MAINTAIN OPEN TURF AREA TO
BASIN WALL BATTERS TO BE JUTEMAT.
LUNED FOR SCOUR PROTECTION.
“_ RETAINING WALLB TO
oe pe eee ee ENGINEERS DETAIL
Ae % See alo
| REHABILITATION SCHEOULE
PAD RRALIOA Tom CCE MOAR PONG REVEQRTATIN
PROTECTIVE MEASURES:
* PROTECTIVE MEASURES SHOULD BE TAKEN TO ENSURE THE INTEGRITY OF EXISTING VEGETATION, RETAIN
SELECT VEGETATION WHERE POSSIBLE AND PROVIDE A STABLE ENVIRONMENT FOR NEWLY PLANTED:
VEGETATION.
WEED SPECIES IDENTIFICATION.
NON-LOCAL NATIVE FLORA WEED SPECIES AND EXOTIC FLORA ARE TO 8E IDENTIFIED BY A SUITABLY
QUALIFIED CONSULTANT.
ATTENTION IS REQUIRED FOR THE DETECTION OF -
* WEED GRASSES, ENVIRONMENTAL WEEDS AND SPECIES WITH RESTRICTIONS - MAROOCHY SHIRE COUNCIL,
* DECLARED PLANTS (LAND PROTECTION (PEST AND STOCK ROUTE MANAGEMENT) ACT 2002 (QLD)
“UNDESIRABLE PLANTS AND LIST OF NATURALISED PLANTS IN SOUTH EAST QUEENSLAND
(BATIANOFF & BUTLER, 2001, QUEENSLAND HERGARILM)
WEED CONTROL METHODS,
TREATMENT OF WEEDS IS TO BE UNDERTAKEN USING BEST HORTICULTURAL PRACTICES,
WEED TREATMENT METHOD MUST PROVIDE PROTECTION FOR EXISTING NATIVE VEGETATION AND REQUIRED
REHABILITATION VEGETATION. AVOID POSSIBLE SOIL DISTURBANCE WHICH INCREASES RISK OF EROSION
AND ADDITIONAL WEED INFESTATION.
USE ONLY PESTICIDES APPROVED FOR TARGET USE. CHEMICAL MANUFACTURERS INSTRUCTIONS FOR USE
OF PESTICIDE ARE TO BE FOLLOWED. .
ALL NOXIOUS WEED SEED OR PROPAGATIVE MATERIAL SHOULD BE REMOVED FROM SITE AND DISPOSED OF
AT A APPROVED COUNCIL WASTE STATION.
WEEDS ARE TO BE CONTROLLED DURING THE CONSTRUCTION AND ‘ON MAINTENANCE’ PHASE OF WORKS.
MULCHING IS TO FORM PART OF THE WEED MANAGEMENT STRATEGY. MULCH DEPTH TO BE APPROX, 100 -
450mm DEEP. MULCH TYPE TO BE FOREST MULCH OR CANE MULCH OR APPROVED SIMILAR. MULCH TO BE
FREE FROM WEED MATERIAL AND FOREIGN DEBRIS, COUNCIL REFUSE MULCH IS NOT ACCEPTABLE, MULCH
JUTE MATS TO BE USED IN LOW AREAS ADJACENT WATERWAYS WITH RISK OF WASH,
FOR FURTHER WEED TREATMENT INFORMATION REFER TO:
QUEENSLAND OEPARTMENT OF NATURAL RESOURCES AND MINES - PEST FACTS. www.nrm.qid.gov.su/pests/
EROSION CONTROL
EROSION CONTROL METHODS ARE TO BE iN GENERAL ACCORDANCE WITH 'SOlt EROSION & SEDIMENT
CONTROL' - ENGINEERING GUIDELINES FOR QUEENSLAND CONSTRUCTION SITES - JUNE 1996"
METHODS WiLL INCLUDE SEDIMENT FENCING TO BE INSTALLED GENERALLY ALONG CONTOUR AS REQUIRED,
EROSION CONTROL JUTE MATTING (SECURELY PINNED & APPROPRIATELY OVERLAPPED) WILL BE INSTALLED
TO MANUFACTURERS INSTRUCTIONS THROUGHOUT INTERNAL BATTERS OF BIO-RETENTION BASIN.
JUTEMAT OR OTHER EROSION CONTROL MATTING SHALL ALSO BE USED BENEATH ANY DRY ROCK WORK,
@LANKET MULCHING THE BALANCE OF THE REVEGETATION AREA TO REQUIRED OEPTH WILL FOLLOW
EARTHWORKS AS SOON AS PRACTICAL.
INDIGENOUS REVEGETATION
* ALL NATURALLY OCCURING LOCAL PLANT SPECIES TO BE PROMOTED IN CONJUNCTION WITH PROPOSED
REVEGETATION SPECIES.
“ INDIGENOUS PLANT SPECIES TO BE LOCALLY SGURCED AND PLANTED IN, AQCORDANCE WITH LOCAL
LANDCARE AND CATCHMENT CARE GROUP QUIDELINES,
TUBESTOCK PLANTING PROCEDURE
* WATER TUBE STOCK PRIOR TO PLANTING.
* SPREAD MULCH AWAY FROM PLANTING HOLE TC BE DUG.
“ EACH HOLE TO BE DUG AT LEAST TWICE THE SIZE OF THE POT TO BE PLANTED.
* BREAK UP PREPARED HOLE WALLS IF GLAZED AND BASE IF COMPACTED.
* ADD WATER TO HOLE IF ORY.
* REMOVE TUBE FROM CONTAINER AND PLACE IN HOLE, POTTING MIX TO BE 25mm BELOW GROUND.
LEVEL AFTER BACKFILLING AND PRESSING GENTLY TO SECURE.
* ADD ORGANIC MIX SOIL TO HOLE IF EXISTING GROUND |S DEFICIENT.
* CREATE A SMALL DAM AROUND TUBE WITH EXCESS SOIL TO HOLD WATER.
* REPLACE MUCH AROUND TUBE (OR MULCH MAT) MAINTAINING CLEAR ZONE 40mm FROM STEM.
*WATER IN NEW PLANTINGS - THREE TIMES IN FIRST WEEK / TWO TIMES IN SECOND WEEK / ONCE IN
THIRD WEEK, (ADJUST WATERING WITH RAINFALL)
* MONITOR PLANT PROGRESS AFTER THIRD WEEK - DEEP WATER AS REQUIRED.
* USE WATER SAVING CRYSTALS OR SIMILAR IN DRY SOIL CONDITIONS.
BIORETENTION MAINTENANCE
* ROUTINE INSPECTION OF THE BIORETENTION PROFILE TO IDENTIFY ANY AREAS OF INCREASED
SEDIMENT DEPOSITION, SCOURING FROM STORM FLOWS, RILL EROSION OF THE BATTERS FROM
LATERAL INFLOWS, DAMAGE TO THE PROFILE FROM VEHICLES AND CLOGGING OF THE
BIORETENTION BASIN.
* ROUTINE INSPECTION OF INFLOW SYSTEMS, OVERFLOW PITS AND UNDER-DRAINS TO IDENTIFY
AND CLEAN ANY AREAS OF SCOUR, LITTER BUILD UP AND BLOCKAGES.
* REMOVAL OF SEDIMENT WHERE IT IS SMOTHERING THE BIORETENTION BASIN VEGETATION,
*TILLING OF THE BIORETENTION BASIN SURFACE IF THERE IS EVIDENCE OF CLOGGING,
* REGULAR WATERING /IRRIGATION OF VEGETATION UNTIL PLANTS ARE ESTABLISHED AND
ACTIVELY GROWING.
* REMOVAL AND MANAGEMENT OF INVASIVE WEEDS (HERBICIDES SHOULD NOT BE USED)
* REMOVAL OF PLANTS THAT HAVE DIED AND REPLACEMENT WITH PLANTS OF EQUIVALENT SIZE
AND SPECIESAS DETAILED IN THE PLANT SCHEDULE.
* PRUNING TO REMOVE DEAD OR DISEASED VEGETATION MATERIAL AND TO STIMULATE GROWTH.
Se ae A A
PLANTING FOOTING
BIQ-RETENTION PLANTING DETAILS Zone | Species Common Name Height | Form | Planting (aty/
(mn) Density m2!
ZONE LOCATION AREA PLANT DENSITY QUANTITY ‘SPECIES
(eam) daty/9qm) A | Cymbopogon refroctus Berbed Wire Grose 0.3 Tufted
Ac | Dicnsils brevipendunculate Flax tly 05 | Tufted
NAMING US GRADIENT FOR F: | ZONEA| BATTER 353 ma 2-4/6-8 1872 0 | Chania eieberania Red—tuked Saw Edge| 1.5-3| Tufted
BEER oir © | Tadlepsis nodosa ‘Knobby Club Rush 06 Tufted
fe] ZONEB| BASE $70 m2 a8 550 C \Vuneye ceitatue Common Rush O5 | ToRted
Borrow oF eas rou KT] Lepidosperma lotercie Variable Sword Edge | 0.5-1| Tufted
LAYER FOR 12 MONTHS, [33] trowe B,C | Lomandre hystrix Greek Mott Rush 10 Tufted
| DRAINAGE MEDIUM INTEGRITY ZONEC | SAS 4916-8 “e KB.GD| Lomandra tongifalio Watt Rush 7-15] Tahted
gp Minter Hs aap td 0 "| Schoenoplectua mucronatus | Cub Rush DS=1 1 Tufted
MACROPHYTE SPECIES: P|
ly ZONE D BASE 110 mz 4-816-8 138 A Themedia oustratis Kongoros Grass 0.3-0.5) Tufted
: K | Bebingtonte elmilte Twiggy Myrte 2-3 {shine
Banksic V2 ‘Shrub
Concrete Avcess Drivewe; = ("J | Bonksic robur ‘Swamp
(Overland Fow Path) ¥ ZONEE | Ase ali 4-6/6-8 188 AT eailiatemon pachyphylus Wollum Bottlabrush 7 Shrub
K] Hardenbergia viclacea Purple Coral Pea Shrub
DETAILS FOR PLANTING DENSITIES AND SPECIES REFERENCED FROM WSUD TECHNICAL folk ‘Shi
DESIGN GUIDELINES SOUTH EAST QUEENSLAND - VERSION 4 JUNE 2008 AE" | Leptespermum polygolitoium | Wid Ney rub
_! A | Melaieuce thymifolia Thyme Honey Myrtle Shrub
KE | Maestemne affine Native Lesiondre Shrub
ai A ‘Acacia sophorae Cooatal Wattle Tree 7
Tin building 3 A Collistemen viminalis Weeping Gottlebrush Tree <1
a BIO-RETENTION PLANTING RATIONALE K [Caifistemon edlignus White Bottlebrush Tree Hi
4 Pana oe ncn RGSS EDUCATORS DR PERDDEAUY PPO CROAT ORT A | Elgeosarpus cbovetve Herd Quandong Tree <t
8 AES ve cenoeen POM TED MO RASTANED AD + WUFTAIIAILE TACLITY TO PROVE THE CEPED LEVEL OF ETDmRUMA TER TREATISE A Lophostemon suaveolens ‘Swamp Box Tree <i
Tre ee creanen na eATEN is PERETEDR SEWED en en B Nach Tnarilfoli Flax Leat 7K Sato} <1
See ee ea ene a ett he xa hinas une ADH CAOWAMODOTIEAN ATER jau68 Tnariifolia jax Leaf Paporba ca
= A | Meloleuco nodosa Pickly-leafed Paparbark) 2-7 | Tree 7-4
K | Melolevca quinquemerto Broad—leated Poperbark! 8-20[ Tree <7
LANDSCAPE PLAN Operational Works - Sheet 4
7
PROECT |
PROPOSED INDUSTRIAL ESTATE - VENTURA DRIVE , NOOSA element design ai
landscape architecture .
eS owoTME LANDSCAPE PLAN - SHEET 04 OPERATIONAL WORKS “= GATEWAY RISE PTY LTD wR TunE EE :
spaneinee context _scscse Samaacs # REVERT MR ONTS = wane :
(meer tee ora comm eat Se ae eee {8 tanene Ba, wpe r on
6 2) C= J Cy CJ Ej f= Ea CO | eee
ae Co J Co Exjue fe] omen design =,
9 ED 7197 OPW-04 A]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0771 - OP Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.