Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

08/0771 - OP Works - Landscaping [As Published] · 142008.771

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: ‘n mast instances, the premises will not involve any of the
folowing characteristics, however some applications may involve one or more of these characteristics — complete only if appitcable)

Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, fake, canal)
Name of water body, watercourse or aquifer (If known)

 

 

 

Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on pian description for strategic port tand Port authority for the fot

 

 

 

Table F Complete if the premises are in tidal water
Name of local government for the tidal area (if appficable) Name of port authority for the tidal area (/f appfcable)

 

 

1.

 

 

 

 

 

3. Indicate the total area of the premises on which the development is proposed: (Note: The fofal area may include land both above and betow water)
Total area of premises (land on which the development is proposed)

- Q1S |G \Cm  Ufectares ( apptcabie uni

 

 

 

 

 

 

 

 

 

 

 

 

Existing use of the premises
4. Current use/s of the premises: (e.g. vacant and, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
NACANT LAND

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)
No o Yes ~ Ensure the type, location and dimensions of each easement are included in plans, submitted with the application

 

 

 

 

Proposal details
6. Brief description of the proposal: (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture etc.)
1 Lot SuB0wision ~ INQUSTZIAL

7. Does the proposal include new building work or operational work (including any services) on the premises?
oO No &m Yes - Ensure the nature, location and dimensions of the proposed works ara included in plans, submitted with the application

 

 

 

 

Resource entitlement (if appticable) — further information is provided in the advice section at the end of the form

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (o.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
§0 No - Goto.a9 (J Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource allocation ar
entitlement must be submitted with the application. You do not need to answer Q9 — go to the next section.
Nature of State-owned resource

TableG Nature of evidence required

Allocation/entitlement ss “a wa State Government Date of | Date of
reference number Name of authorising officer Position of authorising officer Department issue _| expiry

 

 

 

 

 

 

 

 

 

 

 

 

 

Owner's consent (if applicable) — further information is provided in the advice section at the end of the form

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and not
within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.

 

Table H Premises Owner's name/s Details of the premises owned ; * Date consent
Owner's signature’
and postal address (street address or lot on plan description) was obtained

1. Buanvags & Pro perben Qf] Lor B\ se ZN 687 Lele attacdiment \a|l2|ob
Come i ‘iow 2\G2

 

 

 

 

 

 

 

 

* Owners signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager an an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of awner’s consent are available on the IPA website .

Page 2

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0771 - OP Works - Landscaping [As Published].pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.