Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

08/0771 - OP Works - Landscaping [As Published] · 142008.771

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008

SECTION 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME
41 is any of the proposed operational work assessable under a planning scheme?
(No - Goto 04.2 [Xd Yes - (Comptete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.
STATE-CONTROLLED ROAD
4.1.1. | Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
fNo
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?
BRINo (7 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(1 Yes
If yes, is all of the proposed operational work associated with the following?
(i) A material change of use that is assessable under the planning scheme (No (Yes
(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number oftots [[}No [1] Yes
abutting the State-contolled road

If no to elther or both (i) or (ji) above - Answer (a) - (c) below

(a) Is any of the proposed operational work associated with access to a State-controlled road?
(No C1 Yes - this appication must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

 

 

 

 

{b) 1s any of the proposed operational work for filling or excavation?

[DINo (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This epplication must be referred fo the Department of Main Roads (OMR) as Concurrence Agency
[1 Yes - This apptication must be referred to DMR as Advice Agency.

(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
(No (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This eppfication must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(1 Yes - mis apptication must be referred to DMR as Advice Agency.
IP Regu'stion. schedule 2 tabe 3, tam 3 IP Reguishon, scheduie 2, talve 3 vem 115).
ACID SULFATE SOILS
4.1.2 | \s any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils?
CINo-Gowasss Ba Yes

if yes, is the natural ground level of any point where work is being carried out less than 20m AHD?

 

 

CINo Yes
\f yes, does the proposed operational work involve the following?
{i) Excavating more than 1,000m* of soil or sediment at or below 5m AHD KKINo (1 Yes

(ii) Filling the premises with 1,000m? or more of material with an average depth of 0.5m on vy No (1 Yes
land, soit or sediment at or below 5m AHD

If yes to either or both (i) or (ji) above - This appication must to be referred fo the Department of Natural Resources and Water (NRW) as
Advice Agency

 

 

 

IP Regulation. schedule 2 table 3 tem 4 State Planning Policy 2/02' Planning and Managing Deve‘opment mvolving Acid Suttate Sons section 36

 

4. Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Dougias,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, !sis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Mornington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

Page 21

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0771 - OP Works - Landscaping [As Published].pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.