Council archive · source document
08/0771 - OP Works - Landscaping [As Published] · 142008.771
INTEGRATED PLANNING ACT 1997 ‘DAS Assessment Checklist, Version 21.2, 31 March 2008
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
411
Is any of the operational work proposed to be carried out within a coastal management district?
SENo-cotoass2 [Yes
If yes, is the proposed operational work for the following?
()__ Interfering with quarry material on State coastal land above high-water mark (No [Yes
(i) Disposing of dredge spoil or other solid waste material in tidal watera [CINo [}Yes
(ii) Draining or allowing drainage or flow water or other matter across State costal land above high-water LINo ()Yes
mark
(iv) Constructing or installing works in a watercourse where the works are not assessable under IPA, CINo [Yes
schedule 8, part 1, table 4, items 3 or 4
(¥) Reclaiming land under tidal watera [No [Yes
(vi) Constructing an artificial waterway, other than a canal, associated with reconfiguring a lot LCINo ‘ Yes
(vii) Constructing an artificial waterway that is a canal, associated with reconfiguringalots = = [J No Oo Yes
(viii) Constructing an artificial waterway not associated with reconfiguring a lot on land, other than State CINo "C1 Yes
coastal land, above high-water if the maximum surface area of water on the waterway is at least 5,000m?
(x) Constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal fand, CINo (Yes
above high-water mark
(x) Removing or interfering with coastal dunes on land, other than State coastal fand, that isin an erosion [[}No [1 Yes
prone area and above high-water mark
If yes to one or more of (i) - (x) above, is any ofthe proposed work to be carted outin nawid fiver area under the Wild Rivers Act
2005?
(C1 No - (Complete Form 1, Part M) This appfcation requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. if yes, above, (0 any shown bold and marked with the symbol a,
Oo the application also requires assessment by Queensland Transport (Marine Safety Qa) as Concurrence Agency.
Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
Yes - Unless the application is consistent with any property development plan applying fo the land, the Assessment Manager must refuse to receive it
(Complete Form 1, Part M) This appitcation requires assessment by the Environmental Protection Agency (EPA). If EPA is not the Assessment
Manager for the application, the agency has jurisdiction as concurrence Agency. it yes, above, to any shown bold and marked with the symbol, the
application also requires assessment by Queensland Transport (Marine Safety Qi) as Concurrence Agency. Subject to the dectaration for the refevant
wild river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
o No - An application for the operational work will be taken fo be not properly made and the Assessment Manager must refuse to receive it,
IPA schedule 8, part 1, table 4, item 5 IP Regutation, schedule 2. table 2. items 12 and 14. IP Regulation schedule 1, part J, table 4, items 4A and 5, Coastal Protection and Management
Act 1995 Act 1995, section 1044 (witd aver area)’ Wild Rivers Act 2005, secton 430.
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12
Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
BXNo-Gotoas13 (1 Yes
If Ss is any of the proposed operational work to be carried out in 2 wild river area declared under the Wild Rivers Act 2005?
No
ff no, is all of the operational work for constructing or raising waterway barrier works - fick applicable boxes and answer (a) and/or (b) below
(i) temporary CONo OyYes
(ii) minor CNo OYes
(iii) rebuilt on a regular basis (No Yes
(a) If yes to one or more of (i) ~ {ifi) above, does all the proposed operational work comply with any applicable Department
of Primary Industries and Fisheries (DPI&F) self-assessable code?
C1 Yes - A permit for that aspect of the operational work is not required. Go to 04.13 CI No-Goto(y)
(b) {fo to all of (i) — (iii) or no to (a) above - (Complete Form 1, Part Os) This application requires assessment by the Department of Primary
industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
CJ Yes
If yes, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part Q3) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). and,
Subject fo the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if DPISF is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - An application for the operational work will be taken fo be not property made and the Assessment Manager must refuse fo receive it.
IPQ schouuie 8 part? fedle 4 #em 6 IPA schedule 8 part 2. fable 4. tem 2 Fisnenes Regutation 1995 31134 (sel-assessabie coges) /P Requiatior schedule 2 tare 2. dem 26 IP
Meguiation schedule !. purt 3 table 4 item 6° Fishenes Act 1994 secton /6D ‘wid nver area;, Wit Rivers Act 2005 section 434
Page 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0771 - OP Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.