts. Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on the nature of the application. Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral requirements, and the Parts of Form 1 relevant to the application. Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be completed for all development applications except those proposed on land in an urban development area, or for building work requiring assessment against the Building Act 1975 only. For more information about development applications on tand in an urban development area, refer to www.vida.qid.aov.au. For more advice about building applications refer to Part B of the IDAS Application Form. Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this checklist Does the application seek approval to materially change use of the premises? Ces |pQNo If yes - complete Section 2 of this checklist SS Does the application seek approval to reconfigure a lot? Ces |BgNo if yas - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment Is by the local government. Does the application seek approval to carry out operational work? pp pp ry pe De Yes |LINo !f yas - complete Section 4 of this checklist Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Yes No if yes'- complete Section 5 of this checklist O rt Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application? if yes - complete Section 6 of this checklist. C1Yes |BdNo Does the application seek approval to carry out building work requiring assessment against a local government planning scheme? (Yes |SxJNo if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government. Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of DAS Application Form 1. OYes [XINo [Assessment is by a building certifier ECTS. : i Section t must be completed for al! applications that require completion of the IDAS Assessment Checklist. HERITAGE sears eee . , ee eee - Ww Answer both A and B below. A Is any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensiand Heritage Act 1992? [DX No-Gotos (Yes
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
B Does the proposal involve development, other than development mentioned in the Integrafed Planning Act 1997 Schedule 9
{development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered
in a Local Heritage Register under Part 7B of the Queensiand Hentage Act 1992?
[4 No-Goto.01.2 [1 Yes - (Complete Form 1, Part C,) This appication requires assessment by the relevent local goverment against the IDAS
Code in the Queensiand Heritage Regulation 2003. if the development involves building work and the local
goverment is not the Assessment Manager for the application, the local goverment has jurisdiction as Concurrence
Pho or geet
CBE pe ore
weg eto ote Dt 6 8 IA OA sector EE Date ngrs term ee nee
REMOVING QUARRY MATERIAL; WILD RIVER AREA
4.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
EK) No-Gotoar3 (_} Yes
IPA, schedtce 8, part 1. table 5. tem 1, IP Reguiaton schedu'e 2 table 2. tem 11, P Reguiztion schedure 1. table 5. item 2 (wid river areal, Water Act 2000,
section 966C: Wid Rivers Act 2005 section 43A
ENVIRONMENTALLY RELEVANT ACTIVITY; “WILD RIVER AREA |
13 Does the proposal! involve an environmentally relevant activity (ERA), other than a mining 19 activity or a petroleum activity?
[XK] No-Gotoa14 ([_] Yes
IPA not
730A '
& pant! mble 2 ter) IPA schedie 5 pat 1, table
area; Wrd Rivers Act 2005, sectior 438 relevant wi
is 2and 4 1P Regnishon, senediite 2 table 2 meme 1 and 22 Emyronmental Protection Act 1934 sector
declaration Wid Rivers Code
‘WITHIN THE LIMITS OF A PORT
14 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
IX] No - Goto.01.5
(Yes
IP Regit3top schedule 2 table 2, tems 15 and 16
DECLAREDFISHHABITAT AREA
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[No - Go to. 01.6
‘oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedute 2. table 2. item 26
COMMUNITY INFRASTRUCTURE
1.6 Is any part of the premises designated for community infrastructure?
4 No - Gotoat.7
(7 Yes
IP Regulation schediuse 2 fabie 2 dem 7
WASTE WATER MANAGEMENT = Oe , cs
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
DK] No - End of Sections [_] Yes
IP Regulation, schedule 2. lable 3 tem 5
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legistation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
SECTION 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME
41 is any of the proposed operational work assessable under a planning scheme?
(No - Goto 04.2 [Xd Yes - (Comptete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.
STATE-CONTROLLED ROAD
4.1.1. | Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
fNo
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?
BRINo (7 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(1 Yes
If yes, is all of the proposed operational work associated with the following?
(i) A material change of use that is assessable under the planning scheme (No (Yes
(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number oftots [[}No [1] Yes
abutting the State-contolled road
If no to elther or both (i) or (ji) above - Answer (a) - (c) below
(a) Is any of the proposed operational work associated with access to a State-controlled road?
(No C1 Yes - this appication must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
{b) 1s any of the proposed operational work for filling or excavation?
[DINo (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This epplication must be referred fo the Department of Main Roads (OMR) as Concurrence Agency
[1 Yes - This apptication must be referred to DMR as Advice Agency.
(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
(No (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This eppfication must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(1 Yes - mis apptication must be referred to DMR as Advice Agency.
IP Regu'stion. schedule 2 tabe 3, tam 3 IP Reguishon, scheduie 2, talve 3 vem 115).
ACID SULFATE SOILS
4.1.2 | \s any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils?
CINo-Gowasss Ba Yes
if yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
CINo Yes
\f yes, does the proposed operational work involve the following?
{i) Excavating more than 1,000m* of soil or sediment at or below 5m AHD KKINo (1 Yes
(ii) Filling the premises with 1,000m? or more of material with an average depth of 0.5m on vy No (1 Yes
land, soit or sediment at or below 5m AHD
If yes to either or both (i) or (ji) above - This appication must to be referred fo the Department of Natural Resources and Water (NRW) as
Advice Agency
IP Regulation. schedule 2 table 3 tem 4 State Planning Policy 2/02' Planning and Managing Deve‘opment mvolving Acid Suttate Sons section 36
4. Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Dougias,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, !sis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Mornington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
Page 21
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
EASEMENTS AND SUBSTATIONS
413
Is any of the proposed operational work for filling or excavation?
BANo -Gotoass4 ([lYes
If yes, is the filling or excavation associated with reconfiguring a tot?
Yes No ~ Answer both (a} and (b} befow
(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994?
(No 0 Yes
if yes, is any of the operational work proposed to be located in any part of the easement?
CINo [1] Yes - This application must be referred to the entity as Advice Agency.
(b) {s any of the operational work proposed to be located within 10m of a substation site under the Electricity Act 1994?
(I No (71 Yes - This appiication must be referred to the entity responsible for the substation as Advice Agency.
JP Regu:zoon, schedule 2. table 3 tem 10(ai: IP Reguiaton. scheduis 2, tatve 3. tem 10{b).
4.1.4
Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
BENo-Gotoast1s (1) Yes
If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated with
teconfiguring a lot?
ONo O Yes
{if yes, is any of the operational work proposed to be located in any part of the easement?
No (71 Yes - mis application must be referred to the cence hokier as Advice Agency.
IP Reyuiaton schedule 2 rable 3 tm 17.
PUBLIC PASSENGER TRANSPORT
4.1.5 | Is any of the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the
ecified threshold?
No-Gotoa4.1.6 [_] Yes - This application must be referred fo Queensland Transport (QT) as Concurrence Agency.
JP Reguiaton schedule 2 lable 3 tem 14
RAILWAY SAFETY AND EFFICIENCY
416 {Is any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
i h
Ne owen oO Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
JP Regui3hon, schedule 2. tive 3. cem 15.
KOALA CONSERVATION
4.1.7 |\s any part of the premises in a koala conservation area or koala sustainability area?
BJ No - Go to. 04.2 0 Yes
If yes, is all of the proposed operational work associated with a material change of use or reconfiguring a tot for which referral
is required in relation to koala conservation (i.e. did you answer ‘yes’ to all questions in either Q2.1.8 or Q 3,12)?
(CD Yes-Gotoas2 []No
If no, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 19947
[1 Yes-cotoas2 [No
If no, will the activity resutt in the following?
(i) Clearing of native vegetation over an area greater than 2,500m? LJNo (Yes
(ii) Extracting gravel, rock or sand from an area greater than 5,000m? [LJNo (1 Yes
(iii) Excavating or filling an area greater than 5,000m2 CINo [Yes
If yes to one or more of (i) ~ (ii) above - This appication must be referred to the Environmental Protection Agency (EPA) as
Concurrence Agency.
IP Reguiatye sonedule 2 table 3. tem 18.
WILD RIVER AREA ~ Although legislation provides for assessment of operational works for residential, commercial and industrial development for the purposes of the
Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers code to that type of development.
Page 22
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008 AREA ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER 42 ls any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable? KINo-Gotoass [] Yes if yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005? [I No - (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local government. (Yes If yes, is the proposed operational work for residential, commercial or industrial purposes outside a designated urban area, as defined by the Wild Rivers Act 20057 o No - (Compete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local government. oO Yes (Comptete,Form 1, Part E) The operational work associated with reconfiguring is assessed by the focal government, and subject to the declaration for the relevant wild river area, assessment by the local government is required for the purposes of the Wikd Rivers Act 2005. IPA schedule 8 part i ‘atte 4 stom 2: P Regucshon, schedule 1 part 2, table 5, tem tor Wid Riers code (Note: the cade does not currently contain appicable provisons for resaten’ at tadustal or Commercial developmant inside a designated urhan areal. . VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA 43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999 applies? BKLNo - Goto o44 Yes If yes, is the proposed clearing assessable (i.e. not an exception) under schedule 8, part 1, table 4 of the IPA? No-Gotoass (Yes If yes, is the proposed vegetation clearing a relevant purpose under the Vegetation Management Act 1999, section 22A for one or more of the following? — , , (i) A project declared to be a significant project under the State Development and Public Works [No (Yes Onganisation Act 1971, section 26 (i) Necessary to control non-native plants or declared pest : CINo (Yes (ii) To ensure public safety [No [Yes (iv) For establishing a necessary fence, firebreak, road or vehicle track, or for constructing [No (L1Yes Necessary built infrastructure, if there is no suitable altemative site for the fence, firebreak, road, track or infrastructure (v) Anatural and ordinary consequence of other assessable development for which a One (Yes development approval as defined under the Planning Act was given, or a development application as defined under the Planning Act was made, before 16 May 2003 (vi) For fodder harvesting ee, “oO No ‘CO Yes (vii) For thinning CINo [1] Yes (viii) For clearing of encroachment No [Yes (ix) Foran extractive industry OINo “Des (x) For clearing regrowth on leases issued under the Land Act 1994 for agriculture or grazing : o No [J Yes purposes . (xi) For clearing regrowth on freehold land, or indigenous land, in a wild river high preservation ([]No [] Yes area, Hfno to all (i) — (xi) above - The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application. If yes to any one of (i) - (xi) above, is the proposed clearing associated with a material change of use or reconfiguring a fot for which referral is required in relation to clearing vegetation (2. did you answer ‘yes’ to all questions in either 02.1.4 or Q 3.3)? (1 Yes ~ Goto.04.4 [2] No - Answer (a) (b) and (c) on the next page of this Checkfst. Page 23
Page 14
INTEGRATED PLANNING ACT 1897 IDAS Assessment Checkfist, Version 21.2, 31 March 2008
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA (con)
(a) _ Is any of the proposed cleaving in an area declared as an area of high nature conservation value (other than a
wild river high preservation area) or an area vulnerable to land degradation under the Vegetation Management
Act 1999?
(ZI No - Compete Form 1, Part J. This appfication requires assessment by the Department of Natural Resources and Water (NRW). If
O NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
Yes
If yes, is any of the proposed clearing for (v), (vi), (ix) or (x) above?
qj No — Complete Form 1, Part J. This appiication requires assessment by the Department of Natural Resources and Water
{NRW). If NRWis not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
oO Yes - The clearing is not a relevant purpose and the Assessment Manager must refuse fo receive the application
(b) ts any of the proposed clearing in the high preservation area of a declared wild river area?
(CINo - Complete Form 1, Part J. This appication requires assessment by the Department of Natural Resources and Water (NRW). If
NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
(Yes
If Yes, is any of the proposed clearing for the following purposes? coo
(i) For (i), (vi), {vii) or (ix) above Ono [Yes
(ii) For (x) or (xi) above and in a high preservation area outside of a [no (Yes
registered area of agriculture as defined under the Vegetation
Management Act 1999
[f no to either or both (i) or (ii) above — Subject to the dectaration for the relavant wild river area, the application
requires assessment for the purposes of the Wild Rivers Act 2005 - Complete Form 1, Part J. This application
requires assessment by the Department of Natural Resources and Water (NRW). if NRWis not the Assessment
Manager, the agency has jurisdiction as Concurrence Agency.
If yes to either or both (i} or (ii) above, is there a property development plan approved under the Wild
Rivers Act 2005 applying to the land?
oO No - The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application.
O Yes - Uniess the application is consistent with any approved property development plan applying to the land, the
Assessment Manager must refuse to receive it. Subject to the declaration for the relevant wild river area, the
application requires assessment for the purposes of the Wild Rivers Act 2005 ~ if an application is made
complete Form 1, Part J, This appkcation requires assessment by the Department of Natural Resources and
Water (NRW). if NRWis not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
(c)_ Is any of the proposed clearing in a koala conservation area or koala sustainability area?
(CINo - Goto a4 0 Yes
Ifyes, is any of the proposed clearing associated with reconfiguring a lot for which referral is required in
relation to proposed clearing in a koala conservation area or koala sustainability area {i.¢. did you answer
‘yes' fo all questions in Q3, 12}?
(1 Yes-Gotoas4 [No
If no, is any of the proposed clearing over an area greater than 2,500m?2?
[No -Gotoass
CJ Yes - This application must be referred to the Environmental Protection Agency (EPA} as Concurrence
Agency.
(PA. scheduie 4 part (abe 4 mers 1A >. kaguiator schedule 2 tebe 2 tar 5 veyeranon deanny, 1P Reguehon schedule ¢ *30e 2. ten) 34083 corservation! 4° Reguiaton scheduie * pent
2 ladle ¢ fern wegetston deanng/wid river aay Vege! son Management Act 1994 sector 2¢A | vegetaton cleunnynid aver area, Wil Rivurs 4c! 2005 sections J1F and 434 Wid Riven, Code
Page 24
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfist, Version 21.2, 31 March 2008
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44
s any of the proposed operational work for any thing constructed or installed that allows, under the Wafer Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under the Water
Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
BQ.No-Gotoass 1] Yes - Answer (a) and (b) below
(a) Are the operations mentioned as self-assessable development in the following?
(i) A water resource plan under the Water Act 2000 OONo (Yes
(i) A wild river declaration under the Wild Rivers Act 2005 [No (Yes
(iii) A regulation under the IPA or the Water Act 2000 (no [Yes
If no to all of (i) to (iii) above - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to (b}
(b) ts any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 2005?
O Yes
If yes, is the work for the following?
(i) Awater pump CNo = (7) Yes (Complete Form 1, Part Ka)
(ii) Water storage CINo — (7) Yes (Complete For 1, Part Ks)
(ii) Gravity diversion from a watercourse CNo — 1 Yes (Complete Form 1, Part Ki)
(iv) Watercourse diversion CINo — 1 Yes (Compete Form 4, Part Ks)
(v) Other work for taking or interfering with water (INo 7) Yes (Complete Form 1, Part Ks)
Hf yes to any one of (i) to (v) above ~ if any part of the proposal relates to operational work that interferes with water in a high preservation
area, or in a nominated waterway (other than for a. dam or weir), the application will be taken to be not properly made and the Assessment
Manager must refuse to receive it, Al other proposals are subject fo the declaration for the relevant wild river area, and assessment may
be required for the purposes of the Wild Rivers Act 2005. The application will require assessment by the Department of Natural Resources
and Water (NRW). If NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(Complete the relevant Form 1, Part K as indfcated in the table above if an application is made.)
CONo
If no, is the work for the following?
(i) Awater pump [CONo = (1) Yes (Complete Form 1, Part Ka)
(ii) Water storage LINo — 1 Yes (Complete Form 1, Part Ky)
(ii) Gravity diversion from a watercourse LNo = (1 Yes (Comptete Form 1, Pat Ky)
(v) Watercourse diversion (CONo — (71 Yes (Compiete Form 1, Part Ka)
(v) Other work for taking or interfering with water CINo = [7] Yes (Comptete Form 1, Part Ko)
If yes to any one of (i) to (v) above ~ The appication will requre assessment by the Department of Natural Resources and Water (NRW). If NRW
* is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(Complete the relevant Form 1, Part K as indicated in the table above.)
IPA svhedule & part! table 4 terns hay (P F2gu'shon schedule 2 table 2 tem 8 IP Regitation, schedu'2 1 part 3 table 4 items 3 and 34 Water Act 2000, section S66A (wid river
ares Wild Rver: Act 2005. section 434 relevant wid aver decisretion Wend Rivers Code
45
{s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
BSI No-Gotoas6s — [_] Yes - (Complete Form 1, Part Ki) This application requires assessment by the Department of Natural Resources and Water (NRW).
NRWiIs not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA stnedu') part tube di bP Pagustot scmedule 2 fable 2 tem & ' Heguasan sob due f part Trade 4 ene] re 'ovest wid mer declaration, Wid Rivers Cage {Nutt
ine code dans vat Cureriby Goris 1 appicane prow ons for talung or mitarfeeng with artesian, water)
Page 25
Page 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008 TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued) 46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking overtand flow water (other than using a water truck to pump water)? PRLNo-Gotoas7 — ) Yes - Answer (a) and (b) betow (a) Are the operations mentioned as assessable development in the following? (i) A water resource plan under the Water Act 2000 LINo (1 Yes (i) A regulation under the IPA or the Water Act 2000 (No (Yes If yes to either or both of (i) or (ji) above - (Complete Form 1, Part Ks). This application requires assessment by the Department of Naturat Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. (b) Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild tiver area declared under the Wild Rivers Act 2005? (No C1 Yes - itany part of the proposal retates fo operational work in @ high preservation area other than works stated in a wild river declaration for the area to be assessable development for which a development application may be made, the application wil be taken to be not properly made and the Assessment Manager must refuse fo receive it. All other proposals are subject to the dectaration for the relevant wild river area, and assessment may be required for the purposes of the Wild Rivers Act 2005. (Complete Form 1, Part Ksif an application is made.) OPA schedule 4 part bop 4 ti Sy. Regeiahow senenuie ¢ table 2 iter 8 0P Regu! ston sched te 7 part a labie 4 tem 3 Wate: Act 2000, secticn 566A (wind ave" eieel WF Foose. Art 2180 carton 444 relevant wid nuee daciacatin ed River Cour 47 \s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or interfering with subartesian water (other than using a water truck fo purnp water)? BNo-Gotoas [1 Yes If yes, are the operations mentioned as assessable development in the following? (i) A water resource plan under the Water Act 2000 (INo [Yes (ii) A regulation under the IPA or the Water Act 2000 CNo §=[ Yes If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Ki) This eppication requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assassment Manager for the appiication, the agency has jurisdiction as Concurrence Agency. conan. wb carte a sor ku aquamon scheaue 2, tebe 2 fen So Reartu oonedus. T part 1 tate 4 ser 5 Water Act 2oCC Sectan O04 rio per ares Noe nC curent wit YAR ORC UR hON eniM Es taking or iTierfenng Winn subertes an wabir aS assesvanie, Wid ver code Nols the code does Por CUMeAny Contain appACADIE Pius sOK-: "UF SubUNP Ds: ati Wem) 48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump water)? BEINo-Gotoas9 7) Yes - Answer both (a) and (0) bolow (a) Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared under the Wild Rivers Act 2005? (Yes If yes, indicate what the proposed operational work relates to (i) Specified works for the area (No C1 Yes (ii) Work state in the relevant wild river declaration to be LINo C1 Yes assessable development for which an application may be lodged If yes to elther or both of (i) or (ii) above - (Complete Form 1, Part Ko. Subject fo the declaration for the relevant wild river area, assessment may be required for the purposes of the Wild Rivers Act 2005) If no to both (i) and (ji) above - the application wil! be taken to be not property made and the Asséssment Manager must refisse to receive it. OONo If no, are the operations mentioned as assessable development in the following? (iii) A water resource plan under the Water Act 2000 (No OO Yes (iv) A regulation under the IPA or the Water Act 2000 LINo LJ Yes If yes to either or both of (i) of (ii) above - (Complete Form 1, Part Kio) This appiication requires assessment by the Department of Neturat Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. (b) ts the interfering with overtand flow water proposed in an area declared under the Wafer Act 2000 to be a drainage and embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act? CINo (1 Yes - (Comptete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources and Water (NRW). I NRWis not the Assessment Manager for the anpfication, the agency has jurisdiction as Concurrence Agency. “ah sored 8% vat ube toms oo ° amg Lav -P Regu ten schegae 2 fap 2 er 9 JP Reet, tet edule t part S table 4 tem (6 Water Act 2000 secnon B68E ted aver area, ean wal ver decoction Wd Raen Code Page 26
Page 17
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)
4.9 | Is the proposed operational work for the following?
() For the construction of a referable dam as defined under the Water Act 2000 foNo (Yes
(ii) To increase the storage capacity of a referable dam by more than 10% Sano (1) Yes
Hf yes to either or both of (i) or (if) above - (Complete Farm 1, Part Ks) This appicafon requires assessment by the Department of Natural Resources and
Water (NRW). if NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
TA comp boat tte dot dP Hey ge sohedee 2 fabled ret
TIDAL WORK; WILD RIVER AREA
4.10 | Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
[xl No-Gotoast: [[) Yes — Answer (a) and (b) below
(a) _ Is any of the proposed tidal work prescribed tidal work? _
O Yes
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
[No
H no, is the work proposed in a canal?
(No
(f no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - (Complete Form 7, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The appication also requires assessment by Queensland
Transport (Maritime Safety Qid) as Concurrence Agency.
(71 Yes - (Complete Form 1, Part P). ifthe Environmental Protection Agency (EPA) is nol the Assessment Manager for the
appfication, the agency has jurisdiction as Concurrence Agency. The appication also requires assessment by Queenstand
Transport (Maritime Safety Qld) as Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.
(Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
No - (Complete Form 1, Part P). This appication must be referred to Queensland Transport (Maritime Safety Qh) as
Concurrence Agency.
oO Yes - (Comptete Form 1, Part P}. This application must be referred to Queenstand Transport (Maritime Safety Qk) as
Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.
(Yes
If yes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?
No - An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
(Yes
If yes, is the work proposed in a canal?
No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - Unless the application is consistent with any property development plan applying fo the land, the Assessment
Manager must refuse to receive it. (Complete Farm 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensiand Transport (Maritime Safety Qid) as Concurrence Agency
and assessment for the purposes of the Wild Rivers Act 2005.
Oo Yes - Uniess the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Comptete Form 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency. Subject to the dectaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.
(Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
Oo No - Unless the application is consistent with any property development plan applying to the and, the Assassment
Manager must refuse to receive it. (Complete Form 1, Part P} This application must be referred to Queensland *
Transport (Maritime Safety Qk) as Concurrence Agency. Subject to the dectaration for the relevant wild river
area, the application also requires assessment for the purposes of the Wild Rivers Act 2005,
| Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse fo receive it, {Complete Form 1, Part P) This appiication must be referred to Queensland
Transport (Maritime Safety Qid) as Concurrence Agency and Old Fire and Rescue Service as Advice Agency.
The application also requires assessment for the purposes of the Wild Rivers Act 2005.
(No - Goto the frst question on the next page of this Checkist
Page 27
Page 18
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008 TIDAL WORK; WILD RIVER AREA (continec) If no, is any of the proposed Sdal work to be carried out in a wild river area declared under the Wild Rivers Act 2005? O Yes If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005? No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it. (Yes If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths? No -- Unless the appiication is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it. (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment Manager for the appication, the agency has jurisdiction as Concurrence Agency. The application also requires assassment by Queenstand Transport (Maritime Safety Qid) as Concurrence Agency and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. oO Yes - Untess the application is consistent with any property development plan applying fo the land, the Assessment Manager must refuse to receive it, (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agancy (EPA). H EPA is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The appiication also requires assessment by Queensiand Transport (Maritime Safety Qid) as Concurrence Agency and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild fiver area, the appiication also requires assessment for the purposes of the Wild Rivers Act 2005. (No if no, is any of the proposed tidal work for a marina with more than 6 vessel berths? oO No - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA Js not the Assessment Manager for the appiication, the agency has jurisdiction as Concurrence Agency. The appfication also requires assessment by Queensiand Transport (Maritime Safety Qid) as Concurrence Agency. oO Yes - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment Manager for the appiication, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland Transport (Maritime Safety Qk) as Concurrence Agency) and Qld Fire and Rescue Service as Advice Agency. (b) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas? (i) One only local government tidal area [LNo [Yes (ii) Starting in one local government tidal area and extending into another local govemment tidal []No (] Yes : area (but in no strategic port tidal area) (iii) In two or more local government tidal areas but not starting in either local govemment tidal area OONo [Yes (iv) One only strategic port tidal area” ONo (C1Yes (v) A tidal area that is not a strategic port tidal area or a local govemment tidal area DONo ()Yes Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application. IPA, schedule 8. part 1 table 4 tem 5 'P Ragu'aton schedule 2 table 2 "rs 12 14 and 17 /P Reguiéton scheduie J, part 3. table 4, tems 44 and 5: Coustel Protection and Management Act 1995 sechon 104A (wikt iver area,. Page 28
Page 19
INTEGRATED PLANNING ACT 1997 ‘DAS Assessment Checklist, Version 21.2, 31 March 2008
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
411
Is any of the operational work proposed to be carried out within a coastal management district?
SENo-cotoass2 [Yes
If yes, is the proposed operational work for the following?
()__ Interfering with quarry material on State coastal land above high-water mark (No [Yes
(i) Disposing of dredge spoil or other solid waste material in tidal watera [CINo [}Yes
(ii) Draining or allowing drainage or flow water or other matter across State costal land above high-water LINo ()Yes
mark
(iv) Constructing or installing works in a watercourse where the works are not assessable under IPA, CINo [Yes
schedule 8, part 1, table 4, items 3 or 4
(¥) Reclaiming land under tidal watera [No [Yes
(vi) Constructing an artificial waterway, other than a canal, associated with reconfiguring a lot LCINo ‘ Yes
(vii) Constructing an artificial waterway that is a canal, associated with reconfiguringalots = = [J No Oo Yes
(viii) Constructing an artificial waterway not associated with reconfiguring a lot on land, other than State CINo "C1 Yes
coastal land, above high-water if the maximum surface area of water on the waterway is at least 5,000m?
(x) Constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal fand, CINo (Yes
above high-water mark
(x) Removing or interfering with coastal dunes on land, other than State coastal fand, that isin an erosion [[}No [1 Yes
prone area and above high-water mark
If yes to one or more of (i) - (x) above, is any ofthe proposed work to be carted outin nawid fiver area under the Wild Rivers Act
2005?
(C1 No - (Complete Form 1, Part M) This appfcation requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. if yes, above, (0 any shown bold and marked with the symbol a,
Oo the application also requires assessment by Queensland Transport (Marine Safety Qa) as Concurrence Agency.
Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
Yes - Unless the application is consistent with any property development plan applying fo the land, the Assessment Manager must refuse to receive it
(Complete Form 1, Part M) This appitcation requires assessment by the Environmental Protection Agency (EPA). If EPA is not the Assessment
Manager for the application, the agency has jurisdiction as concurrence Agency. it yes, above, to any shown bold and marked with the symbol, the
application also requires assessment by Queensland Transport (Marine Safety Qi) as Concurrence Agency. Subject to the dectaration for the refevant
wild river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
o No - An application for the operational work will be taken fo be not properly made and the Assessment Manager must refuse to receive it,
IPA schedule 8, part 1, table 4, item 5 IP Regutation, schedule 2. table 2. items 12 and 14. IP Regulation schedule 1, part J, table 4, items 4A and 5, Coastal Protection and Management
Act 1995 Act 1995, section 1044 (witd aver area)’ Wild Rivers Act 2005, secton 430.
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12
Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
BXNo-Gotoas13 (1 Yes
If Ss is any of the proposed operational work to be carried out in 2 wild river area declared under the Wild Rivers Act 2005?
No
ff no, is all of the operational work for constructing or raising waterway barrier works - fick applicable boxes and answer (a) and/or (b) below
(i) temporary CONo OyYes
(ii) minor CNo OYes
(iii) rebuilt on a regular basis (No Yes
(a) If yes to one or more of (i) ~ {ifi) above, does all the proposed operational work comply with any applicable Department
of Primary Industries and Fisheries (DPI&F) self-assessable code?
C1 Yes - A permit for that aspect of the operational work is not required. Go to 04.13 CI No-Goto(y)
(b) {fo to all of (i) — (iii) or no to (a) above - (Complete Form 1, Part Os) This application requires assessment by the Department of Primary
industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
CJ Yes
If yes, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part Q3) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). and,
Subject fo the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if DPISF is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - An application for the operational work will be taken fo be not property made and the Assessment Manager must refuse fo receive it.
IPQ schouuie 8 part? fedle 4 #em 6 IPA schedule 8 part 2. fable 4. tem 2 Fisnenes Regutation 1995 31134 (sel-assessabie coges) /P Requiatior schedule 2 tare 2. dem 26 IP
Meguiation schedule !. purt 3 table 4 item 6° Fishenes Act 1994 secton /6D ‘wid nver area;, Wit Rivers Act 2005 section 434
Page 29
Page 20
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
DECLARED FISH HABITAT AREA; WILD RIVER AREA
4.13 |\s any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries
Act 1994.
Bd No-coroas1s [] Yes
If yes, is the operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)
(i) The maintenance of existing structures, including for example the following structures, if the structures [_] No (Yes
were constructed in compliance with ail the requirements, under any Act, relating to a structure of that
« Boat ramps, boardwatks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs;
+ Existing powerlines or associated powerline infrastructure
(ii) Educational or research purposes relating to the fish habitat area oO No (_] Yes
(ii) Monitoring the impact of development on the declared fish habitat area Oo No (1 Yes
{iv) The construction or placement of structures, including for example, safety signs, swimming enclosures ‘oO No oO Yes
and aids to navigation, if -
« The impact on the area is minor, and
The structures are constructed in compliance with all the requirements, under any Act, relating to a
structure of that type
(v) Public benefit works, including, for example, the construction of runnels for mosquito control, the CJNo (1 Yes
temoval of Lyngbya and seed collection for site rehabilitation, if the impact on the area is minor
(a) If yes to one or more of (i) - (v) above, does ail the proposed operational work comply with any applicable Department of
Primary industries and Fisheries (DPI&F) self-assessable code?
1 Yes - A permit for that aspect of the operational work is not required. Go to 04.14 [[] No- Goto(b)
{b) [fn to all of (i) — (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
(CINo- (Complete Farm 1, Part 02) This appication requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not
g the Assessment Manager for the application, the agency will have jurisdiction as Concurrence Agency.
Yes ,
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
Yes ~ Unless the apptication is consistent with any property development plan applying fo the tand, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and Fishertes
(DPI&F) and assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not the Assessment Manager for the application, the
O N agency has jurisdiction as Concurrence Agency.
10
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No — Uniess the application is consistent with any property development plan appiying to the and, the Assessment Manager must refuse
to receive it. (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and
Fisheries (DPI&F) and, subject fo the dectaration for the relevant wild river area, assessment for the purposes of the Wild Rivers
Act 2005. If DPISF is not the Assessment Manager for the appication, the agency has jurisdiction as Concurrence Agency.
Oo Yes - An application for the operational work will be taken to be not property made and the assessment manager must refuse to
receive it.
"PA. schequle A part! table 4. tem. 7 !PA schedule ® part 2 tuble 4 iten 3. Fishe:es Regulation 1995 311A (selt-assecsatie codes; IP Ragu‘ation schedule 2 table 2 tom 25 IP.
Rog vo2 cchede'a 1 Lat? table 4 tear 7 Wed Revers Act 2005. sectons 634 Fsnancs Oct seckor TEC wid aver arta,
Page 30
Page 21
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA
4.14. | |s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheres Act 1994?
fie No - Go fo 04.15 Yes
If yes, is the proposed operational work reasonably necessary for. (Tick applicable box/es and answer (a) and/or (b) below)
() The removal, destruction or damage of dead marine wood on unallocated State tand, other than ina ([]No [1] Yes
wild river area, for trade or commerce
(ii) The maintenance of existing structures, including, for example, the following structures, if the (No [Yes
structures were constructed in compliance with all the requirements, under any Act, relating to a
structure of that type —
+ _ boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
« — existing drainage structures;
+ _existing powerlines or associated powerline infrastructure
(iii) For educational or research purposes or for the monitoring the impact of development on marine ‘oO No (1 Yes
plants
(iv) For the construction or placement of structures, including, for example, swimming enclosures, safety [ino (Yes
signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if -
¢ The extent of the removal, destruction or damage is minor, and
« The structures were constructed in compliance with all the requirements, under any Act, relating —
to a structure of that type
(v) For the construction of runnets for mosquito control, removal of Lyngbya, seed collection for site CINo LClYes
rehabilitation or the collection of marine plants for fishing bait, or handicraft
(a) If yes to one or more of (i) — (v) above, does ail the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
(71 Yes - A permit for that aspect of the operational work is not required. Go to 04.15 CINo- Goto (n)
(b) _{f no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
Cno- (Compt rom Part 0,) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPIBF is not
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
O Yes
If eB is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
Yes ~ Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it, (Complete Form 1, Part 02) This application requires assessment by the Department of Primary industries and Fisheries
(DPI&F) and, subject fo the declaration for the retevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
DPI&F is not the Assessment Menager for the appication, the agency has jurisdiction as Concurrence Agency.
CNo
if no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or
infrastructure required to support other development for which a development permit is not required or, ifa
development permit is required, the permit is held or has been applied for?
Oo Yes - Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Farm 1, Part 02) This appiication requires assessment by the Department of Primary industies and Fisheries
(DPI&F} and, subject fo the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
DPIBF is not the Assessment Manager for the anpication, the agency has jurisdiction as Concurrence Agency.
| No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
MMA schedute @ part! tebie 4 tue 8 IPA scredule ® part? toble 4 tem 4: Fishenes Peg. ation 1995 $1134 set-assnss.ime coder) Keguiahon schedule # table 2 iteni 25 (P
Reguiztion scheduie 1, part 2 tate 4, tem & Fisnenes Act 1994, seczon 7608 (wio river areal, W.id Kivers Act 200 secoon 434 iéicver! wid wer declaration Wild Rivers Code
Page 31
Page 22
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfist, Version 21.2, 31 March 2008
WILD RIVER AREA
4.15
Is any of the operational work proposed to be carried out in a wild river area deciared under the Wild River Act 2005?
BKINo-Gotoas16 (Yes
If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 (No C1 Yes
{ii) Animat husbandry activities as defined under the Wild Rivers Act 2005 CINo C1 Yes
If yes to either (i) or (ii) above, is any part of the premises in the wild river high preservation area?
Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
CINo
If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
oO Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
Oo No - Unless the appication is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q if agricutture. Complete Form 1, Part R if animal husbandry} Subject to the declaration for the
relevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). If NRWis not
the Assessment Manager for the appiication, the agency has jurisdiction as Concurrence Agency.
IPA, schedu'e & part) mbra dt
STATE-CONTROLLED ROAD
4.16
1h 1P Ragutahon, schedue 2 tale 2 tem 37 Wud Rivers Act 2005 sectors 42 434
ts any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
PRI No- End ofsaction4 [_] Yes
if yes, is the proposed operational work associated with any of the following? (Tick applicable box/es)
(i) A material change of use that is assessable under the planning scheme
Ono [Yes
(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number offots []No [_] Yes
abutting the State-controlled road
If no to either or both (i) or (ii) above, and answers to questions in this section of the checklist indicate the proposed
operational work is assessable under IPA, schedule 8 - Answer (a) - {c) below.
{a) Is any of the proposed operational work associated with access to a State-controlled road?
ma) Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
(No Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(1 Yes - his epptication must be referred fo the DMR as Advice Agency.
(c) Does any of the proposed operational work invotve the redirection or intensification of site stormwater from the land,
on @ pipe “yy cross-sectional area greater than 625cm? that directs stormwater to a State-controfled road?
No Yes
ff yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
oO Yes - This application must be referred fo the DMR as Advice Agency.
IP eagu‘aon Sched 2 ¢ tubie fast
Page 32
Page 23
PROPOSED INDUSTRIAL ESTATE VENTURE DRIVE, NOOSA SPECIFICATION FOR LANDSCAPE WORKS SCOPE PERFORMANCE GENERAL CONDITIONS © ALL LANDSCAPE CONSTRUCTION WORK 18 TO GE CARRIED CUT AY COMPLIANOE. WTH RELEVENT COUNCIL APPROVALS AND LHS SITE PREP. / © PRIOR, TD COMMENCEMENT OF WORKS, PASTING, SITE CONDITION IS TO BE DOCUMENTED BY CONTRACTOR. ALL OOSTING My AND PROPOSED SERVICES ON SITE TO BE LOCATED AND CLEARLY WENTIFIED. ALL BUILDING RUGBISH AND EARTHWORKS DELETERIOUS MATERIALS ARE TO BE RENOVED FROM SITE 10 APPROVED WASTE LOCATION, @ LANOSCAPE AREAS SHALL GE SCARIFIED TO A DEPTH OF 150mm TO PROMOTE GOOD GROWTH FOR TURF AND @ ALL MATERIALS TO BE USED IN THE CONSTRUCTION OF THE DESIGNED LANDSCAPE ARE TO BE OF ANO INDUSTRY MATERIALS / SERMCES STANDARD QUALITY AND FROM A SUSTAINABLE SOURCE WHERE POSSIBLE, NO MATERIALS USED OW SITE SHALL GE Tox! @ ALL SELECT (TEM MATERIALS ARE TO GE APPROVED BY CLIENT PRIOR TO CONSTRUCTION ON SITE. 3 PROVIDE SERVICE CONDUITS TO ALL GARDEN BEDS FOR CARIGATION AND DRAINAGE PURPOSE. PROWDE CONDUITS FOR UGHTING WHERE REQUIRED. © ENSURE ADEQUATE ORAINAGE TO PLANTING AREAS FOR SPECIFIC SITE SO CONDITIONS WA THE USE OF SLOTTED AGRICULTURAL DRAIN (SELECT TYPE FOR APPLICATION), OVERLAND FLOW PATHS WITHIN GARDENS (SELECT RIVER ORAVEL ON GEOFABRIG MATERIAL) AND SURFACE STORMMATER PITS (LOCATED IN GENERALLY CONCEALED POSITIONS). HARDSCAPE, © PROPOSED HARDSCAPE ITENS ARE TO BE CONSTRUCTED TO AUSTRALIAN STANDARDS AND RELEVENT COUNCIL CODES BY A SUITABLY LICENCED CONTRACTOR, WORKPLACE HEALTH AND SAFETY REGULATIONS MUST BE IMPLEMENTED DURING CONSTRUCTION PHASE. PLANT MANAGEMENT AQUEPTANCE GT COUNCIL AND PROJECT LANDSCAPE ARCHITECT, @ THE CONTRACTOR SHALL OBTAR ALL PLANTS AS SPECRIED FROM AN ACCREDITED NURSERY OR OTHER APPROVED SOURCE. PLANTS SHALL GE PRE-WATERED PRIOR TO ARRIVING ON SITE. @ PLANTS SHALL GE HEALTHY, HARDY ANO OF G000 FORM. THE ROOT SYSTEM OF EACH PLANT SHOULD NOT BE. "BE COMOUCIVE TO SUCCESSFUL TRANSPLANTATION, ALL PLANTS TO G€ PEST AND DISEASE FREE 7 | my) |! 1 | ux CONTAMNE GARDEN AREAS TOA MIN, OF 200eren © ORGANIC MULCH: HOOP PINE MULCH WW ITS VARIETY OF FORMS (8 TO BE SUPPUED ANO INSTALLED TO A MIM, DEPTH OF yanwa, MULCH ISTO GE FREE OF FORAION MATTER INCLUOING WEEDS, SOL, STICKS ANO ROCKS, AVOO PLACEMENT OF WULGH AGANST STEM OR TRUNK OF PLANTS. GRADE MULCH TO BE SELF RETAINED WITHIN GARDEN © GRAVEL IALCH: SOmm to 75mm SELECTED WASHED RIVER LACH GRADED IN SIZE AND COLOUR USE IN AREAS AS SPEUFED ON PLANS. TO 0E USED TO SEPERATE ORGANIC MULCH FROM TME WALLS OF ULOQGS, ADJACENT PATHS SRO TO FAGLITATE CRAMAGE WITHIN GARDEN BEDS. MIN, DEPTH TO BE TMCE THE OIAMETER OF THE LARGEST TURF © TURF SHALL CONSIST OF A DENSE, WELL ROOTED, VIGOROUS GRASS GROWTH WITH NIN. 25mm OF TOPSOIL. TURF IS TO LOCALITY PLAN Be DELERED TD SITE WTHIN 24 HOURS OF GENO CUT. TURF SHOULD GE FREE FROM DELETERIOUS MATERIAL INCLUDING WEEDS, SEEDS OR ROOTS INCLUDING MUT GRASS AND OXAUS TURF SHALL BE SUPPLED WM UNFORS SIZE wi Scala 1:1000 @ At UNGROKEN CONDITION, WOISTURE LEVEL OF TURF TO REMAN CONSISTANT DURING LAYMO. TURF TO BE LAID ALONG CONTOUR AND PINNED ( GREATER THAN 1:4 SLOPE. © PREPARE SUBGRADE TO. A LEVEL GASE WITH AN APPROVED TOPSOU. AND SPREAD UNDER TURF FERTILIZER AT RECOMENDED RATE. TURF TO FINES LEVEL WWIK PATHS, EDGES AMD KERES AFTER ROLLNG AND SETTLEMEN IRRIGATION © IRRIGATION TO GE STALLED BY A SIXTAILY QUALIFIED CONTRACTOR AND OC STALLED IW ACCORDANCE WITH ALL COUNCL WATER REGULATIONS. @ THE MOST WATER EFFICIENT METHOD OF IRRIGATION 1S TO BE USED, CONNECTED TO TANK SUPPLY WHERE POSSIBLE. © GONDAITS TO BE LAD TO ALL GARDEN AREAS TO PROWDE A REGULATED COVERAGE. FLUSH AND PRESSURE TEST FROOR TO COMMISSIONING, PROVEE AS CONSTRUCTED ORAWHOS CLEARLY SHOWNG LOCATION OF ALL GTRGATION COMPONENTRY. © THE CONTRACTOR SHALL GE RESONSIRLE FOR THE CARE AND MABITEKANCE OF ALL LANDSCAPE WORKS FOR A PERKO LANDSCAPE OF 13 WEEKS AFTER COMPLETION. ESTABLISHMENT WAINTENANGE 1S 70 (NOLUDE MOMNO OF TURF, REMOVAL AND SPRAYING OF WEEDS, PRUNING AND TRIMMING OF PERIOD SHRUBS WERE REGURED, REPLACEMENT OF EAD OR DISEASED PLANT STOGK AMO) CORRECT WRUNG OF RAICATION RATER iS TO BE PROWDED TO ALL SOFT LANDSCAPING AT A REQUIRED RATE OURDNG THE ESTABLISHMENT PERIOD TO ENSURE HEALTHY AND WOQROUS GROWTH, LANDSCAPE PLAN Operational Works - Sheet 1 PROC Seem PROPOSED INDUSTRIAL ESTATE - VENTURE DRIVE, NOOSA 2 sina Gea ea e ows"TlE LANDSCAPE PLAN - SHEET 01 OPERATIONAL WORKS cust ~— GATEWAY RISE PTY LTD. pave SES suas Sameer a (GQ) meer Fe ereere fC] Cc] C_] sexe Fed erensee fe wom Fed orca ee es} fom ee me MERLE errno acon = ; oO 8 oo Ea —————— ;
Page 24
rm 2x CUP ana (—— 3x WAT flo
ee ee SS Se ee ee SSS eee
ar —or =
8x BAE vi i
28x DIA BR 4 ~~ ; ae
i7xGREst | i ,
? ij i i /
f A 3x BAN int ! t
11 | { i i / PLANT SCHEDULE - Streetscape
; ry. : { i
/ / ae te i / TREE SPECIES
3x WAT fe = i ! i Ret Botanical Name Common Name Ste Quantity
fe as aes sees ‘ Lecce ines eenngerenrmrerrerr erence . i ACA ret Acacia melanoxylon Blackwood 200 pot 15
| fo | j i ACRimp — Acronychia imperforate Logan Apple 200pet «10
: 1 i 1 C i ALL lit Allocasuarina iittoralis Black She Oak 200pot «18
| . i BAC nyt —- Backhousia myrtifolia Grey myrte 200pot «18.
- ; { BAN int Banksia integrifotia Coast Banksia Bt 2
/ roy | : i ! CUP ana — Cupaniopsis enacardinites Tuckeroo 25 tr a
| ! a ; ! ELA ret Elasocarpus reticulatus Glueberry Ash 200 pot 13
1 0 . ! t MAC tan —-Macaranga tanarius Macaranga 20pr 8
| : | ! WAT fo Watevhousia floribunda Weeping Lilly Ply 25 hr 33
| 3X SAN int —- + fh —
| , i e SHRUB SPECIES
| if Spi79i Y Ret Botanical Name Common Name Sie Quantity
“a BAN er Banksia ericiolia Heath Banksia 140 pot 34
BAN rob Banksia Robur Swamp Banksia 140 pot 13
i BAE vir Baeckea virgata Twiggy Baeckea 140 pot a2
i LOM nya —_Lomendra longifolia ‘nyatia’ Lomandra 200 pot 141
GROUNDCOVER SPECIES
t Ref Botanical Name Common Name Ste Quantity
\ iit 1 GRE sta Grevillea stenomere prostaie ayn.G. pinaster 140 pot 115
\ Nd eee ee errr DIA BR Dianella Breeze Flax Lilly 200 pot 25
\ i |
\; ; 3x WAT flo STREET TREE SPECIES ARE TO COMPLY WITH NATSPEC ANO RELEVENT COUNCIL CONDITIONS,
1 }
q : it 3x WAT
eS Ti REFER SHEET 04 FOR
i ABD i BIORE TENTION BASIN DETAILS
a Ti
S \ J
ie
4 +
3 Sy : 4 | L
; 4x CUP ana ‘ \
\
é
ity
: i
‘ CONTRACTOR TO CONFIRM
oh LOCATION OF BOUNDARIES &
vscorcccemen . SERVICES PRIOR TO COMMENCING
& el Baurepron ti amewo LANDSCAPE WORKS.
* seoten eto: [Tree Planting Distances from Services,
mow in DIST, | SERVICE
coe POWER POLES:
wn. FIRE HYDRANT
a STREET UGHTS
om. STORMWATER PTT
im OTHER SERVICES
|_io DST. | DESCRIPTION
6 ‘STREET TREES FROM KERG
fan | TREEB& SHRUGS FROM.
SAFETY PENCE
minzin, | STREETTREE
SPAGHOS FOR MATPLES
281 STREET TREES TO SE CLEAR TRUNKED TO
1.2m. MULCHED COLLAR TO $0Gmm,
ADVANCED TREE STOCK ws DIA CONTAINED IN HARD EDGE
. PLANTING OSTAR on REFER TO SPECICATION
LANDSCAPE PLAN Operational Works - Sheet 2
*@£T ~BROPOSED INDUSTRIAL ESTATE - VENTURA DRIVE , NOOSA Sa ae element design
OO Ng landsca rehitecture wat
eC owe LANDSCAPE PLAN - SHEET 02 OPERATIONAL WORKS ©" GATEWAY RISE PTY LTD ——— eaenonnce senor,
aN CONTE, 26S eee eaceeegaon eerie” a ic Minton reer ane to oni ‘
6 oO oo eyo a ee om Eee clement proucevee es
(G3! eazy pareve [=] cries EARNS CJ Ba 20 pararea soe | | vara F4 enstaseees d LSS i
@sign| ep7ie7 opw-o2 A
Page 25
“7 3.x BAE vir |19x GRE ste |
BAN et A 5x GRE ste [3x WAT flo 87x LOM nya a
49x GRE ste ~ ax BAC myr|i9 x GRE ste 9x GRE ste |
SS 3x BAE vir (5 x LOM nya
= of pemtmnenemneyreaannmnammamsapamn es etre tert
SoS = fers ome tn “ i as a " —— ia * =r
= = pegs ee ee Seeet ——- ai a a | f : —__.
REGS RCO SEM, [ech eae | 4 : oy
\ axeiart— j nh +6 Sy ty 3 x WAT flo | / / poe
3x ELA ret © | 3x BAC nyr 1 1XBAC mye y ON \\ / f 7
x in 4 — i v ‘ \ .
3x ALL it 5x BAN ef Sx BAN en j ~ \ , cal ‘
1X ACR it i } iM. 6 °o :
i 3.0 : :
Ay - f 4 Vs
+x CUP ana Ly j wl / / f
5 i Sh x! / ‘
~~? 4 / ‘
yk cts xcurke J m2 LL
t | y cy ae) roy
; ' 6 4 wi !
| \ spy702991 j
‘ 3.x BAN int
i ;
1x CUP ana
@ i]
\ . 4x CUP ana
' ; ! /
4 0!
. 1.x CUP ana
|
| | J
!
L , 1
spisiz0e :
. \\ CONTRACTOR TO CONFIRM
Plant out the landscape area ina | 15 x ACA mel \ LOCATION OF BOUNDARIES &
random pattern to simulatea = |: 9 x ACR imp L* SERVICES PRIOR TO COMMENCING
natural forest setting. Structure in | 27x GRE ste eae LANDSCAPE WORKS.
a 3 tier system with larger trees to tor eaen -
the rear. 19x BAN er} she ‘2 [Tree Planting Distances from Services|
9X ELA ret =
7x MAC tan min, pest. |_ SERVICE
15 x ALL it on FIRE HYDRANT
35 x LOM nya fe STREET UGHTB
@ 26 13 x BAN rob am. STORMWATER PIT
‘im. OTHER SERVICES:
sris1408
|_min pis. | O&RcRTION
Ofn ‘STREET TREES FROM KERB
42m. ‘TREES & SHRUBS FROM
SAFETY FENCE
min 2.4m, ‘STREET TREE
SPACINGS FOR MULTIPLES.
‘25. STREET TREES TO SE CLEAR TRUNKED TO.
‘an MALHED COULAR TO tOnm,
" tA, CONTAINED
— PIANING DEAL " cr -REFER TO SPECICATION
roo? MLIGG? Poet MIA
block budding block building
Floor AR38 FRoce MLA33 | eel diets
LANDSCAPE PLAN Operational Works - Sheet 3
err
ECT 2 —— ee element design
ProECT PROPOSED INDUSTRIAL ESTATE - VENTURA DRIVE , NOOSA ee ) jondseape archileclure —
Caeyragat Sor wins ott maty pacar mnveeminemg Sow
PANTS cour tenes Sma ate ws Mode io teen
a om Cle (ses jee Gee Efe ES + | SES Sines
msc SERISamiass element | Shame
featume corm Toes ‘stLect reams worieiron sar ware erermo semen j ——————— i=
me a ee LJ E-4 Es design] ep7is7 opw-o3 aa
SZ e ocTME LANDSCAPE PLAN -SHEET 03 OPERATIONAL WORKS =" GATEWAY RISE PTY LTD ——_—— 5 ERI EE Sees
Se a oe,
Pile
Page 26
MAINTAIN OPEN TURF AREA TO
BASIN WALL BATTERS TO BE JUTEMAT.
LUNED FOR SCOUR PROTECTION.
“_ RETAINING WALLB TO
oe pe eee ee ENGINEERS DETAIL
Ae % See alo
| REHABILITATION SCHEOULE
PAD RRALIOA Tom CCE MOAR PONG REVEQRTATIN
PROTECTIVE MEASURES:
* PROTECTIVE MEASURES SHOULD BE TAKEN TO ENSURE THE INTEGRITY OF EXISTING VEGETATION, RETAIN
SELECT VEGETATION WHERE POSSIBLE AND PROVIDE A STABLE ENVIRONMENT FOR NEWLY PLANTED:
VEGETATION.
WEED SPECIES IDENTIFICATION.
NON-LOCAL NATIVE FLORA WEED SPECIES AND EXOTIC FLORA ARE TO 8E IDENTIFIED BY A SUITABLY
QUALIFIED CONSULTANT.
ATTENTION IS REQUIRED FOR THE DETECTION OF -
* WEED GRASSES, ENVIRONMENTAL WEEDS AND SPECIES WITH RESTRICTIONS - MAROOCHY SHIRE COUNCIL,
* DECLARED PLANTS (LAND PROTECTION (PEST AND STOCK ROUTE MANAGEMENT) ACT 2002 (QLD)
“UNDESIRABLE PLANTS AND LIST OF NATURALISED PLANTS IN SOUTH EAST QUEENSLAND
(BATIANOFF & BUTLER, 2001, QUEENSLAND HERGARILM)
WEED CONTROL METHODS,
TREATMENT OF WEEDS IS TO BE UNDERTAKEN USING BEST HORTICULTURAL PRACTICES,
WEED TREATMENT METHOD MUST PROVIDE PROTECTION FOR EXISTING NATIVE VEGETATION AND REQUIRED
REHABILITATION VEGETATION. AVOID POSSIBLE SOIL DISTURBANCE WHICH INCREASES RISK OF EROSION
AND ADDITIONAL WEED INFESTATION.
USE ONLY PESTICIDES APPROVED FOR TARGET USE. CHEMICAL MANUFACTURERS INSTRUCTIONS FOR USE
OF PESTICIDE ARE TO BE FOLLOWED. .
ALL NOXIOUS WEED SEED OR PROPAGATIVE MATERIAL SHOULD BE REMOVED FROM SITE AND DISPOSED OF
AT A APPROVED COUNCIL WASTE STATION.
WEEDS ARE TO BE CONTROLLED DURING THE CONSTRUCTION AND ‘ON MAINTENANCE’ PHASE OF WORKS.
MULCHING IS TO FORM PART OF THE WEED MANAGEMENT STRATEGY. MULCH DEPTH TO BE APPROX, 100 -
450mm DEEP. MULCH TYPE TO BE FOREST MULCH OR CANE MULCH OR APPROVED SIMILAR. MULCH TO BE
FREE FROM WEED MATERIAL AND FOREIGN DEBRIS, COUNCIL REFUSE MULCH IS NOT ACCEPTABLE, MULCH
JUTE MATS TO BE USED IN LOW AREAS ADJACENT WATERWAYS WITH RISK OF WASH,
FOR FURTHER WEED TREATMENT INFORMATION REFER TO:
QUEENSLAND OEPARTMENT OF NATURAL RESOURCES AND MINES - PEST FACTS. www.nrm.qid.gov.su/pests/
EROSION CONTROL
EROSION CONTROL METHODS ARE TO BE iN GENERAL ACCORDANCE WITH 'SOlt EROSION & SEDIMENT
CONTROL' - ENGINEERING GUIDELINES FOR QUEENSLAND CONSTRUCTION SITES - JUNE 1996"
METHODS WiLL INCLUDE SEDIMENT FENCING TO BE INSTALLED GENERALLY ALONG CONTOUR AS REQUIRED,
EROSION CONTROL JUTE MATTING (SECURELY PINNED & APPROPRIATELY OVERLAPPED) WILL BE INSTALLED
TO MANUFACTURERS INSTRUCTIONS THROUGHOUT INTERNAL BATTERS OF BIO-RETENTION BASIN.
JUTEMAT OR OTHER EROSION CONTROL MATTING SHALL ALSO BE USED BENEATH ANY DRY ROCK WORK,
@LANKET MULCHING THE BALANCE OF THE REVEGETATION AREA TO REQUIRED OEPTH WILL FOLLOW
EARTHWORKS AS SOON AS PRACTICAL.
INDIGENOUS REVEGETATION
* ALL NATURALLY OCCURING LOCAL PLANT SPECIES TO BE PROMOTED IN CONJUNCTION WITH PROPOSED
REVEGETATION SPECIES.
“ INDIGENOUS PLANT SPECIES TO BE LOCALLY SGURCED AND PLANTED IN, AQCORDANCE WITH LOCAL
LANDCARE AND CATCHMENT CARE GROUP QUIDELINES,
TUBESTOCK PLANTING PROCEDURE
* WATER TUBE STOCK PRIOR TO PLANTING.
* SPREAD MULCH AWAY FROM PLANTING HOLE TC BE DUG.
“ EACH HOLE TO BE DUG AT LEAST TWICE THE SIZE OF THE POT TO BE PLANTED.
* BREAK UP PREPARED HOLE WALLS IF GLAZED AND BASE IF COMPACTED.
* ADD WATER TO HOLE IF ORY.
* REMOVE TUBE FROM CONTAINER AND PLACE IN HOLE, POTTING MIX TO BE 25mm BELOW GROUND.
LEVEL AFTER BACKFILLING AND PRESSING GENTLY TO SECURE.
* ADD ORGANIC MIX SOIL TO HOLE IF EXISTING GROUND |S DEFICIENT.
* CREATE A SMALL DAM AROUND TUBE WITH EXCESS SOIL TO HOLD WATER.
* REPLACE MUCH AROUND TUBE (OR MULCH MAT) MAINTAINING CLEAR ZONE 40mm FROM STEM.
*WATER IN NEW PLANTINGS - THREE TIMES IN FIRST WEEK / TWO TIMES IN SECOND WEEK / ONCE IN
THIRD WEEK, (ADJUST WATERING WITH RAINFALL)
* MONITOR PLANT PROGRESS AFTER THIRD WEEK - DEEP WATER AS REQUIRED.
* USE WATER SAVING CRYSTALS OR SIMILAR IN DRY SOIL CONDITIONS.
BIORETENTION MAINTENANCE
* ROUTINE INSPECTION OF THE BIORETENTION PROFILE TO IDENTIFY ANY AREAS OF INCREASED
SEDIMENT DEPOSITION, SCOURING FROM STORM FLOWS, RILL EROSION OF THE BATTERS FROM
LATERAL INFLOWS, DAMAGE TO THE PROFILE FROM VEHICLES AND CLOGGING OF THE
BIORETENTION BASIN.
* ROUTINE INSPECTION OF INFLOW SYSTEMS, OVERFLOW PITS AND UNDER-DRAINS TO IDENTIFY
AND CLEAN ANY AREAS OF SCOUR, LITTER BUILD UP AND BLOCKAGES.
* REMOVAL OF SEDIMENT WHERE IT IS SMOTHERING THE BIORETENTION BASIN VEGETATION,
*TILLING OF THE BIORETENTION BASIN SURFACE IF THERE IS EVIDENCE OF CLOGGING,
* REGULAR WATERING /IRRIGATION OF VEGETATION UNTIL PLANTS ARE ESTABLISHED AND
ACTIVELY GROWING.
* REMOVAL AND MANAGEMENT OF INVASIVE WEEDS (HERBICIDES SHOULD NOT BE USED)
* REMOVAL OF PLANTS THAT HAVE DIED AND REPLACEMENT WITH PLANTS OF EQUIVALENT SIZE
AND SPECIESAS DETAILED IN THE PLANT SCHEDULE.
* PRUNING TO REMOVE DEAD OR DISEASED VEGETATION MATERIAL AND TO STIMULATE GROWTH.
Se ae A A
PLANTING FOOTING
BIQ-RETENTION PLANTING DETAILS Zone | Species Common Name Height | Form | Planting (aty/
(mn) Density m2!
ZONE LOCATION AREA PLANT DENSITY QUANTITY ‘SPECIES
(eam) daty/9qm) A | Cymbopogon refroctus Berbed Wire Grose 0.3 Tufted
Ac | Dicnsils brevipendunculate Flax tly 05 | Tufted
NAMING US GRADIENT FOR F: | ZONEA| BATTER 353 ma 2-4/6-8 1872 0 | Chania eieberania Red—tuked Saw Edge| 1.5-3| Tufted
BEER oir © | Tadlepsis nodosa ‘Knobby Club Rush 06 Tufted
fe] ZONEB| BASE $70 m2 a8 550 C \Vuneye ceitatue Common Rush O5 | ToRted
Borrow oF eas rou KT] Lepidosperma lotercie Variable Sword Edge | 0.5-1| Tufted
LAYER FOR 12 MONTHS, [33] trowe B,C | Lomandre hystrix Greek Mott Rush 10 Tufted
| DRAINAGE MEDIUM INTEGRITY ZONEC | SAS 4916-8 “e KB.GD| Lomandra tongifalio Watt Rush 7-15] Tahted
gp Minter Hs aap td 0 "| Schoenoplectua mucronatus | Cub Rush DS=1 1 Tufted
MACROPHYTE SPECIES: P|
ly ZONE D BASE 110 mz 4-816-8 138 A Themedia oustratis Kongoros Grass 0.3-0.5) Tufted
: K | Bebingtonte elmilte Twiggy Myrte 2-3 {shine
Banksic V2 ‘Shrub
Concrete Avcess Drivewe; = ("J | Bonksic robur ‘Swamp
(Overland Fow Path) ¥ ZONEE | Ase ali 4-6/6-8 188 AT eailiatemon pachyphylus Wollum Bottlabrush 7 Shrub
K] Hardenbergia viclacea Purple Coral Pea Shrub
DETAILS FOR PLANTING DENSITIES AND SPECIES REFERENCED FROM WSUD TECHNICAL folk ‘Shi
DESIGN GUIDELINES SOUTH EAST QUEENSLAND - VERSION 4 JUNE 2008 AE" | Leptespermum polygolitoium | Wid Ney rub
_! A | Melaieuce thymifolia Thyme Honey Myrtle Shrub
KE | Maestemne affine Native Lesiondre Shrub
ai A ‘Acacia sophorae Cooatal Wattle Tree 7
Tin building 3 A Collistemen viminalis Weeping Gottlebrush Tree <1
a BIO-RETENTION PLANTING RATIONALE K [Caifistemon edlignus White Bottlebrush Tree Hi
4 Pana oe ncn RGSS EDUCATORS DR PERDDEAUY PPO CROAT ORT A | Elgeosarpus cbovetve Herd Quandong Tree <t
8 AES ve cenoeen POM TED MO RASTANED AD + WUFTAIIAILE TACLITY TO PROVE THE CEPED LEVEL OF ETDmRUMA TER TREATISE A Lophostemon suaveolens ‘Swamp Box Tree <i
Tre ee creanen na eATEN is PERETEDR SEWED en en B Nach Tnarilfoli Flax Leat 7K Sato} <1
See ee ea ene a ett he xa hinas une ADH CAOWAMODOTIEAN ATER jau68 Tnariifolia jax Leaf Paporba ca
= A | Meloleuco nodosa Pickly-leafed Paparbark) 2-7 | Tree 7-4
K | Melolevca quinquemerto Broad—leated Poperbark! 8-20[ Tree <7
LANDSCAPE PLAN Operational Works - Sheet 4
7
PROECT |
PROPOSED INDUSTRIAL ESTATE - VENTURA DRIVE , NOOSA element design ai
landscape architecture .
eS owoTME LANDSCAPE PLAN - SHEET 04 OPERATIONAL WORKS “= GATEWAY RISE PTY LTD wR TunE EE :
spaneinee context _scscse Samaacs # REVERT MR ONTS = wane :
(meer tee ora comm eat Se ae eee {8 tanene Ba, wpe r on
6 2) C= J Cy CJ Ej f= Ea CO | eee
ae Co J Co Exjue fe] omen design =,
9 ED 7197 OPW-04 A]
Page 27
Su nshine Coast PeveL ENT FEES & ees r
‘ se Retum to Admin Officer, Development)
Regional Council
APPLICATION AND GENERAL FEES "AMOUNT | RECEIPT TYPE | BONDS - Bond Refund Detalla”
Application Fees 540 Payee Name:
Road / Drainage Plan Exam lop / Address:
Road / Drainage Field Inspection 22S
Legal Document Examination
Sealing Fee - Survey Plans, Legal Documents
Sale of Documents, Policy Lists, Misc
Bonding Admin Fee (Contributions, uncompleted works}
Closed Circuit TV Inspection
Pre-lodgement Meeting Fee
CONTRIBUTIONS
Developer Contribution - Landscaping
Developer Contribution — Road Other than PSP
Developer Contribution - Drainage Other than PSP
Developer Contribution - Pathway Other than PSP
Developer Contrib. ~ in Lieu Of St Parking (PSP13 Car parking) [|
Developer Contribution ~ Other Parks and Community {|
CALCULATIONS _
Lot Calculation
| Plan Examination Calculation
tal
AMOUNT _| RECEIPT TYPE
§50
553
554
685 Inspection Calculation
561
ROADWORKS CONTRIBUTIONS
ICS - Community Land (Not currently active) Catchment:
ICS - Public Transport
ICS - Sewerage (PSP Rural)
ICS ~ Sewerage (PSP Coastal)
ICS ~ Sewerage - South Peregian (PSP Maroochy)
ICS — Water Supply (PSP)
557
613
Road/Section:
ATION DETAILS _
Payee Name:
Address:
APPLIC.
ICS - Sport and Recreation Land (PSP Parks)
ICS — Drainage (PSP Noosaville Master & Ward Street)
ICS — Road (CMRNICP) If BA not entered then use 594
ICS — Pathway (PSP)
Total of Fees Paid (Excluding Bonds) Development Location:
CPI Date: _ . _ | AMOUNT | RECEIPT TYPE | File Numbers or Reference:
Security Deposits/Performance/Maintenance/Uncompleted Works Bond 51 (Cat 9) WW: 2oOo*e ° Ai -\
Total of Fees Paid (Including Bonds) $ 2G0- Date application properly made:
ReceiptNo: 39Gol<<| [Receipt ater JIGS |
PdLand DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES. doc
Used in these records
08/0771 - OP Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.