07/1045 MCU - Multiple Housing Type 2 Duplex -Middap Ditchfield Pty Ltd [As Published] · 132007.1045
NEeLekw we Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1. APPLICATION FORMS pled’
mpeg eiliyt frit
11 Form 4 PartA wig J
cen duet need
1.1.1. Ensure that the form is fully completed. - opel x flor vale
4.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is vray Beno
1.1.2.1. If there are multiple owners, the consent of each owner is required. go 47 hy LfA.
1.1.2.2 If the owner of the land.is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2. Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [Y]
2. REFERRAL INFORMATION ,
2.4 Ensure that items 1-23 have been checked and/or completed with regard to referrals. ; [v_]
3. ENVIRONMENTALLY RELEVANT ACTIVITIES
3.1. Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
4. FORM 2™- REQUEST TO CHANGE APPROVAL
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5. PLANS ©
§.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationat ‘
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format andis - v4
unbound.
6. SUPPORTING INFORMATION ~ . oo toon te
6.1 Ensure that at least 6 copies of any report accompanies the application 6 for Reconfiguration
and Operationa! Works). if the application is accompanied by a covering letter, ensure that it is l
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. v
7° FREY OE me an
7.1 Ensure that the application fee, as determined from the Council’ $ adopted scale of fees, Y
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. iY
S vere
of A
pret
of AL
Having completed this form and accepted the application, please deliver both to the following IDAS Application Receiving
trays:-
¢ Ifthe application is for a Material Change of Use exclusively ~AOP1's desk in the Land Use Section.
¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.
e ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
« {nall other circumstances - AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and OO NOT deliver the application tg Records.
SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 59 pages
Page 2
315 May 2007 0834-1001 Noosa Council PO Box 141 TEWANTIN Q 4565 ATTN: Manager Land Development @ Project: Multiple Housing Type 2 Duplex 15 Duke Street SUNSHINE BEACH Subject: Application for Material Change of Use RE CEIVED Dear Sir/Madam, 1 JUN 2007 HOOSA swiee oer, We attach the following for MCU Approval:- \ PCOunTE e Forms A &D, IDAS Checklist e Drawings:- 5 Copies Architectural SD 01-06 e Development Assessment Report ¢ Our Clients cheque for $2,570.00 being the appropriate application fee. Yours faithfully Peter Middap Director MIDDAP & DITCHFIELD PTY LTD ARCHITECTS LAP EE ie Wey, G Whose He, ee. eS Lea Pe oli OF SF ORY eee OF Sere: es Bee Madere Com an rie Bail: GRE S MaRdeew eet gw ME Cores Dac hare cL ats Ga Bt eo 06224 OO Og
Page 3
INDRGRATED PLANNING ACT 1897 Part A, Version 2.4, 29 May 2006
orm Application ides
+
Common details > —
eon
ye
The completion of all appficeble questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
Tequired, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 4.
Description of land 1. Street address: fncludinghouse number, street name, suburbVlocality name & postcode) (if applicable)
Hearted Hore dees ati lendie net { 15 Duke Street, Sunshine Beach 4567
SE orn ntay CR 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Aubenfer completing 2 2 omar [ NWA |
Gavelopmnert is propesed within a water or
@ vw 3. Loton plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice fo! {] Most land can be
toaetampan gv [ Lot 201 on RP 48113 ~]
feleeennert tte orttrough the | 4 The above description is for: (tick appicatie box)
However, if the tand on which the development is A (i) the land on which the developments proposed; or
the CT naa ran aeten * (2) (ii) the tand adjoining the water body or watercourse, within which the development is
watercourse) provide ~ proposed; or
edie eibsrrkepiiabiad Ci) the water body or watercourse.
® scoinrglodacert lan (fv ton Bay). 5. Shop / tenancy number: 6. Storey /tevel: 7. Total area of land: (m? or ha):
eng GI C7 des noteptytto | f | ] [ 612m? |
development is within a water body or watercourse,
SE Ee ee eles ages, __|8- Local government area in which the land is situated: (og. Esk, Hervey Bay, Woocoo et) (if applicable)
Nate: Areas below high water mark are pot within a [Noosa ‘|
focal government's area unless provided for under the
Port authority for the strategic port land or strategic port land tidal area on which the
development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
LNA
. Existing use of the land: (eg. vacant, single house, shop etc.)
| Single House J
. Proposed use of the land: (eg. 6 unit apartment building, 30 fot residential subdivision, ERA for aquacutture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
|_ Multiple Housing Type 2 Duplex ' |
. Other parts of Form 4 completed as part of this application: (eg. Part D, Part /, etc)
[ Part D |
whan a part of Form T may apply refer to Guide 1,
Applicant details 13. Applicants name: 15. Contact person:
crhenntron nerbete ne ae { Middap Ditchfield Pty Ltd | [Peter Middap |
When signing and lodging this application 14. Contact number: 16. Facsimile number/e-mail address:
Teast enn he [ 07 5474 0877 ___| [075474 0906 |
manager, any referral agency & the Chief Executive
(her appfeabt) wi ety ont ifonmaton won 17. Postal address:
ithe spucant acorns cowactprson [Cnr Mary & Thomas Streets, Noosaville Q 4566 ]
fnust be shown, 18. Signature: 19. Date:
flicoe! ee
SO [Sl05 07 |
fi] L
Page 4
INTEGRATED PLANNING AGT 1997
Part A, Version 2.4, 29 May 2006
Land owner's consent (if applicable} 20. Land owner's consent to the making of this application:
Series ae ain etoe camara yy. the Name Signature Date
written consent of the Land owners, if the application
() a material change of use, o Bomerah (Qld) Pty Ltd - BS (Adam Yes)
reconfiguration of a lot
£2) wt ond longer mark 8k win a Gi)
canal es defined under the Coesia Protecion end} Mol AULD SLO MT Ary |
Management Act 1995,0r a.
(¥) work on reil corridor land defined under the (ii)
Uo cr |
‘Section 3.8.1(2}(a) of the IPA provides that .
fendowner’s consent is net required for a mobile or (iv)
femporayERA, ff nnn nnn nen nee e eee cence cee eee ce eee ee tee denne ee ew enn n ee ee reece ee ee cee e ee ne eel eneeeceeeeecee nd
For more information refer to Guide 1, (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.4(5) of tha IPA rogues Sorcttene ot quarry material on State coastal fand under the Coastal Protection and Management Act 1995)?
resource entitlement (en
invo'e a presarbed Sie resource, EX] NO - goto 024 (J YES - go to a22
Soriano tte clon be raatiecs” 122. This application is accompanied by evidence: (dck eppfcable box)
whos evence of the remo enttement (1 @ of the allocation of, or entitlement to, the resource — attach evidence and go to Q23(v)
Refer to schedule 10 of the Infagrated Planning C1 (ii) the chief executive of the department administering the resource is satisfied the
Re ion 1998 th the f evidence i i: 7 i i} -
run rf St super " holedginy wie development is consistent with an allocation of, or entitlement to, the resource - go
ie! application.
(] (ii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23
Aatvice for completing G23 _..., | 23. Evidence of the resource entitlement
tee os Te aya fevers () Resource entitlement / authority details (vii) Official stamp of the department
Pewee im erence
Resources, Mines and Water is mandatory where the . applicable)
application Involves any water or riverine quarry (i) Name of delegated officer
Salon 329 lowe eee Cd
Section 3.2.1{5A) allows the resource manager to limit
the time the evidence may be used. Q73 (vi) must be ni ‘fi
o arctenco may be used (273 () mu (ii) Position of sessatt officer
(iv) Signature of delegated officer
(vy) Date
(vi) pe date of evidence Cea
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
‘This checklist does not apply if the appbcation requires {Yes (C1 NO - the assessment manager may refuse to accept this application on the
must be caved tr shee aplecton " grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
Ce ta rere Baa ante by deta Plan / Drawing / Report Number Title Date
Be kan dg ible sentoyorpie () $01 & SD02 Floor Plans 1 & 2 Feb 2007
notification to understand the scope ofthe proposal [fon n inner etn na rere n errr enn cc errr ee donee nee n cen n ee cere een e nner n ene b ener e nner a enced
and any potential impact. (i) $Dd3 Elevations Feb 2007
) $b04 Sections Feb 2007
(iv) SD05 Sections Feb 2007
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 4.
OFFICE USE ONLY (appficable to assessment manager's)
[Fem 7470.00 | rccmen [1-6 2007 [RMR punta He/A [REE [7907/7044 |
| Notification of Engagement of Private Certifier (Optional format)
To. Council. | have been engaged as the private certifier for the building work referred to in this application.
Date ofengagement / /
Accreditation Number:
_— Name,
Signature:
Page 5
INTEGRATED PLANNING ACT 1997 Part D, Version 2.0, 4 October 2004
Romi OacteometAppiedton = das)
Material change ofuse 3; ©
assessable against a local government's planning scheme: 3
an a,
Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a focal governments planning scheme.
Nature of the application 1. This application is for: (tick 1 or both if appticabte)
Adevelopment permit authorises (2 Preliminary approval for a material change of use of premises including conceptual
soe te hie poadapilet design for any associated works that require approval under the planning scheme (.e.
and does not authorise development to occur. Consideration of the proposal concept)
AND/OR
@ [XJ Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.
The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
theolonnascn i helralahet & [ Eastern Beaches Locality - Semi Attached Housing Zone |
application will be assessed.
3. Existing gross floor area: (itappfcable) [200 sq.m Dwelling to be demolished |
4. Are there any existing easements on the land?
no
(71 YES - attach plans of the focation and details of the purpose of the easement
5. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
vacant land to industry (tyre manufacturing) etc.)
| Single Residence to Multiple Housing Type 2 Duplex ‘|
6. Number of employees: | NA |
7. Qperating days and hours: | N/A |
Se arenes Ja, Sie cove
iotthec ten :
planning scheme 9. Gross floor area: 274.54 sq.m
against which the application will be
assessed,
10. Number of on-site car parking spaces: [ 5 |
11. Number of storeys / maximum height above natura! ground: 8.0m / 2 Storeys
12. Number of employees N/A
13. Hours and days the use willoperate [NIA |
Associated operational works details | 14. Details of associated operational works (eg. fandscaping, cut and fil drainage, road works etc.)
(if applicable) = -
| Landscaping, cut & fill, driveways |
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY {applicable to assessment manager)
REFERENCE
DATE RECEIVED NUMBERIS
Page 6
© INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Aprit 2007
Fom 1 Oavepment Apeitection — _ tas
IDAS Assessme
Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS: NOT \
1. This checklist was formerty referred to as the “Refarrats Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to € to this document'as the
“Referrals Checktis’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function. .
2. Under the IPA and IDAS framework, an application may require assessment by the local Councit and/or certain Queensland State entities (e.g, Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires assesament by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
Itis the responsibility of the applicant to accurately complete this checklist.
Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005,
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?,
9, — To assist you in answering the following questions a series of guides are available free from the IPA website www, ipa qid.goy.au. Guide 25 explains the rote of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006,
Wh
- 1 JUN 2007
ROM
ood
PSNOar
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006,
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For more information refer to Guide 4, CJ (an environmentally refevant activity (ERA) for which a code for environmental compliance
the evpoaion muvee tec nat ene a, has not been made - complete Part G of Form 1
ministering authority’. (fii) a mobile or temporary ERA for which a code of environmental compliance has not been
{fan entity, other than the administering made - complete Part G of Form 1
authority, is the assessment manager for the & (iii) none of the above
application, the administering authority is a
concurrence agency for the application in relation
to this matter.
Note: An application involving ERA 19 and/or 20
will also require completion of Part Ky of Form 1
for approval where an allocation under the Water|
Act 2000 is required.
Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checkiist (if applicable).
OFFICE USE ONLY (appiicatie to assessment manager)
DATE RECEIVED | _ REFERENCE NUMBERS |
1 The assessment manager is responsible for assessing and deciding an IDAS applicalion. The assessment manager for an ‘application is prescribed in schedule 8A of the IPA.
2 For addtional information refer to Guide 6 ‘Does my application trigger the referral coordination process?”
3 The ‘administering authority’ may be eilher the Environmental Protection Agency, Ihe relevant local government (for a devolved ERA} of the Queenstand Department of Primary Industries and
Fisheries (for 2 delegated ERA).
Page 1
Page 7
“INTEGRATED PLANNING ACT 1997
State-controlled road matters
For more information refer to Guide 3.
Untess you answered “none of the above” to Q2,
the application triggers referral to the Department
of Main Roads (OMR) as a referral agency.
In certain circumstances OMR will be an advice
agency, while in other circumstances OMR will
2.
IDAS Assessment Checklist, Version 20, 2 Apri! 2007
The application involves: (tick applicable box/es)
(1 @ development on land contiguous to a State controlled road and for -
1 (@) material change of use assessable against the planning scheme;
(1 (0) reconfiguring a lot unless -
« the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlied road is not increased;
peter 2 af the IF Resuleson wil assist you t C1 (©) operational work (not associated with @ material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}-
associated with accass to a State-controlled road; or
for filling or excavation; or
« involving the redirection or intensification of site stormwater from the fand, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
{X] (ii) development on land not contiguous to a State-controlled road and -
&] (a) material change of use -
« assessable against the local government’s planning scheme; and
* mentioned in schedule 5 of the iP Regulation and exceeding the thresholds set by
that schedule;
(LO (») reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1) (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b} above)-
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
(1 (ili) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. ; & (i) material change of use -
Unless ered “none of the above” to Q3, . .
th eppfeaton reqs eosessment by the (a) assessable against the planning scheme;
Dende Narn Rance cn Wet (b) ona let containing -
tan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is @ + if there is no property map of assessable vegetation for the lot - remnant vegetation;
opcurrence agency forthe plication in relation (c)_ where the existing use of the land is a rural or environmental use; and
if you ticked 039 or (i), your application requires (d)_ where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardiess of OO qi) reconfiguring a fot -
whether vegetation clearing is proposed or not. we
(a) on a lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger,
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
C1 (ii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1 .
(J (iv) none of the above.
Strategic port land 4. The application involves:
For more information refer to Guide 11.
Mf you ticked (j) - the retevant Port Authority is the
@ssessment manager for the appiication.
If you ticked {i} Queenstand Transport is a
concurrence agency for the application.
(1 @) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - comptete Part I of Form 1
0 Gi) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1
(ill) none of the above
4 Land contiguous to 2 State-controlied road s defined in schedule 14 of the iP Reguiation to mean land - if part of the Landis within 100m of the State-controlied road, or that is part of a future State-
controled road.
Page2
Page 8
* INTEGRATED PLANNING ACT 1997
Acid sulfate sols
For more information refer to Guide 10,
Unless you answered “none of the above” to 05,
the application requres assessment by
Department of Natural Resources and Water
(NRW).
Hf an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.
Major hazard facilities or possible
major hazard facilities
For more information refer to Guide 17.
If you answered “YES” to Q6, the application
requires assessment by the Department of
Emergency Services (DES).
ff an agency other than DES 6 the assessment
manager for the application, DES is a
concurrence agency for the application in
relation to this matter.
Water related development under the
Water Act 2000
For more information about items (a) - (f}, refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my application
Invowe assessment of a referable dam?
Untess you answered “none of the above” to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
tf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
Felation to this matter.
Removal of quarry material from a 8.
watercourse
For more information refer to Guide 16.
Ifyou answered “YES" to Q8, the application
requires assessment by the Department of
Natural Resources snd Water (NRW).
If an agency other than NRW is the assessment
manager for the appfication, NRW is 2
concurrence agency for the application in
relation to this matter.
Note: Part G of Form 1 is required fo be
completed as the activity of removing quary
material from a watercourse is also an
Environmentally Relevant Activity (ERA).
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identified® local government area
and where the surface of the land is: (tick applicable box)
(1 (i) below 20m AHD® and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or
(CO Gi) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material
£1 (iii) none of the above
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
{No
(C1 YES - complete Part L of Form 1
The application involves:
(1A) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)
(2) ina watercourse, lake or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Ke, Ks, Ke, Ks, or Ko of Form 4 whichever is applicable;
(C1 (>) for an artesian bore anywhere in the State, no matter what the use - complete Part
Kt of Form 1;
Ci (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
US®@ - complete Part K; of Form 1;
(0 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Kx of Form 1;
(1 €e) for taking overland flow water in certain areas covered by a water resource plan
- complete Part Ks of Form 1;
(CJ (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kro of Form t
(1 @) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
[XJ (ii) none of the above.
Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?
NO
(71 YES - complete Parts Ky and G of Form 1
The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Surdekin, Burke, Bumett, Cabootture, Cains, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Codtoola, Doungias, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirtum Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redand, Rockhampton, Sarina, Thutingowa, Tiaro, Torres, Townsville, Whitsunday.
6 Austratian Height Datum (AHD).
7 The declared ground water areas are sted in Guide 13 Deyelgoment in a dectared catchment area.
8 Referable dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA.
Page3
Page 9
+ INTEGRATED PLANNING ACT 1997 Operational work that is tidal work or work in coastal management district For more information refer to Guide 18. For more information about presorbed tidat work in focal government tidal areas refer to Guide 24, Unless you answered “none of the above” to Q9, the application requires assessment by the Environmental Protection Agency (EPA). 9. (DAS Assessment Checklist, Version 20, 2 April 2007 The application involves operational work that is: (tick the applicable box/es) oO oi Diy idal work'° as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; oF tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; oF canied out within a coastal management district under the Coastal Act and for - complete Part M of Form 1 if any bowes (a) to (i) below are ticked. fen agency other Man EPA'S the assessment [J (a) constructing or installing works in a watercourse between MHWS and HAT (ie. manager for the application, EPA a other than those works in tidal water) Where the development has been determined not Sanaarrenta agency fr the application in to be assessable against the Water Act 2000; Local government is the assessment manager (1) constructing a cana!'? intended to be connected to tidal waters; for all prescribed tidal work. . a (1 ©) constructing an artificial waterway; [@) reclaiming land under tidal water, [-] (e) disposing of dredge spoil or other sofid waste material in tidal water, (1 (f) interfering with quarry material on State coastal land above high-water mark; [1g) draining or allowing drainage or flow of water or other matter across State coastal land above high-water mark; (1 (h) removing or interfering with coastal dunes on land, other than State coastat land, that is in an erosion prone area and above high-water mark; (C1@)__ constructing a bank or bund wall to establish a ponded pasture on tand, other than State coastal land, above high-water mark; or (1 (iv) none of the above. Operational work below high water | 10. The application involves operational work that is: ( tick the applicable boxes) mark For more information refer to Guide 18. For more information about prescribed tidal work in local government tidal areas refer to Guide 24. Untess you answered “none of the above” to Q10, tha apphcation triggers referral to jeenstand Trans Qid} as a concurrence agency. Local government is the assessment manager for all prescribed tidal work. Coastal management For more information refer to Guide 18. Unless you answered “none of the above" to Q11, the application requires assessment by the Environmental Protection Agency (EPA). if an agency other than EPA is the assessment manager for the application, EPA is a concurrence agency for the appfication in relation to this matter. 11. ow tidal work" as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or LD (i) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; or C1 (ii) carried out within a coastal management district'S under the Coastal Act and for - div) [1 @) disposing of dredge spoil or other solid waste material in tidal water - complete Part MofForm 1; reclaiming land under tidal water ~ complete Part M of Form 1; or Cb) C1 (©) constructing a canal'2, if the canal is associated with reconfiguring a lot - complete Part M of Form 1; none of the above. The application involves: (tick the applicable boxes) OW Oi Odi) Ow) Kl) a material change of use assessable under a planning scheme involving operational work carried out completely or partly in a coastal management district’ a material change of use assessable under a planning scheme involving building work, carried out completely or partly in a coastal management district that is - « the construction of a new premises with a GFA'® of at least 1000m2 « the enlargement of the GFA of existing premises by more than 1000m2 reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated completely or partly in a coastal management district reconfiguring a lot” assessable under schedule 8 of the IPA and in connection with the construction of a canal! - complete Part M of Form 1 none of the above 10 Tidal work is defined in sch 10 of the IPA, 11 Prescribed tidal work is defined in the Coastal Protection and Management Reguiation 2003 and includes certain tidal works completely or partly within @ local government tidal area, 12 Canal means canal as défined under the Coastal Protection and Management Act 1995 13 Tidal work is defined in sch 10 of the IPA, 14 Prescribed tidal work is defined in the Coastaf Protection and Management Regulation 2003 and includes certain tidel works completely or partly within a focal government tidal area. 15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a Coastal management district under section 47(2) of that Act. 16 GFA ts defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed. 17 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the seconfiguration is associated with the construction of an artificial waterway, must be accompanied by the application for ihe aperational works to construct ihe artificial waterway. Page 4
Page 10
* INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24,
If you answered “YES” to Q12, the application
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
development is -
© within 200m of a shipping channel or an entry
and exit shipping corridor for the port
® within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
» within 1000m of a planned port facility
identified in a and use plan approved under
the Transport Infrastructure Act 1994,
{n all other situation the Port Authority is an
advice agency.
IDAS A nent Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark’® and within the limits of a port
under the Transport infrastructure Act 19947
{No
[11 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Marinas
For more information refer to Guide 18. For
information ebout whether @ marina is prescribed
tidal work refer to Guide 24. The local
government is the assessment manager for all
prescribed tidal work.
lf you enswered "YES" to Q13, the application
triggers referral to Queenstand Fire and Rescue
Service as an advice agency.
Tidal works in strategic port land tidat
areas
For more information refer to Guide 18,
Unless you answered "NO" to Q14, the relevant
Port Authority is the assessment manager for the
eppication and the Environmental Protection
Agency (EPA) and Queenstand Transport (QT)
‘are concurrence agencies for the application.
Heritage
For further information refer to Guide 49.
If you answered "YES" to Q15, the application
triggers referret to the Queenstand Heritage
Council as concurrance agency for the
application.
Unless you answered “none of the above” to
13.
=
15.
4,
Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?
KINo
{7 YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work
Ooes the application involve tidal works within a strategic port land tidal area20?
BJ No
(YES -complete Part M of Form 1
Does the appfication involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
No
(7 YES - complete Part C of Form 1
15(b) The application involves: (tick applicable boxes)
Q15(b), the application involves referral to the C1 () — amaterial change of use assessable against the planning scheme and the lot shares a
Environmental Protection Agency as an advice common boundary with a protected area or registered place under the Queensland
agency for the eppicaton Heritage Act 1992;
(J (i) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
1 (iii) none of the above.
Declared catchment aress 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including a lst of the
dectared catchment areas within Queenstand,
tefer to Guide 13.
Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
Hf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
involves: (tick the applicable box/es)
(OQ) _ reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
C1(ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
[1 (iii) none of the above
48 High water mark is defined in the Coasta! Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
19 Marina is defined in the Transport Operations (Maritime Polution) Regulation 1998.
20 Strategic port land tidal areas ate the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page S
Page 11
» INTEGRATED PLANNING ACT 1997
IDAS A: ment Checklist, Version 20, 2 April 2007
Contaminated land 17. The application involves: (tick the applicable bowes)
Applications involving material change of use (2 @ reconfiguring a fot for which all of part of the premises are —
nfguring a tot may trigger thi
er nao etmay Mage (a) premises mentioned in the IPA, schedule 8, part 1, table 2-
For more information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered ‘none of the above” to « item 6, including the exemption otherwise provided for by paragraph (e); or
Q17, the appiication requires assessment by the ei it i i i i init r
Ewironre tal mn Agenty (EPAY Hon item 7, including the exemption otherwise provided for a mining activity or petroleum
agency other than EPA is the assessment activity, or . . .
manager for the apptication, EPA will be a (b)_ inan area for which an area management advice has been given for unexploded
ce for the application i
rebtonte the rete ehivaton ; ordnance - complete Part N of Form 1
Oi) a materia change of use —
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if ail or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
EX Gi) none of the above
Electricity infrastructure 18. The application involves: (tick the eppticable box/es)
Far more information refer to schedule ofthe [P (1@) reconfiguring a fot where any part of the lot is -
Unless you ensw ered *none of the above" to « subject to an easement in favour of a distribution entity or transmission entity under the
18, the application triggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under
‘agency to which the easement is aranted in that Act; or
fayour of as advice agency. « situated within 100m of a substation site;
LU Gi) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
« any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
C1 (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
LC (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;
[XJ (v)_ none of the above.
Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure
Applications invotving development on fand
designated for community infrastructure may
trigger this referral.
For more information refer to schedule 2 of the
IP. lation.
If you answered “YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
\fan agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter,
designated for community infrastructure?
{i) intended to be supplied by a public sector entity; and
(li) on land not owned by or on behalf of the State; and
{iii) other than development —
(a) for the designated purpose; or
(b) carried out by, or on behalf of, the designator.
NO
CU Yes
Page 6
Page 12
“. INTEGRATED PLANNING ACT 1997 SEQ Regional Plan For more information refer to schedule 2 of the 1P Regulation Refer to Chapter 2, part 5A and schedule 10 of the integrated Pianning Act 1997, and schedule 2 of the Regulatory Provisions for relevant definitions, Unies you answered “none of the above™ to Q20, the application requires assessment by the Office of Urban Management (OUM). Fisheries matters For more information refer to schedule 2of the IP Reaulation. Unless you answered “none of the above” to Q21, the application requires assessment by the Department of Primary Industries and Fisheries (DPI&F), \fan agency other than DPI&F is the assessment manager for the application, DPI&F is a concurrence agency for the application in relation to items (i) - (rv) and an advice agency in relation to item (v). IDAS Assessment Checklist, Version 20, 2 April 2007 20. The application involves (tick applicable boxes) - C1 i) a material change of use of premises - (a) __ in a Major Development Area in the Urban Footprint for - 00 @ anurban activity - (1 inan area included in a structure plan where the IPA, section 3.1.6 applies; (1 inan area net included in a structure plan where - « the IPA, section 3.1.6 applies to the application for the material change of use; or the premises exceeds 10,000m2; or « the gross floor area (GFA) on the premises will exceed 10,000m2; or « impact assessment is required under the retevant planning scheme OO (i) intensive animal husbandry, or (2 (ii) residential development involving a rural residential purpose (b) in the Regional Landscape and Rural Production Area for - OO @ anurban activity and not specified in section 2.4(2); or C1 (i) residential development involving a rural residential purpose and not specified in section 2.6(2) (c) in the Rural Living Area for an urban activity and not specified in section 2.8(2); (d) in the Investigation Area for - 0 (i) anurban activity and not specified in section 2.10(2); (1 (i) residential development involving a rural residential purpose and not specified in section 2.12(2); or (1 (ii) Intensive animal husbandry C1 (ii) reconfiguring a fot- On land in a Major Development Area in the Urban Footprint that is: (a) not included in a structure plan; and (b) not specified in section 3.1(2). Ed (ii) none of the above 21. The application involves: (tick the applicable boxes) [1() anassessable material change of use for aquaculture - complete Pat 01 of Form 1; CU (ii) assessable operational work that is the construction or raising of a waterway barrier - complete Part Os of Form 1; Lili) assessable operational work completely or partly within a declared fish habitat area- complete Part Oz of Form 1; C1 (iv) assessable operational work that is the removal, destruction or damage of a marine plant - complete Part O, of Form 1; [1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a declared fish habitat area; [1 (vi) none of the above. Page7
Page 13
L INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Regulation,
Unless you answered “none of the above", the
application triggers referral to QT as a
IDAS nent Checklist, Version 20, 2 April 2007
22. The application involves: (tck the applicable bowes)—
(J) (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
concurrence agency. D1 (ii) reconfiguring a tot—
Cifa) on land thatis completely or partly within a public transport corridor, and the
total number of lots increases;
(1b) _ on land thatis completely or partly within a future public transport corridor or
an airport's public safety area;
C1 (©) ontand that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater,
C(¢) _ for a residential purpose within the 25 ANEF contour for an airport:
[1 (e) _ for a residential purpose resulting in 100 or more allotments.
CO (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
[1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor,
(1) (&) _ will resutt in work that encroaches into an airport's operational airspace.
EX] {iv) none of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guide 23, schedule
8A of the IPA & scheduls 2 of the IP Regutation.
Unless you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.
Moonie to Brisbane pipeline
For more information refer to schedule 2of the IP.
Reguiation.
Untess you answered “none of the above’, the
application triggers referral to the holder of
Pipeline licence No 1 issued under the Petroleum|
Act 1923, currently Santos QNT Pty Ltd, for
advice.
(1 @ a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
0 (il) reconfiguring a fot—
C1 (@) cn land thatis completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
[1 (b) on land thatis within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater,
Ce) on land that abuts rail corridor land, commercial corridor land or future raihvay
land, and the total number of lots increases;
(J) on Jand that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(J) ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
[1 _ fora residential purpose resutting in 100 or more allotments.
(7) (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m®, on land that—
(1 (@) __ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (6) _ is completely or partly within future raitway land, or a railway tunnel easement
(1) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
{X (iv) none of the above.
24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es}—
(1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement
O1 (ii) reconfiguring a lot
(] (ii) operational work assessabie against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
1X] (iv) none of the above.
Page &
Page 14
+” INTEGRATED PLANNING ACT 1997 Koala habitat area For more information, refer to Guide 26 and schedule 2 of the IP Regulation. Unless you enswered “none of the above’, the application requires referral to the Environmental Protection Agency es a concurrence agency. Wild river area Fer more information, refer to Guide 27 Ifyou answered YES to Q26, you must also complete section 2 of this checklist. This wil enable you to determine @ your application can proceed in a wild river area and which referral agency will assess your application against the Wild Rivers Code, or if the proposed development is “prohibited” in @ wid river area. Note: Development can be ‘prohibited in a wild river area because the application cannot be IDAS Assessment Checklist, Version 20, 2 April 2007 25. The application involves: (tick the applicable box/es)— DO (i) a material change of use of premises in a koala conservation area or koala sustainability area made assessable under a planning scheme, that is not for a domestic activity and will result in - (1 @@) clearing of native vegetation over an area greater than 2500m?; (1b) anew building and any reasonably associated structure with a total footprint greater than 1000m2; C1) anextensicn to an existing building and any reasonably associated structure if the extension has a total footprint greater than 1000m2; () (d)_ extracting gravel, rock or sand from an area greater than 5000m?; (1 (e) excavating or filling an area greater than 5000m?, (1) () additional traffic in a koala conservation area or koala sustainability area, between 6p.m. on a day and 6a.m. on the following day. (Gi) reconfiguring a fot in a koala conservation area or koala sustainability area that will result in - (J (a) an increased number of lots; ()(b) clearing of native vegetation over an area greater than 2500m?. C (ii) operational work in a koala conservation area or koala sustainability area made assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation over an area greater than 2500m?. (1 (iv) operational work in a koala conservation area or koala sustainability area made assessable under a planning scheme (not associated with a material change of use mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity and will result in - (1 (a) clearing of native vegetation over an area greater than 2500m?, [1 (b) extracting gravel, rock or sand from an area greater than 5000m?, 1) excavating or filling an area greater than 5000m?. [I (v) none of the above. 26. Does the application involve development in a wild river area declared under the Wild Rivers Act 2005? &INO ves accepted by the assessment manager, Preliminary Approval 27. Does the application involve a development for which preliminary approval is sought under Ifyou answered YES to Q27, the application Section 3.1.6 of the Integrated Planning Act 1997? triggers referral to the Department of Local Government, Plenning, Sport nd Recreation es | EXINO an advica agency. 0 YES Wetlands Domestic activity meens the construction or use ofa single residence on @ kot and any reasonably associated building or structure. Examples of a building or structure that could be reasonably associated with a single residence include: caretaker's residence, granny flat, building or structure used for a home business. Note: Wettand is defined in the integrated Planning Requtation 1998. Unless you answered “none of the above” to 028, the application involves referrat to the Environmental Protection Agency as an advice ‘agency for the application. 28. The application involves: (tick the applicable boxes) - (14) a material change of use, other than for a domestic activity, assessable against the planning scheme that is in or within 100m of a wetland; (1 (i) _ reconfiguring a lot - In or within 100m of a wetland that will result in (1 (a) more than 10 lots being created; or LO (b) lots less than 5 hectares; £1 (iii) none of the above Page
Page 15
a +” INTEGRATED PLANNING ACT 1997 Conservation Estate Urban purposes is defined in the Integrated Planning Act 1997 as “purposes for which tend is used in cites or towns, including residential, industriel, sporting, recreation and commercial Purposes, but not including environmental, conservation, rural, natural or widemess area Purposes”, Unless you answered “none of the above” to Q29, the application involves referral to the Environmental Protection Agency as an advice agency for the application. IDAS Assessment Checklist, Version 20, 2 Aprit 2007 29. The application involves: (tick the applicable box/es)— (1@) a material change of use for urban purposes that is in or within 100m of any of the following - Ci (a) a protected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992;; (J (b) a State forest or timber reserve under the Forestry Act 1959; [1 (©) amarine park under the Marine Parks Act 2004: Cd) arecreation area under the Recreation Area Management Act 1988; Ci (e) aworld heritage area fisted under the World Heritage Convention: (1) Brisbane forest park under the Brisbane Forest Park Act 1977. (1 @ii) reconfiguring a lot if - C1 @) any part of the lotis situated in, or within 100m of, any of the following - C1() a protected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992; (qi) a State forest or timber reserve under the Forestry Act 1959; OO (ii) a marine park under the Marine Parks Act 2004; LI (iv) arecreation area under the Recreation Area Management Act 1988; CO) — aworld heritage area listed under the World Heritage Convention; Brisbane forest park under the Brisbane Forest Park Act 1977; and (J (b) the reconfiguration involves more than 10 lots being created, or any lot resulting from the reconfiguring is less than 5ha; & (ii) none of the above. Page 10
Page 16
DEVELOPMENT ASSESSMENT REPORT MATERIAL CHANGE OF USE TO DUPLEX LOT 201 RP 48413 Parish Weyba, County March on behalf of BOMERAH PTY LTD June 2007 Applicant MIDDAP DITCHFIELD PIL CNR MARY THOMAS STREETS NOOSAVILLE
Page 17
Page 1 CONTENTS 4. Executive Summary uu... esce cscs ssascsesessenseaseaaeaeseeseeeseaeessansseeeeaesesaneenaees 2 1.1. Site Details... eee ceeeeeneeeseceeeeeeeeeseeeenseeeeseaeeeeesaeesesssecccssesestssseseneresensies 2 1.2 Application Details 20.0.0. ceeneeceeeeee eee ceeeeeseeeeesseessesceceeseceenseteeeniresensaes 2 2. IMtrOGUCTION 00... e ete eceneenenecneseneensaeeeseatcnaacceceesesuaeenecensaeeeeeseeeessssenreces 3 3. Site & Surrounding Characteristics... cesesesccessceeeseseeessseeesseeeeseereese 4 3.1 Site Description... eee eececeececeeseeceeseeeetsseeceesseeeesseeecssssescsseesensseerensueseees 4 3.2 Surrounding Development. ................e.ceeccecceceeee cee ceeeeeeeeeceseeetatecseeesstensasessensnese 4 4. Proposal Description 2.0... ee cccssseeeesessceeesesscseeeeesscsseceeecenssnseeeesavsesseanen 4 5. Planning Framework........cccccscsssecsseseseeseesenseseenseessaeseseesaeeeseesensesseeesanesaneaseness 4 5.1 The Noosa Plan oo... cc ccceccccecsecssceeeeseeeesseeseseeeesasescesseeecseecessseecerseesennssesensresenss 5 6. Planning ASSeSsSMent............ ce eeeeceeeeseseceeetessaseeeseeessseeseceeeseceeeeteassneusenastesses 5 6.1. Codes and Planning Scheme Policies .............ccccccccccccseceeesscecsenscccensseceenseeeenes 5 6.2 Eastern Beaches Locality Code ......... 5 6.3 Residential Uses Code.............. 14 6.4 Landscaping Code... .15 6.5 Driveways and Carparking Code.............00...000..00 .20 6.6 Earthworks Code oi. ceceececessneeesseeeeeteeeeeeee .23 6.7 Erosion and Sediment Control Code.. 25 6.8 Existing Services Code... 26 6.9 Transport, Roads and Drainage Code... cccccecseccecssseecesseeveseserneseusetenes 27 6.10 Waste Managment Code 0.00.0... cece ccc cceccceeesseeeeesseecenseseecsssesersaversasersues 32 6.11 Water Sensitive Design Code oe .35 6.12 Water Supply & Sewerage Reticulation Code 2.0.0.0... ceesccecesscceessseseseeene 36 TZ. COMCIUSION L000... ceeececetcenessneeeeseeesceeeeeeeeseceeeenesseesteeseeaeceeessesceeeeensesunaeesenseeens 38 ATTACHMENTS Attachment 1 Proposal Plans Material Change of Use Bomerah Pty Ltd 15 Duke Street, Sunshine Beach June 2007
Page 18
1. EXECUTIVE SUMMARY 1.1 Site Details Page 2 Sa : — Address 15 Duke Street, Sunshine Beach Contact Peter Middap Middap Ditchfield Architects Cnr Mary & Thomas Streets NOOSAVILLE QLD 4566 Phone: 5474 0877 Fax: 5474 0906 Email: [email protected] Property Owner Bomerah Pty Ltd Location Sunshine Beach RPD (Subject Land) Lot 201 RP 48113 Subject Land Area 612m? Local Authority Noosa Shire Council Current Use Residential Uses 1.2 Application Details Neier OPCS Application Type Material Change of Use to Residential Housing - Multiple Housing Type 2 Duplex Planning Classification (planning area, precinct class etc) Planning Area - Eastern Beaches Locality Zone - Semi Attached Housing Overlays: Part 7 Eastern Beaches Locality Level of Assessment Code Assessable Referral Agencies Nit Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 19
Page 3 2. INTRODUCTION This report has been prepared on behalf of Bomerah Pty Ltd in support of a Development Application for a Development Permit for a Material Change of use of premises to allow for Multiple Housing Type 2 Duplex The subject land is situated at Lot 201 RP 48113, 15 Duke Street, Sunshine Beach. The proposal plans are shown at Attachment 1. The report concludes with the recommendation that Council approval is warranted subject to reasonable and relevant conditions. Material Change of Use Bomerah Pty Ltd 15 Duke Street, Sunshine Beach June 2007
Page 20
Page 4 3. SITE & SURROUNDING CHARACTERISTICS 3.1 Site Description The subject land is described as Lot 201 RP 48113, 15 Duke Street, Sunshine Beach. and contains an area of 612m?. The site currently contains a building occupied by a single residence. Vehicular access to the site is currently via an entrance off Duke Street. Existing vegetation to the front is not significant and will be removed for the development. The rear of the site is very steep (1:3) where existing vegetation will be kept where undisturbed by cuts and enhanced so as to disturb the dune as little as possible. Trees on the southern boundary are to remain. 3.2 Surrounding Development The surround development is generally duplex dwellings and units to the south and single detached housing to the north. 4. | PROPOSAL DESCRIPTION The proposal is for the demolition of the existing building and the erection of a new 2 storey duplex development with some basement area. Proposed Uses Each unit in the duplex will be separately titled and designed for permanent living. Design The proposal is to construct a two storey duplex which steps up the site just under the maximum permitted height of 8.0m. It will be finished in a combination of rendered block and off form concrete with timber and light weight panelling to the upper level. The roof form is a low pitch with overhangs but is broken in its form to reduce the impact of the building to it's neighbours. Sunshine Beach is not dominated by any one architectural style and the proposed development is designed to compliment the already rich diversity of styles in the area but maintain the scale and landscaped character of the area. The style is typical of South East Queensland sub-tropical design. The building will be of a modern design with flat roofs stepped down the hill. The extensive glazing combined with the modern materials will blend in well with the range of designs, styles and materials within Eastern Beaches Locality. Access and Car Parking Vehicular access to the site will be from Duke Street which will be narrowed slightly to be 3.6 metres wide. This access will provide both the entry and exit to/from the site. Parking for 5 vehicles is proposed. This consists of 4 garaged and 1 visitor park. There is a turning bay on site so vehicles leave in a forward direction. 5. PLANNING FRAMEWORK Material Change of Use Bomerah Pty Ltd 15 Duke Street, Sunshine Beach June 2007
Page 21
Page 5 5.1. The Noosa Plan The Noosa Plan commenced on 3% February 2006 and is the relevant planning scheme for the area. Within this plan, the site is located in the Eastern Beaches Locality, and in the Semi-Attached Housing Zone. The proposed uses are consistent with the Semi-Attached Housing Zone. 6. PLANNING ASSESSMENT 6.1. Codes and Planning Scheme Policies The Codes applicable to this proposal, as contained in the Noosa Plan are as follows: e Eastern Beaches Locality Code e Semi-Attached HousingCode Residential Uses Code e Landscape Code « Engineering Works Code The site is also washed over by an Overlay which identifies the site as subject to Natural Hazards: Landslide & Flooding. However, a geotechnical engineer will be engaged to design the structures appropriately for the site. Our assessment of the application against each of these relevant codes is set out below. 6.2 Eastern Beaches Locality Code Development complies with the Eastem Beaches Locality Code if it: (a) fulfils the Specific Outcomes for the locality; and (b) is a consistent use and fulfils the specific outcomes for the Semi-Attached Housing Zone. (a) Specific Qutcomes and Probable Solutions for the Eastern Beaches Locality BS) 71.) 011: eS Sc SRL Oe SLUT EE Ur a ed 7.9 Effects of Use Amenity O7 Uses are located, designed and operated to | No solution provided ¥ The proposal is for a avoid significant adverse changes to the light, air residential use and is quality, noise, accessibility or other conditions surrounded by similar uses. It enjoyed by users of associated, adjoining or will therefore have no adverse nearby uses. effects on these properties. Character and function of the David Low Way 02 The vegetated character of the David Low No solution provided v NIA Way is protected and new development recognises and protects the function, capacity and efficiency of the David Low Way as the major north — south link throughout the coastal part of the shire. 12.10 Built form Density v The density of development 03 The density of development within the site No solution provided is consistent in scale with area— surrounding development. a) is compatible with surrounding development, b) does not exceed— ..li for Semi-Attached Housing Zone “has 2 x 3 bedroom units (6.6 B. for sites between 600m2 or_more — persons) Material Change of Use Bomerah Pty Ltd 15 Duke Street, Sunshine Beach June 2007
Page 22
Page 6 6.6 persons, with the exception of the following sites which have and allowable population density of 320 person per hectare exclusively for the purpose of a visitor hostel - * — Lot 295 on RP883860 at 14 Duke Street, Sunshine Beach; e Lots 339-341 on RP48111 at 1-3 Douglas Street, Sunshine Beach; e Lots 92 - 94 on RP94566, at the corner of Wildflower and Hill Streets, Sunshine Beach; and e Lots 8, 9 & 10 on P9315 and Lot 76 on MCH2969 at 215 - 219 David Low Way, Peregian Beach c) has a low site impact to enhance the opportunity to maintain natural site characteristics, including native vegetation and natural landforms. “has low impact, maintaining the landforms and will be landscaped to enhance the existing native vegetation. Height 04 Buildings and other structures— a) are low rise and present a building height consistent with structures on adjoining and surrounding land; b) do not exceed a maximum height of - iii, For any other zone — 2 storeys c) do not visually dominate the street, adjacent properties surrounding spaces or the existing skyline; d) preserve the amenity of surrounding land including access to sunlight; e) respect the scale of surrounding vegetation; and $4.1 Buildings and other structures have a maximum height of- e) in all other zones - 8m ¥ The proposal has a maximum height of 80 metres and two storeys. Unit 2 contains a basement which generally complies with the definition. A small area of three storey exists but this is not visible from outside the building and does not increase the visual bulk and remains under 8.0m above natural ground. All levels and heights comply at the extremities of the building. Setbacks 05 Buildings and other structures are appropriately designed and sited to— a) provide amenity for users of the premises as well as preserve the visual and acoustic privacy of adjoining and nearby properties; b) provide adequate distance from adjoining uses; c) preserve any existing vegetation that will buffer the proposed buildings; d) allow for landscaping to be provided between builidings e) maintain the visual continuity and pattern of buildings and landscape elements within the street; f} protect the natural character and visual amenity of the beachfront $5.1 Buildings and structures comply with the minimum building setbacks specified in Schedule 1 - Minimum Boundary Setbacks. ¥The proposal complies with the standard minimum setback requirement except:- - parts of the roof overhang encroach a maximum of 600 into the side setbacks and - the entry doors have a roof Structure at the lower level which is 2.4m above ground, 2.4m long and encroaches to within 900 of the side boundary. The existing vegetation in the setback to the SW will be retained and enhanced where not disturbed by construction. The side and road setbacks will be planted in accordance with the landscape code. Site cover, gross floor area and plot ratio O6 The site cover, gross floor area and plot ratio of buildings and other roofed structures— a) results in a building scale that is compatible with surrounding development; No solution provided “The proposal complies with a,b,c,d & e — refer to drawings for detail . Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 23
Page 7 b) does not present an appearance of bulk to adjacent properties, roads or other areas in the vicinity of the site; c) maximises the retention of existing vegetation and allows for additional soft landscaping between buildings; d) allows for adequate area at ground level for outdoor recreation, entertainment, clothes drying and other site facilities; and €) facilitates onsite stormwater management and vehicular access. 07 Site cover does not exceed- Site cover is 39.1% b) for Semi-Attached Housing Zone - 40% 08 For Mulitple Housing Type 2 buildings have The plot ratio is 0.449 : 4 a maximum plot ratio of - c} 0.45:1 09 010 For the Detached Housing Zone and Semi- Soft landscaping is 39% Attached Housing Zone — soft landscaping is provided and retained over a minimum of 20% of the site area. 011 Flooding and Drainage 012 Buildings and other works are designed and | $12.1 Floor levels for ¥ NA. sited to— habitable rooms a) provide flood free access to premises and are— flood free habitable areas; a) for areas where minimum b} allow only minor, short term and infrequent floor levels are available— flooding of non-habitable areas; not less than the specified c) ensure drainage does not adversely impact level; upon other premises; and b) for areas where flood d) ensure filling or excavation does not modelling is available—a adversely impact upon other premises by— minimum of 500mm above i, causing ponding of water on the site or the modelled flood level; and nearby land; c) for areas where flood ii. increasing flooding, which adversely modelling is not available, a L. affects the safety or use of any land minimum of 500mm above cond upstream and downstream; and the highest known flood Le ili. adversely affecting the flow of water in level; ste any overland flow path. AND / $12.2 Where Council infrastructure is available— a) any drainage (from buildings and land) flows to that infrastructure; and b) the infrastructure has the capacity to accept any additional loading; Roof form 013 Roof forms— $13.1 The main roof of the ¥ The proposed development a) contribute positively to the focal skyline; building has a roof pitch no has a roof pitch of 1° The b) complement the low density character of the less than 5 degrees and has | edges however are softened by locality; roof overhangs a minimum roof overhang, external gutter c) do not present an appearance of excessive of 600mm wide; and timber clad fascias. The bulk to side neighbours; AND roof style meet the roof form d) use simple traditional roof designs; and $13.2 Buildings and Material Change of Use Bomerah Pty Ltd 15 Duke Street, Sunshine Beach June 2007
Page 24
Page 8 €) do not create opportunities for residents to overlook the private open space areas of neighbouring properties. structures do not include roof top terrace areas. requirements however as it:~ a) contributes positively to the local skyline by being broken into a number of levels which step down the hillside reflecting the slopes of the dune and b)it compliments the low density character of the locality by maintaining — setbacks sproviding overhangs and breaking into several levels and c) assists in reducing bulk to neighbouring properties and d) each level is a simple flat skillion which is typical of some traditional beach side designs and €) does not provide opportunity for residents to overlook the private open areas of neighbouring properties. There are no rooftop terrace areas proposed. Sloping sites 014 Development on s/oping sites- a) is responsive to the natural topography of the site and minimises cut and fill; b) does not visually dominate the hill slope or interrupt the skyline; c) is integrated with the natural site d) for Multiple housing, takes the form of small separate buildings. $14.1 Buildings and associated accessways are not constructed on land with a slope greater than 25% (1 in 4); AND $14.2 Buildings are of split level design that step down the slope or have suspended floor construction; AND $14.3 Cut or fill is less than 1.5m in depth; AND $14.4 The distance between the ground and the lowest part of the floor of the building does not exceed 3m to avoid large under-building areas; AND $14.5 Buildings present no more than- b) if in any other zone — 2 storeys at any one point when viewed from the street The proposed development site is relatively flat for approx 25m and then rises sharply (1:3) for the remaining 15m approx. The design is such that it: a) is responsive to the natural topography by stepping up the slope which minimises cut and fill although it is greater than 1.5m, b) does not visually dominate the hill slope or interrupt the skyline because the hill keeps rising to more properties behind c) is integrated into the natural site by maintaining landscape zones in the side setbacks. d) takes the form of separate buildings = by _ introducing different floor plans and different levels for each unit, stepping the facades and recessing the garage doors. Entrance Statement 015 A ssignificant entrance statement is established at the southern entrance to Peregian Beach via the David Low Way to enhance and emphasises the sense of arrival to the coastal area of the Noosa Shire from the south v NA 12.11 Environment, Conservation and Recreation Environment and cultural heritage values 016 There are no significant adverse effects on No solution provided v The site has already been Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 25
Page 9 biodiversity, native vegetation, native fauna habitat, landscape quality, water quality or cultural heritage values, including those related to— a) changes to natural drainage; b) disturbance of the wetland system; c) management of landslide and fire risk; d) erosion and the transport of sediments off site; e) unmanaged public access; f effluent disposal; g) changes to fauna habitat and behaviour; and h) disturbance of buildings and features, including natural features, of cultural heritage significance. developed and this proposal is for the replacement of the existing building with one of a significantly higher quality. Apart from the vegetated slope to the rear of the site, which will be retained as part of this proposal and some moderate size trees on the south east, there is no other native fauna habitats, landscape quality, water quality or — cultural heritage values on the site. Open space network 017 An integrated open space network is established, enhanced and protected throughout the locality to— a) provide for both passive and active recreational pursuits; b) provide connectivity for pedestrians and cyclists; C) provide habitat connectivity for wildlife; d) protect watercourses and drainage lines, €) protect vegetation on steep slopes; and f) form a scenic backdrop for residential development. $17.1 Open space corridors and existing native vegetation in areas indicated in Schedule 5 ~ Map 4 are protected from fragmentation and encroachment by development. Y The proposal is not near land identified on Map 4 as an open space corridor or existing native vegetation and will therefore not impact on it. Pedestrian and bicycle pathways 018 Safe and convenient pedestrian and bicycle pathways are provided and retained between and around key destinations. $18.1 Pedestrian and bicycle pathways are provided and retained where indicated in Schedule 5 - Map 2; AND $18.2 Contributions toward a Pathways Network are provided in accordance with PSP20. Y An existing pedestrian and bikeway path is already located in adjoining streets. This will not be disturbed as part of this proposal, except to provide a new footpath which will create an improved environment for the users. Beach Access Points 019 AND 020 No solution provided ¥ NA Air Craft Safety 021 AND 022 AND 023 ¥ NIA y N/A ¥ NA (b) Specific Outcomes and Probable Solutions for the Semi-Attached Housing Zone Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 26
sy ¢; 9) | 7.16 Consistent uses Page 10 032 The following defined uses and use classes are consistent uses and are located in the Semi-attached Housing Zone- (a) Home —based business Types 1 or 2; (b) Home —based business Type 3; (c) Commercial business Type 1 or 2 (d) Detached House; (e) Multiple Housing Types 14 or 2; (f} Visitor Accommodation Type 1 (g) Visitor Accommodation Type 4 No solution provided v¥ The proposal is for (e) Multiple Housing - Type 2 Duplex which is a consistent use within the Semi-attached Housing Zone 7.17 Inconsistent Uses 033 v NIA 7.18 Effects of Use Visitor Hostels 034 v NIA 7.19 Built Form Streetscape character 035 Buildings and other structures— a) contribute positively to the streetscape character by addressing the street and adding visual interest through stepping the front facades; b) have a bulk and architectural scale that does not dominate the streetscape or detract from the visual amenity of adjoining properties; c) present as a small building of a domestic scale within a landscaped setting; and d) present well articulated facades where garages or carports are not the dominant visual element when viewed from the street; $35.1 The main entrance of the building faces and is recognisable from the street AND $35.2 Buildings and other structures are designed to - a) have maximum wall length of 15m and each external wall plane incorporates at least one design element of add visual interest and amenity (such as windows, pergola, sun shading devices, balconies or a change of building material). b) vary and break up the roof form through gables or different pitches to add visual interest and define the individual dwelling units c) provide individual segmented balconies for each dwelling unit to reduce dominant horizontal banding and to provide private open space or each tenancy d) break up building facades by incorporating different but complimentary textures and building materials; and e) visually break up the bulk of the building by integrating tall plant species in front of and to the side of buildings; $35.3 v The proposal complies with probable solutions. Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 27
6.3 Page 11 036 No more than 2 dwelling units are | $36.1 No solution provided ¥ Complies located on any site Garages and carports 037 Garages and carports are designed and | $37.1 Garages and carports- Complies with probable sited to visually integrate with the building and avoid dominating the street a) have a front boundary setback of a least 6m; and b) adopt a roof form and building style that are the same as that of the building; and ¢) present a minimum width to the streetscape (the total width of garage doors is no more than 6m or 50% of the frontage width, whichever is the lesser, where the structure faces the street); or d) that are visible from, but do not face the street, include windows or other articulation and have a 6m landscaped buffer between the structure and the road frontage, and $37.2 Covered parking spaces located in the area between the swelling fagade and the road frontage do not comprise carports solutions except c) where the total width of door is 6.7m. Because the doors are recessed and staggered the impact is significantly reduced and therefore still meets to O37 requirements Professional offices 038 v NIA Front fences and walls 039 Front fences and walls are designed and sited to- a} contribute to the attractiveness of the street; b} be compatible with the existing streetscape character Cc} relate to the architectural period of the building; d) avoid interference with the movement of stormwater, €) allow for casual surveillance from the street or where premises adjoin part of the major road network, mitigate traffic noise f} provide for planting in front of high solid fences and walls; and g) ensure planting between the front fence and the footpath does not create an impediment for pedestrians using the footopath $39.1 Front fences or walls are a) not forward of the front plan of dwelling units; or b} no more than S00mmhigh; or c) no more than 1.2m high and of open construction (ie at least 50% transparent); OR $39.2 ¥ Complies as all fences are behind the 6.0m building line. v NA Residential Uses Code Specific Outcomes For ali Residential Uses 14.52 Effects of Use ECR es Compliance v/* Electricity supply infrastructure of $1.1 No solution provided ¥ The site is not near an Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 28
Page 12 02 $2.1 Development for uses adjacent to or within 50m of an existing electricity substation incorporates noise attenuation measures to mitigate noise impacts; and $2.2 Buildings and structures (including swimming pools, sheds, tennis courts and outbuildings) are not constructed under overhead electricity transmission lines, or within electricity easements; AND $2.3 A minimum separation distance is maintained from the electricity transmission line to the closed boundary of habitable building and child activity areas, as follows- a) 20m for transmission lines up to 132kV; b) 30m for transmission lines between 133kV and 275kV; and c) 40m for transmission lines greater than 274kV. electricity substation nor any overhead transmission lines. 14.53 Environmentally Sustainable Building Design Hot Water Systems 03 $3.1 All hot water systems installed are — a) solar systems; or b) electric heat pump systems; or c) natural gas or LPG systems; or any combination of a), b) or c) ¥ Will comply Water supply and conservation 04 05 $4.1 Ifin a designated rainwater tank area as identified in Map 1 of Schedule 8, residential uses that qualify as class 1A or 18 structures under the Building Code of Australia have a rainwater tank or tanks in accordance with schedule 8. AND $5.1 Where not in a water service area a rainwater tank of minimum of 60,000 litres is provided for each dwelling unit, with the exception of Multiple Housing Type 4. ¥ each unit incorporates a 3000L water tank Erosion and sediment control 06 No solution provided | Advisory Note | Persons undertaking development, including building work, are required under the Environmental Protection (Water) Policy 1997 (EPP) to ensure that sediment and other material including Full erosion and sediment control will be employed to in accordance with Noosa Council requirements Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 29
Page 13 building waste, sawdust, concrete, cement or paint are not deposited or released into a toadside gutter, stormwater drain or waterway, or into a place where it could reasonably be expected to move or be washed into a roadside gutter, stormwater drain or waterway and are not washed from the site. Council 09 least 3m away from shared driveways or carparking areas of adjacent dwelling units or accommodation units. enforces the EPP and penalties may apply. 44.54 Amenity and built form Safety and security $7.1 The building entrance is 07 clearly identifiable and visible Y The entry door is from the street, footpath and considered to be the gate driveway; adjacent the driveway. This AND is lockable and has an $7.2 The internal path network intercom . has clear sightlines to the It is clearly visible from the dwelling entry and street access verandah. points; AND $7.3 Visitors have direct access to the entrance without passing through private outdoor living areas Emergency access No solution provided ¥ Complies 08 Separation of incompatible uses $9.1 Bedroom windows are at ¥ Complies 010 Mechanical plant & equipment $10.4Mechanical plant and equipment, including pool and spa pumps, pool heaters, air- conditioning units and refrigeration units are — a) where located at ground level, screened by fencing 1.5m in height or dense vegetation of at least 1.5m in width incorporating grouped trees and shrubs with maximum separation distance of 1m measured from the centre of the plant; and b) for Multiple housing Type 2,3 & 4 are visually integrated into the line and plane of the building and roof design and do not project beyond the height or width of the building when viewed from the street and adjoining ~ Complies as it is situated under the pools. Air-conditioning equipment will be located and shielded to prevent nuisance. Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 30
Page 14 properties. Ancillary recreation uses 014 $11.1 If the use involves ancillary use of outdoor courts including tennis courts, half courts and netball courts — the use complies with the requirements in Section 2 of PSP8 Tennis and Other Courts. v NA Privacy 012 $12.1 Transparent doors and windows are designed and located so they do not directly face transparent doors or windows or the private open space areas of other dwelling units within 10metres; AND $12.2 Planter boxes, louvre screens, pergolas, landscaping and architectural design of balconies are used to screen the ground floor private open space of dwelling units or accommodation units from upper level units (refer to Figure 14-2 Privacy Measures which illustrates how trees, awnings, screens, fences and planter boxes reduce minimise the ability to directly look into neighbouring homes and yards). ¥ the two units are back to back and there is no problem with privacy. Decks are located to reduce overlooking into neighbouring properties. Overlooking into neighbouring properties from windows will be reduced with privacy screens, translucent glass and landscaping. Access to Sunlight 013 014 $13.1 Development does not reduce sunlight to at least 50% of the private open space areas of any adjoining residences to less to than 2 hours between 9am and 3pm on any day of the year; OR $13.2 Where overshadowing by existing structures and fences occurs to more than 50% of the private open space areas of any adjoining residences, sunlight is not further reduced by more than 20%. (See Figure 14-3 - Preventing overshadowing) $14.1 No solution provided ¥ Complies Sloping sites 015 $15.1 Buildings and structures on sloping sites- a) Have a maximum distance of 3m between the ground and the lowest part of the floor of the building or the building incorporates under croft skirting or screening (eg. Timber battens) to the full height of any under croft area higher than 3m above ground level at the perimeter ¥ Complies Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 31
Page 15 of the building; b) Are of split level design that step down the slope or have suspended floor construction; c) Limit the amount of cut or fill to less than 1.5m in depth; and d) Oonot result in the spread of ill beyond the footprint of the building and associated ¥ Complies Cuts are greater than 1.5 because of the steepness of site. The cuts are engineered so as not to effect adjoining properties. batters. Wall length and detailing $76.1 The maximum wail length ¥ Complies 016 is 15m; AND $16.2 Walt planes incorporate ¥ Complies design elements to add visual interest and amenity, such as windows, pergolas, sun shading devices and variations in balcony Styles. Table 14-22 ~ For Multiple housing elm el eee 14.55 Built Form ALI CMs SLL ue) i ei aa cl Garages and carports 017 $17.1 Where lock up garages are included- a) Garages are stepped back a minimum of 600mm from each other, in relation to the frontage; and b) Atleast one open visitor carpark is provided between the building and the frontage and is not restricted by gates security screens or other obstacles; AND $17.2 Garages, carports and uncovered spaces are designed to allow vehicles to enter and exit the site in a forward gear through a 3-point turn maximum; AND $17.3 The development provides for shared driveways to minimise the number of access points, except on corner sites where garages or carports in the development front separate streets. ¥ Complies ¥ Complies ¥ Complies ¥ Complies 6.4 Landscaping Code yea erecee liters Probable Solutions (if code assessable) | Compliance v//x 14,152 General Requirements Streetscape and amenity $1.1 Landscaped areas, notless | “Complies 07 than the minimum areas and Material Change of Use Bomerah Pty Ltd 15 Duke Street, Sunshine Beach June 2007
Page 32
Page 16 dimensions specified in Table 14- 53 or 14-54, are provided and maintained. $1.2 Landscaping is designed, planted and maintained in accordance with PSP3 Landscaping Plants and Guidelines 264 sq.m required 399 sq.m provided ¥ Will comply Building and Landscape design 02 $2.1 Below ground components of buildings do not extend beyond the above ground footprint to allow for landscaping particularly within building setback areas; AND $2.2 Basement car parks do not encroach into building setback areas; AND $2.3 Plants are grouped in mulched beds rather than planted individually to provide for optimum growing conditions and less maintenance; AND $2.4 Landscaping is designed, planted and maintained in accordance with PSP 3 Landscaping Plants and Guidelines ¥ Complies ¥ Complies Will comply v'Will comply Species Selection 03 $3.1 Plantings- a) Comprise plant species identified for the relevant landscape character area in PSP3 Landscaping Plants and Guidelines; and b) Avoid undesirable plant species identified in PSP3 Landscaping Plants and Guidelines. OR $3.2 For landscaping around pool areas- a) No more than 30% of the landscaped area is a mixture of plants of focal origin and exotic plant species, provided none of the plant species are undesirable plants identified in PSP3 Landscaping Plants and Guidelines; and b) Palms and specifically located in group plantings in accordance with PSP3 Landscaping Plants and Guidelines; AND §3.3 Root guards are utilised around species with potentially invasive roots. ¥ Will comply v'Will comply ¥’Will comply ¥ Will comply ¥ Will comply Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 33
Page 17 Safety and security 04 05 06 $4.1 No solution provided $5.1 Landscaping provided which allows adequate visibility for casual surveillance of public and semi-public spaces, including entrances and exits to sites and buildings, by: a) Planting trees which have clean trunks to a height of at least 1.8m; and b) Appropriately spacing shrubs at 1.2m Horizontal cenires, with a maximum height of 0.75m, t avoid clumping and to retain sightlines. $6.1 Street trees and trees in car parking areas achieve a maximum of 900mm clear trunk height for a 2.0m high tree at planting and are able to attain a clear trunk height of 1900mm on maturity; $6.2 All scrub planting to be a maximum height of 700mm from the road pavement (not top of kerb) Will comply ¥ Will comply Y’Will comply ¥ Will comply ¥ Will comply ¥Will comply Services and utilities 07 $7.1 Plant species used in landscaping adjacent to substations, or adjacent to or on electricity transmission line easements, are less than 4m high at maturity and do not encroach with 3m of a substation boundary; OR $7.2 For trees higher than 4m, trees are planted at a distance from any part of an electricity transmission line at least equal to the expected height of the tree at maturity $7.3 For power lines that connect to a premises, the height of plant species at maturity provides for a 2m clearance below the power line; S7.4 Trees and large scrubs are located a minimum of - a) 5m from electricity poles and pillars; b) 4m form street lamps; C) 2m from stormwater ¥ Will comply ¥ Will comply ¥ Will comply ¥ Will comply Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 34
Page 18
catchment pits; and
d) 2m from underground
service and utilities;
AND
$7.5 Plants are located to enable
tradespersons to access, view
and inspect service meters, such
as water and electricity meters
AND
$7.6 Root barriers are installed
around trees that are located
within 3m of any infrastructures or
that have potentially invasive
roots.
¥ Will comply
¥ Will comply
Entry statements
08
09
$8.1 No solution provided
$9.1 Entry statements are low
maintenance and located entirely
within privately owned land.
NIA
NIA
14.153 Specific requirements for Multiple housing & Visitor Accommodation
Private open space
010
BT
x
Bm SZ
RECEIVED \>\
¥
YyY
$10.1 For Multiple housing
Types 2 and 4, each dwelling
unit provides for landscaped
private open space comprising-
a) for units at ground level, a
minimum area of 25m2
exclusive of the clothes
drying are, with minimum
dimensions of 4m and
maximum gradient of 10%
(1:10); or
b}) for units above ground level,
a minimum area of 12m2,
with minimum dimensions of
2.5m; and
$10.2 For Multiple housing
Types 2 and 4, the private open
space area in enclosed by side
and rear fencing, screening or
dense landscaping of at least
1.8m in height to protect the
privacy of residents; or
$10.3 For Visitor
Accommodation no solution
provide
NIA
¥ Complies
15sq.m provided
¥ Complies
YNIA
Communal open space
011
No solution provided.
Because of the nature of the
site the communal open
space is limited to the
driveway area. Some
private open space is
provided in lieu.
Screening & Mounding
012
013
014
No solution provided
¥ Complies
¥ Complies
v NA
Material Change of Use
15 Duke Street, Sunshine Beach
Bomerah Pty Ltd
June 2007
Page 35
Page 19
015 ¥ NIA
Streetscape character No solution provided
016 vWill comply
017 v NA
Passive solar access and energy efficiency | No solution provided v’Will comply
14.156 Environment protection and conservation
Watercourses and drainage lines No solution provided v NIA
024
Wildlife habitat protection $25.1 For Koala Habitat Areas
025 shown in Schedule7- v NIA
a) Aminimum of 70% of tree
species planted on the
premises are koala food
trees listed in PSP3
Landscaping Plants and
Guidelines; and
b) Where koala access is
impeded by a fence or
retaining wall-
i) Climbing poles are
erected at regular
intervals along the
structure at an
approximate 45 degree
angle on either side of
the structure;
ii) Plant vegetation within
close proximity
{branches touching) on
either side of the fence
to provide a natural
ladder; and
iii) install panels or planks
horizontally along the
top of the fence to
provide a walkway,
where appropriate; and
c) Choose fence materials,
such as timber post and rail
or chain wire, that a koala
can easily grip and climb or
leave a minimum 300mm
gap between ground level
and the first rail or strand of
any fence; and
d) Where there is a swimming
pool in the landscape design
likely to be accessible to
koalas, a rope is provided to
enable koalas to climb out of
the pool;
AND
$25.2 Vegetation of local origin is
tetained and replanted in areas
indicated in Schedule 5 on Map 4
— Open Space Networks,
Material Change of Use Bomerah Pty Ltd
15 Duke Street, Sunshine Beach June 2007
Page 36
6.5 Page 20 Water management $26.17 The infiltration and conservation of water is optimized | ~Will comply through - a) Selecting native plant species identified in PSP3 Landscaping Plants and Guidelines; b) Grouping plants in mulched beds; c) Minimizing impervious surfaces; d) Using semi-pervious pavement surfaces; such as grass cell paving, as a alternative to pervious surfaces e) Draining hard surfaces areas to landscaped areas; f) Planting micophytes along driveways to absorb hydrocarbons; and g) Using surface and subsurface drainage swales. h) Soil stability No solution provide v’Will comply 027 14.157 Carparking areas 028 Off street carparks v NIA 029 On street carparks v NA Driveways and Carparking Code Specific Outcomes } Driveways | 14.130 General Probable Solutions Compliance v/x 07 Vehicular access does not adversely impact on safety, capacity and operations of the existing or planned road network, the proposed driveway, cycleways or pedestrian pathway systems. $1.1 Vehicular access is located and designed in accordance with AUSTROADS Guide to Traffic Engineering Practice requirements for sight distance and Section 3 of AS2890.1 Parking Facilities; AND $1.2 Only one footpath crossing is provided; AND $1.3 Driveways, other than within any setback have a maximum grade in accordance with Section 3 of AS/NZS 2890.1 v The proposed access and driveway has been designed in accordance with AS2890.1. Only 1 driveway is provided . O2 Driveways and crossovers— $2.1 Design of the driveway ¥ Complies. a) are suitable and safe for their intended use; | across the footpath is in and accordance with Council's b) match Council infrastructure. Standard Drawings 9002 or 9005 as appropriate for the particular type of development as annotated on the drawings; AND Material Change of Use Bomerah Pty Ltd 15 Duke Street, Sunshine Beach June 2007
Page 37
Page 21 $2.2 Driveways are designed and constructed in accordance with Council Standard Drawings 9014, 9019, 9020, 9021, as appropriate for the particular type of development as annotated on the drawings; AND $2.3 The change in grades in the driveways and ramps is in accordance with Section 3 of AS2890.1 Parking Facilities. 03 In commercial zoned areas, the number of driveways across pedestrian footpaths is minimised. $3.1 Design of multi-tenanted developments in commercial Zoned areas include shared driveways and parking areas; AND $3.2 Driveways are located so they abut existing driveways of adjoining development where practicable and reciprocal easements are created to teduce the sealed driveway width. v NIA v The existing drive will be modified to be — slightly narrower. 04 Vehicular access does not adversely $4.1 Footpath and kerb ¥ Complies. impact on the capacity, operations and crossings are located clear of maintenance of the existing infrastructure; existing stormwater inlet AND structures, water and sewerage O85 Vehicular access does not adversely infrastructure fittings, any other impact on the integrity of existing landscaping | exiting utility infrastructure, or native vegetation. existing landscaping and vegetation. $5.1 No solution provided 06 Driveway run-off is filtered prior to leaving | $6.1 For— ¥ Complies. Appropriate the premises. a) Ancillary dwelling unit, Multiple housing Types 1 or 2 if less than 5 carparking spaces, Visitor accommodation Type 1 and Home based business—the driveway is formed to drain to landscaped areas, and b) for other uses—grease and oil arrestors or stormwater quality improvement devices are incorporated into the design to treat run-off prior to run-off exiting from the stormwater quality will be directed to landscape areas. 15 Duke Street, Sunshine Beach premises. Carparking and manoeuvring 14.132 Carpark design and layout 09 Sufficient carparking is provided to $9.1 The number of parking ¥ Complies. accommodate the number and type of and loading bays is not less vehicles likely to be generated by the than the minimum number development having regard specified in Table 14-47 to the specifics of the use including— Vehicle Parking Requirements; a) the type and intensity of land use; OR b) any existing parking available on the site; $9.2 If insufficient carparking v NIA c) hours of operation; spaces are provided on-site a d) likely numbers of users; monetary contribution is made Material Change of Use Bomerah Pty Ltd June 2007
Page 38
Page 22
e) the peak parking demand periods of uses
on the site; and
f} the availability of alternative carparking.
to Council in accordance with
Section 6 of PSP13
Contributions in lieu of
provision of off-street
carparking.
010 The layout of the development provides
adequate, clearly defined and easily
accessible—
a) on-site vehicle parking and manoeuvring
areas; and
b) loading and manoeuvring areas for delivery
and service vehicles
$10.1 Parking bays,
manoeuvring areas, queuing
areas, loading, setdown and
pickup areas and driveways
are designed to the standards
set out in Sections 2 and 3
of Australian Standard AS
2890.1 Parking Facilities (Part
1; Off-street Carparking) and
AS 2890.2 — Off-street Parking
(Part 2: Commercial Vehicles),
AND
$10.2 The number of loading
bays is not !ess than the
minimum number specified in
Table 14-47.
¥ The parking _ bays,
manoeuvring areas, etc have
been designed in accordance
with AS 2890.1.
O11 Parking areas are located where they will
not unduly conflict with pedestrians and will
not dominate the streetscape.
$11.1 Carparking areas are
accessed from rear laneways
where practicable.
¥ The proposed access
driveway is in the same
location as the existing
driveway and is in the most
appropriate location.
012 Provision is made for a reasonable $12.1 Carparking spaces are v NIA
number of on site carparking spaces identified | provided for people with
and reserved for people with disabilities. disabilities at the rate specified
in Section 2.4.5 of AS 2890.1 -
Parking Facilities (Part: Off-
street Carparking).
013 Access and egress points do notimpact | $13.7 Vehicle manoeuvring Y Vehicles will be able to enter
on the safety and operations of the road
system.
areas are provided in
accordance with Section 3 of
AS 2890.1 Parking Facilities
{Part 1: Offstreet Carparking)
so vehicles enter and leave the
Site in a forward gear.
and leave the site in a forward
gear in accordance with AS
2890.1.
014 Development with the potential to
generate significant traffic and parking impacts
gives appropriate consideration to transport
and land use issues.
No solution provided
¥ N/A. The proposal will not
generate significant traffic and
parking impacts.
015 Business Uses and Community Uses
are designed and constructed to encourage
users of the development to access the site by
means of foot or bicycle through provision of
appropriate end-of-trip facilities including
bicycle parking and shower/change rooms
$15.1 Safe and convenient
cycle access to and from the
site from the existing road and
bicycle network, and safe
bicycle movement within the
site is provided;
AND
$15.2 Secure and convenient
parking space for bicycles is
provided on site in accordance
with Table 14-48 Minimum
requirement for bicycle parking
and AS2890.3 Bicycle Parking
Facilities;
AND
$15.3 Where at least 10
bicycle car parking spaces are
Y NIA
¥ NIA
vv NA
Material Change of Use
15 Duke Street, Sunshine Beach
Bomerah Pty Ltd
June 2007
Page 39
Page 23 required in accordance with Table 14-48, end-of-trip cycle facilities are provided at the following rate: a) 1 locker per 2 bicycle parking spaces; and b) 1 shower cubicle with ancillary change rooms per 10 bicycle spaces or part thereof, providing facilities are either unisex or both males and female facilities are provided. AND $15.4 Bicycle parking spaces and cyclist facilities are designed in accordance with AUSTROADS Guide to Traffic Engineering Practice, Part 14 - Bicycles, Section 10. AND $75.5 On-site pedestrian facilities such as seating and shade are provided in developments for the convenience of persons walking to the site. v NIA v NIA 016 Carparks are designed to ensure run-off is treated to remove pollutants prior to leaving the premises. $16.1 Grease and oil arrestors or stormwater quality improvement devices are incorporated into the design to treat run-off prior to it leaving the premises. v NIA 017 Carparking areas are designed to ensure drainage without the use of pumps or other electrical apparatus. No solution provided v¥ Complies. No pumps or other apparatus will be required to assist with the drainage from the site. 078 Site layout and building design provides for soft landscaping to be established. $18.1 Below ground components of buildings, including car parks, do not extend beyond the above ground footprint to allow for the provision of landscaping, particularly within building setbacks. ~ Complies. Table 14-47 - Minimum Vehicle Parking Requirements (extract) Multiple Housing Type 2 Duplex 1 covered space per dwelling unit; AND 1 space for visitor parking, accessible at all times Y Complies. 5 spaces provided including 1 visitor parking 6.6 Earthworks Code Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 40
Specific Outcomes Acceptable solutions (if self-assessable) Probable Solutions (if code assessable) Page 24 Compliance “/x 14,138 Effects of works Drainage 01 $1.1 The finished surface gradient of any filled or excavated area is within the tange 0.5% to 1.5% and drains to Council's stormwater infrastructure where available or where stormwater infrastructure is not available, toward the street. Y Allsurfaces drain to storm water outlets. Hydraulics 02 No solution provided. v Generally the pavements will be constructed to drain to the front of the site. Geotachnical considerations 03 For assessable development- $3.1 Filling works are undertaken in accordance with Section 2.8- Filling of Site of Council's PSP5 - Engineering Design Standards- Roads and Drainage and Earthworks AND $3.2 Where the filling is for residential commercial or industrial purposes the works comply with Sections 3 to 6 of AS 3798 — Guidelines for earthworks on commercial & residential development. ¥ All pavements are designed to meet the requirements. A geotechnical engineer is engaged to design the proposal SO as not to cause instability on this or adjoining sites. Local amenity 04 $4.1 The following contro! measures are implemented — a) Regular water spraying of exposed areas to suppress dust; b) Provision of dust stabilised or sealed internal roads; c) Protective covering of exposed areas that are left for more than 2 weeks; and d) If there is no valid development permit for the site, disturbed areas are revegetated using species identified in PSP3 - Landscaping Plants and Guidelines. AND $4.2 Earthworks are undertaken only during the hours of 7am to 6pm, Monday to Friday and 7am to 6pm on Saturday. No work is undertaken on Sunday or ¥Y All construction methods will meet the requirements of council. Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 41
6.7 Page 25 public holidays. Vegetative Waste 05 $5.1 Cleared vegetation is transported off-site for disposal in an approved green waste disposal facility; OR $5.2 Cleared vegetation is mulched on-site and reused for landscaping of the finished development; OR $5.3 Cleared vegetation is disposed of for the purpose of firewood v The disposal of all vegetation to be removed will meet council requirements. Managing contamination risk 06 $6.1 The fill material is solid clean earth, free of putrescible or refuse material, vegetation, acid sulfate soils, building or construction material or other material or contaminants; AND $6.2 The sife is not on the contaminated land register. v Fill material will be required to meet the standards required for construction. ¥ The site is not on the contaminated land register Haulage activity and amenity 07 No solution provided v All work for the development will _utilized normal machinery and haulage methods and use routes currently acceptable for their use. Extent of earthworks 08 $8.1 All earthworks, including cut and fill batters, retaining walls etc are contained within the subject site. v All cut and fill is contained within the site. Environmental protection 09 No solution provided. ¥ Sediment control measure will be incorporated around the site. Dams No solution provided Not Applicable Erosion and Sediment Control Code Specific Outcomes 14.143 Effects of works Probable Solutions (if code assessable) Compliance v/* Erosion and sediment control 01 $1.1 Site disturbance is limited to building areas, their surrounds and other use areas; AND $1.2 Sediment barriers are provided throughout and downslope of disturbed areas to prevent sediment washing into gutters, drains and watercourses either on or off the site; AND $1.3 All stockpiles including sand, soil or building materials are within the premises and ~ Complies ¥ Complies using council approved methods ¥ Sediment Barriers are proposed to contain migration of building materials Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 42
Page 26
contained within individual
sediment barriers;
AND
$1.4 Sediment basins are
provided where the site
contains fine or dispersive
soils;
OR
$1.5 A storm water catchpit
incorporating a stormwater
catchpit protection device is
installed so that all runoff from
disturbed areas flows to the
catchpit;
$1.6 For buildings,
a) Temporary or permanent
downpipes are connected
to the stormwater system
before laying the roof; or
b) Localised erosion is
avoided by directing flow
from down pipes over non-
erosive areas
¥ NIA
¥ Complies using council
approved methods
¥ Storm water connection is
proposed to avoid erosion
Storm water runoff
02
$2.1 Diversion drains or bunds
are designed and constructed
to drain upstream run-off
around the disturbed site;
AND
$2.2 Discharge from the
diversion drains do not cause
run-off impacts to other
properties;
OR
$2.3 Alternative methods, as
described in the Institution of
Engineers Australia
(Queensland Division) Soil
Erosion and Sediment Contro!
- Guidelines for Queensland
Construction Sites, are used.
¥ Stormwater is proposed to
be diverted to avoid disturbed
areas
6.8 Existing Services Code
Ay eealdem el eeu Probable Solutions {if code assessable) Compliance ~/x
Setbacks and easements
01
$1.1 The footing of any
structure or building is located
clear of the zone of influence
but no closer than 1.5m
(measured horizontally) from
infrastructure including sewers,
water mains and stormwater
structures;]
AND
$1.2 No building or structure
overhangs the zone of
influence;
AND
v The sewer on the road
reserve is outside the zone of
influence of the proposed
building
v No overhangs are proposed
over the zone of influence of
the sewer
Material Change of Use
15 Duke Street, Sunshine Beach
Bomerah Pty Ltd
June 2007
Page 43
Page 27
$1.3 Finished surface levels
maintain a minimum of 600mm
of cover, but no greater than
3m of cover to the underground
infrastructure;
AND
$1.4 If the existing surface
level is altered, surface level
services including manholes
and inspection points are
altered to match the new
surface level;
AND
$1.5 Alterations are
constructed in accordance with
Sections 3, 4 and 5 of PSP6 -—
Engineering Design Standards
— Water and Sewerage and
Section 4 of PSP5-
Engineering Design Standards
— Roads, Drainage and
Earthworks.
AND
$1.6 Existing services are
relocated and the design and
construction of the relocated
services is in accordance with
Sections 3, 4 and 5 of PSP6 —
Engineering Design Standards
— Water and Sewerage and
Section 4 of PSPS —
Engineering Design Standards
~ Roads, Drainage and
Earthworks.
Y No service exist in the
building zone
¥ NIA
v NIA
v NIA
02
$2.1 A registered easement in
favour o fcouncil is created
over ail underground
infrastructure located in private
property;
AND
$2.2 The width of the
easement is the greater of 2m
or the width of the zone of
influence;
AND
$2.3 The easement is centre
over the centreline of the
infrastructure.
¥ NIA
6.9 Transport, Roads and Drainage Code
Specific Outcomes Probable Solutions {if code assessable) Compliance “/x
14.163 Strategic Transport Network
04 $1.7 Where the development 1 extra dwelling unit is
leads to the need to increase
transport infrastructure in the
Shire, the development
proposed
Material Change of Use
15 Duke Street, Sunshine Beach
Bomerah Pty Ltd
June 2007
Page 44
Page 28 contributes to the transport network in accordance with the requirements of Infrastructure Charges Plans (!CP); and where developments requires infrastructure not included in the ICP, the development upgrades the infrastructure at no cost to Council. Advisory note Council may for some development require the preparation of a Transport Impact Assessment Report. Planning Scheme Policy PSP1 details matters to be addressed in the Report. 02 No solution provided ¥_Complies 03 $3.1 Facilities for boarding and exiting community transport service and facilities are incorporated into developments. ¥ The development is close to existing public transport and bikeway etc. 04 No solution provide. ¥ Complies yee eles ae Probable Solutions (if code assessable} _ Compliance Vix: . ~~’ 14.164 Road and drainage design and construction 05 $5.1 Road planning and design supports the hierarchy and functional aspects identified in Sections 2 and 3 of PSP5 Engineering Design Standards ~ Roads, Drainage and Earthworks; AND $5.2 Road and pathway planning and design is in accordance with, in order of precedence — a) Noosa Integrated Local Transport Plan; b) Queensland Transport's Shaping Up; c) Queensland Design Code for Residential Streets; d) AUSTROADS Guide to Traffic Engineering Practice; e) Sections 2 and 3 of PSPS Engineering Design Standards — Roads, Drainage and Earthwork; or the Noosa Cycling and Walking Network Development Plan; OR g} Acombination of the principles in these Y The development is proposed in an existing residential area which provides all these facilities. Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 45
Page 29
documents
AND
$5.3 On road cycling treatment
is utilised to provide safe and
continuous movement of
cyclists along a roadway, such
as -
a) Sealed shoulders;
b) Wide kerbside lane;
c) Exclusive or peak
period bicycle
Awareness Zone;
d) Shared parking /
bicycle lane;
e) Contra flow bicycle
lane; and bus/bicycle
lane.
$5.4 The provision of bicycle
lanes at intersections is
generally in accordance with
AUSTROADS Part 14, section
5 and the Manual of Urban
Traffic Control Devices
{MUTCD) Part 9.
06
$6.7 Stormwater drainage
planning, design and
construction is in accordance
with Section 4 of PSP5
Engineering Design Standards
— Roads, Drainage and
Earthworks;
AND
$6.2 As Constructed data is
submitted in accordance with
Section 6 of PSP5 Engineering
Design Standards - Roads,
Drainage and Earthworks;
AND
$6.3 Stormwater drainage
planning, design and
construction is in accordance
with the Queensland Urban
Drainage Design manual.
Y Water quality devices are
proposed to improve quality of
stormwater before it water the
council stormwater system.
07
$7.1 Roads and stormwater
drainage infrastructure is
constructed in accordance with
a) Sections 2, 3 and 4 of
PSPS Engineering
Design Standards -
Roads, Drainage and
Earthworks;
b) Queensland Design
Code for Residential
Streets;
c) AUSTROADS; or
d) Acombination of the
principles in these
documents;
AND
~ Complies
Material Change of Use
15 Duke Street, Sunshine Beach
Bomerah Pty Ltd
June 2007
Page 46
Page 30 $7.2 Erosion and sediment control measures are designed and implemented in accordance with Institution of Engineers Australia (Queensland Division) Soil Erosion and Sediment Control -— Guidelines for Queensland Construction Sites. 08 $8.1 Roads and stormwater drainage follow the edge of existing disturbed areas, or alternatibely, these works are co-located within a combined utility corridor; AND $8.2 Roads avoid nativwe vegetation and provide for fauna underpasses and associated fencing where appropriate; AND $8.3 Road infrastructure within or adjacent to native habitat incorporates fences which allow for protected wildlife movement and controls unrestricted access of domestic cats and dogs; AND $8.4 Native vegetation is protected from clearing or construction activities by- a) Clearly marking vegetation to be retained with flagging tap; b) Installing protective fencing around the dripline of vegetation; and c) Ensuring stock piling, storage and vehicle parking occur outside the areas of vegetation to be tetained; AND $8.5 Low impact construction techniques are used around areas of vegetation to be retained to minimise interference with the vegetation. ¥ Complies 09 No solution provided v NA 010 $10.1 The location, design and construction of stormwater drainage structures is in accordance with Sections 4 and 5 of PSP5, Engineering Design Standards - Roads, Drainage and Earthworks; v NIA Material Change of Use 45 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 47
Page 31 AND $10.2 Where infrastructure is located on private land an easement is dedicated over the infrastructure in accordance with Section 4 of PSP5, Engineering Design Standards — Roads, Drainage and Earthworks. 14.165 Frontage works on $11.1 The following infrastructure components already exist at the frontage of the site or are provided at eh developer's expense — a} Full width sealed road; b) Concrete kerb and channel where ¥ Complies All infrastructure is in place with the exception of a footpath which will be provided as 15 Duke Street, Sunshine Beach a required by Council. appropriate; c) Forming and grading to footpaths; d) Vehicular kerb and footpath crossings; e) Aconstructed bikeway; f} Aconstructed footpath; g) Aconstr4ucted carriageway; h) Required alterations to public utility main, services or installations; i) Construction of any required altercations to public utility mains, service or installations; j) Stormwater drainage works; and installation of electrical conduits; AND $11.21 Road and drainage design and construction is in accordance with Sections 3 and 4 of PSP5 Engineering Design Standards - Roads, Drainage and Earthworks. 14.166 Road and rail corridors 012 $12.1 Noise sensitive uses ¥ NIA including residential uses are separated by a minimum of- a) 40m from the property boundary of roads within the major road network; and b) 80m from the property boundary of Material Change of Use Bomerah Pty Ltd June 2007
Page 48
Page 32 rail corridors; OR $12.2 Development in the vicinity of road corridors meets the following external design criteria for roads in the major road network- a) 63d B(A)L10 (18 nous) based on predicted traffic volumes ten years hence; AND $12.3 Development in the vicinity of rail corridors meets the following external design level noise criteria — a) 65dB(a), assessed as the 24hour average equivalent continuous A-weighted sound pressure level; and b) 87dB)A_, assessed as a single event maximum sound pressure level. to infrastructure as a result of the development are completed at the developer's expense. 14.167 Stage development 013 [_No solution provided LY NA 14.168 Alterations to services and utilities 014 $14.1 Any alterations or repair | “ Complies 6.10 Waste Managment Code ode assessable ) ey) O . Waste separation 01 02 $1.1 Construction, operational and demolition works are planned and manage in accordance PSP124; AND $1.2 Adequate area is provided for on-site for the collection and separate storage of recyclable, non-recyclable, vegetative and hazardous materials in their specific waste streams during construction, operation and demolition works; AND $2.1 Waste storage areas allow for the separate storage of different waste materials for reuse or recycling by - a) Providing sufficient area to store all recyclable material and recycling containers required, ¥ All construction waste will be stored on site in commercial skip bins and disposed of by the waste disposal contractor to land fill/recycting Y The bins will be situated Strategically on site and serviced regularly Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 49
Page 33 and b} Sign posting the types of waste stored. Design and location of waste storage areas 03 AND 04 AND 05 $3.1 Waste storage areas are designed and maintained in accordance with PSP9; AND $3.2 Waste storage areas are designed and located sot they- a) Are easily accessed and convenient to use; b) Have unobstructed access for the collection of the waste by service vehicles; c) Provide for sufficient space for safe entry and exit and servicing by Council's contractor without the need for manual handling; d) Are clear of car parking bays, loading bays and similar areas; e) Are clear of footpaths and pedestrian access; f} Are capable of being service by the collection vehicle without impeding traffic flow; and g) Have alevel area provided for the storage of waste and tecyclable materials in standard waste containers; and AND $3.3 For uses that do not comprise a caretaker's residence or central management, the maximum distance between waste storage areas and the kerbside is- a) For Multiple housing Type 3 - 40m; b) For other uses — 70m; and $3.4 Pathways used to transport bins — a) Have amaximum grade of 1:15; and ~ Aproposed waste management plan will be provided. v NIA ¥ Complies ~ Complies ¥ Complies Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 50
Page 34 AND 06 b) Are free of steps, stairs or other impediments; AND $4.1 Waste storage areas are a) Integrated with the building design, where possible; b) Setback a minimum of 2m from side and rear property boundaries; c) Screened to the bins are no visible from neighbouring properties or passing vehicular and pedestrian traffic; and d) Not located directly adjacent to dwelling units on the site on neighbouring properties; AND $5.1 Waste storage areas are constructed of impermeable, durable and non-textured materials and surfaces so that they are easily cleaned; AND $5.2 A minimum distance of 0.5m2 distance is provided between and around waste storage bins to allow for manoeuvring and washing of bins. AND $6.1 No solution provided ¥ Complies Water management for waste storage areas $7.1 The waste storage area - a) Is bunded and graded so that wash water and bin leakage are drained to the sewer or an on-site effluent disposal system via a gully within the storage area; b) Has a bund wall with a maximum height of 100mm; c) Is service be a conveniently located hose cock and back flow prevention device, and connected to a water supply; and d) is roofed or otherwise covered if ¥ Complies Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 51
Page 35 the storage area is — i} More than 1m2;or ii) Storing wet waste: or ili) Storing other waste with a high potential to cause pollution if washed or leaked from the bins, including waste oil or putrescibles. 6.11 Water Sensitive Design Code Specific Outcomes Probable Solutions (if code assessable) (eeu) ELL tal hol Water reuse 01 02 03 04 05 $1.1 No Solution provided $1.2 No Solution provided AND $3.1 Captured water is plumbed to be available for all external uses including gardening, irrigation, ponds, filling swimming pools and outdoor cleaning, as well as all ground floor toilet cisterns and washing machine cold taps and $3.2 Where the captured water is used for toilet flushing and/or laundry use, an automatic or manual interchange device that allows alternate use of captured water or the reticulated water supply is installed to ensure that there is a continual supply of water for sanitary flushing and laundry use. $4.1 No solution provided ¥A 3000L tank is provided for each unit Y¥ Complies ¥ Complies ~ Complies v_ NA Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 52
Page 36 $5.1 No solution provided ¥ NIA Run-off treatment 06 07 No solution provided ~ Runoff is to the landscape area ¥ NA Town water supply connections 08 $8.1 A suitable backflow prevention device is installed to protect the potable water within the reticulated water supply in accordance with ASINZS 3500:2003 Plumbing and Drainage ¥ Complies Use of natural treatments and systems 09 10 No solution provided ¥ Complies v NA 6.12 Water Supply & Sewerage Reticulation Code pe O eT Probable So ) 14.181 Design and construction (water) ode assessable °) 01 $1.1 Water supply infrastructure is designed in accordance with Section 3 of PSP6 - Engineering Design Standards - Water and Sewerage and As Constructed data submitted in accordance with Section? of PSP6- Engineering Design Standards — Water and Sewerage. v Complies 02 $2.1 Water supply infrastructure is constructed in accordance with Section 6 of PSP6 - Engineering Design Standards - Water and Sewerage; AND $2.2 Erosion and sediment control measures are designed and implemented in accordance with the /nstitution of Engineers Australia (Queensland Division) Soil Erosion and Sediment Control — Guidelines for Queensland Construction Sites. Y Complies 03 No solution provided. ¥ N/A 04 No solution provided. v NIA 05 $5.1 The footing of any building or structure is located clear of the zone of influence but no closer than 1.5m v NIA Material Change of Use 15 Duke Street, Sunshine Beach Bomerah Pty Ltd June 2007
Page 53
egcEWveD
= 4 JUN 2007
OSA SHIRE CEEEED
wer paNT COUNTER
{ FIRST FLOOR PLAN
sexe 1100
Mistoc Paring
(25mx55m)
SITE & GROUND FLOOR PLAN
eeate -100
PLANNING PROVEIONS:
Bane wt carrer Mews Ptaroing 2c hee}
kee fos zat on ae 28319
[sae Acres iS Ovie Stent
URGHAE BEACH OLD 667
fsaw Area rr
ocaney fessiem Bascher
[zone [Ser Atached Hovang
fOvierion cee Reackrel Une, Mole
PHounng- Type 2 Ou
lovers Trqgerea Pourat Hazara Ove -
farciside Arve.
vel of Agumserene {eae Assesaman, Coneaiet
jon
APPLICABLE COOES:
(Bitsed on the current Nooea Plaening Schama}
lEasiee Bowcnes [oonssten
Locakey Code
FRewserast Uses [Coneesent Ganeraty
Koowe ket rar rotvanen rece
func Code fearmatant
Keren Tres orator
fears
DEVELOPMENT PARAMETERS
Esser detrei
bematcam poteroat | fer gaat
HOF) Prcnrery Atel CFA Petar SO 05)
RExchrins yareye)
beanie foes mimes
Rater $0055
bina feta | hea
Randecaony 8x Qagm = 24 gn Hard (155 14.097)
Reawenert Prax €0 hard / me 80% sett | | Sot (261 0 m4)
Reellee SO 05},
hmamaay famgoxnatamer
femme avers psu
a eg
tne Ouse,
ARCHITECTS
aor
Bomerah (Qld Ply Ltd)
monet
Proposed Duplex
Location
15 Duke Street
SUNSHINE BEACH QLD
cannons,
Floos Plans 1
_ - oon
1100 FEB 2007 1M
oo od
on spot
Page 54
$89958°"$"9* 28
ROOF PLAN
SECOND FLOOR PLAN
hme Dor Dae
ARCHITECTS
avr
Bomerah {Qld Pty Ltd)
pmo
Proposed Duplex
caren
15 Duke Street
SUNSHINE BEACH QLD
oun
Floor Plans 2
13109 FEB 2007 1M
mene ane news
0634 5062
Page 55
ee
i
RL 48.0 U2 Bed 2&3 I
RL 46.0 U2 Liv/Dinykil/Bed 1 |
46.0 Ue LiwDinkivBedt
LEGEND
{BIE Pranterponrs ansatiog
~-—-- — FE] Fave cemare Sreetna
(ETE) Honorea! oer Ciadcing
(IE) vertcal Timber Craading
(HE) Pancered conerete
CE] irwten coturen concrete -ameath fh
NORTH ELEVATION FER] rerores wockwerh
Fished Ground Line
Natural Ground Line
‘
|
i
‘
|
1
AL48.0 U1 Bed 5
meee ee DE a et J AL 44.0 U1 EntryBed 2 & 3
Fimghed Ground Une, seemed —--— -— ee
Natural Ground Une ran = anand }
SOUTH ELEVATION
Al 49.0 U2 Bed 243 |
REA Ui DivKit eee ee
Fhished Ground Line
Nptural Ground tine.
Fimshed Grovad Line ; i
Natural Geound Line: | |
STREET ELEVATION WEST ELEVATION
ole 7700 vere 7100
Nee Owe Dale
ARCHITECTS
MIDDAP DITCHFIELD P/L
oT oo
chase ng fe Pid DT Decent 2095
—
Bomerah (Qld Pty Ltd)
a
Proposed Duplex
voeanen
45 Duke Street
SUNSHINE BEACH QLD
cannes
Elevations
100 FEB 2007 M8 BM
pars oeon cee nem
cos soos
Page 56
A an be
o Mb 48.0 U2BedZ&9 RN nN alert eee ermal ap \ — —— BL 49.0 U2Bed 283,
pAb 8.0 UB
' BL 42.0 U1 LApDivki |
Ak 48.0 UztivDivKivBed ta eel eecres meses eee eeeeeeeenenetemeaunaimmmnti —-—~- —}p — — — —- — —- — — | — FL48.0_U2 LW/DiyKiyBed 1,
Landscaped Rock Retaining Wall |
‘ Landacaped Rock Retaining Wall
@ Garage |
RL43.0 U2Gaaga | —— ~~ — — 1 1 | RL 43.0 U2 Garage
oft 43.0 U26 eerie KS. —— —~ —FLA3.0 U2 Gar ho
r ZT y
YIYYss5
CR
SECTION A-A SECTION C-C
cake 3 100 sean 1.100
-
a“
a
a
a
a
a
7
“
Z
a
=a
_
=
a
< |
—
LEGEND
oMao uted:
Pracertoend uheetog
pS a a Fibre Cement Sheeting
Honzontal Timber Cladding
Vertical Timber Closing,
Rendered concrete
‘nate coloured concrete - smooth fh
Rendered blockwor':
aGaRRa8
oAbMB0 UIGame : waa enn
SECTION B-B
scale 1,100
wo Cote aa
ARCHITECTS
ver
Bomerah (Qld Pty Ltd)
mraxect
Proposed Duptex
r0canon
15 Duke Street
SUNSHINE BEACH QLD
Pod
Sections
fs es eee ne | 1100 FEB 2007 KM
° 8 0m Semen ed
0834 sp
Page 57
=~ GFA - SECOND FLOOR ! ‘scale 1"200 GFA LEGEND §838 Indicates Gross Floor Area GFA Total 274.54m? 168.37 m? ! GFA - FIRST FLOOR eam 13200 GFA - GROUND FLOOR ewe 1.200 | ! SITE COVER seals 1200 ee 20m ° 10 11.84 m? 12.00 m? 98.47 m? 214.47 m? 8.46 m? 243m? | 17.73 m? | ! I . sya! max 158.89 m2? LANDSCAPING Hard (7—]]| 156.14 m? Soft_ E=3| 243.30 m? imin 238.33 m2" Total 399.83 m? min 264m? LANDSCAPING me Ome Oma ARCHITECTS MIDDAP DITCHFIELDO P/L cue Bomerah (Qld Pty Ltd) rromct Proposed Duplex Locarn 15 Ouke Street SUNSHINE BEACH QLD omnes GFA, Site Cover & Landscaping FEB 2007 KM ome eee ney ante sp05 834
Page 58
ao on ered CONTOUR & 3%, Leif 6.11.03 6.11.03 6.11.03 % oe = = row mee DETAIL PLAN %y 2. 2 EE 3108-01 9 Aumeneis } of ° DONALD JAMES COLSTON SCALE 1: 100 LOT 201 CONALD JAMES COLSTON. B.AppSc-Surm(with On) Jt DUNLOP ) on RP48113 surveyed project, at apt 5.11.03 CONTOUR & DETAIL PLAN 15 DUKE STREET coos \ SUNSHINE BEACH Orig Por 28 CONTOUR & DETAIL a Parish WEYBA County March SURVEY PLAN Locality: TOWN OF wae on SUNSHINE BEACH w 1: 200 6 NOV, 2003 § 2 8 ®o D @ %%,?° ce) a [> M . . 2 = _. Pool Screen Fence x 42°58'20" te 3 a a ? i ve a fp Sy > « & ol ScrgeryFey /)| \44 \s\ \ | | | 40,730 Fence - kd a ao " —e eee - ez (PL : LE %. %, “, 2 ou iS L 7 o mu, s aaa TTL LLL F- “ g fac é = 4 044 7 ° Bz fe w Ye, o Fy page — & Z o wm Cae . S ” 95.0% Con) L, “S ‘ ®, OES S & Re, . ef “y aay . a eee Bo [kt | 33 2 8 =f ° wy 6. %, ag Gk = FS % & 8 qs g ae 9yty,§——® eM as ash es “ye SS. % fs fF ORE % % % & 3 i] le ry % Spee c oo 8 YY) » Se Ys > ie 7 LY § ~ Y BS ont 2p E j p 4, ; \ & uy Fr @ & “8 1 ett bi 1D : a S| SS Bes % LA hs Y ke SS, 74, Af Eb y | ve 5 tye ~ | eS ve cae ey Vv o im 130" > 42°58'20" 40.535 te »% & », O = ; & 3 2 O és WY x S ag ae OS Say fe cate Ona ARCHITECTS MIOOAP DITCHFIELO Pi, ome Bomerah (Qid Pty (td) most Proposed Duplex wean 15 Duke Street SUNSHINE BEACH QLD Existing Survey Plan we tem Fénzoor i one a 0034 8008
Page 59
10. Roe LAND USE SECTION FEES =53] NOOSA . RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Change of Use - édelimpact cops 2410-00 521 Incdnsistent 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit 521 Extension of a Currency Period 521 Operational Works - Landscaping 521 @ Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour 522 ADVERTISING Purchase Advertised Applications 523 JETTIES Jetty Application Fee 524 Jetty Bond 51 (Category 4) BONDS Performance Bond . 51 (Category 9) SIGNS Registration Fee 222 seen FEE Search of Land Use Section file 112 Liquor Licensing Request 113 TOTAL $ 2470-00 Bomerabh (aw) Wty LtA NAME: —AtL A+ Yo Dew Farily rrvst ADbREsS: /(f- AwAday + dtehhuAd (orney Mery + Thonan Sheet, Nooseville ald 4567. FILENO: __Z007/ 1044 DATE: ¢-6- 7007 RECEIPT NO: LF I B63 : : Signature of TP Officer: “- Hf AUTHORITY NO: 14] 2007/1094 /1-
Page 60
CALCULATION OF FEES APPLICATION FEE TOTAL : FEES MCU - CODE ASSESSMENT Details of Development Consistent (9 - Anu hye Housing TYye inconsistent 3.0 2 Duylry FEE CALCULATION $ 2470-00 MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION
Used in these records
07/1045 MCU - Multiple Housing Type 2 Duplex -Middap Ditchfield Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.