Skip to the record
The only place to find full transcripts.

Council archive · source document

07/1045 MCU - Multiple Housing Type 2 Duplex -Middap Ditchfield Pty Ltd [As Published] · 132007.1045

of 60

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

NEeLekw we Checklist - Applications Involving Land
Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

 

 

 

1. APPLICATION FORMS pled’
mpeg eiliyt frit
11 Form 4 PartA wig J
cen duet need
1.1.1. Ensure that the form is fully completed. - opel x flor vale
4.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is vray Beno
1.1.2.1. If there are multiple owners, the consent of each owner is required. go 47 hy LfA.

1.1.2.2 If the owner of the land.is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information

1.1.2. Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.

1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [Y]
2. REFERRAL INFORMATION ,
2.4 Ensure that items 1-23 have been checked and/or completed with regard to referrals. ; [v_]

 

3. ENVIRONMENTALLY RELEVANT ACTIVITIES
3.1. Ensure that Part G is completed if EPA referral is required.

 

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

4. FORM 2™- REQUEST TO CHANGE APPROVAL

4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

5. PLANS ©

 

 

 

 

 

 

 

 

§.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationat ‘
Works) accompanies the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format andis - v4
unbound.

6. SUPPORTING INFORMATION ~ . oo toon te

 

 

 

 

 

 

 

6.1 Ensure that at least 6 copies of any report accompanies the application 6 for Reconfiguration
and Operationa! Works). if the application is accompanied by a covering letter, ensure that it is l
capable of reproduction.

6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. v

7° FREY OE me an

7.1 Ensure that the application fee, as determined from the Council’ $ adopted scale of fees, Y
accompanies the application or has been paid.

7.2 Ensure that the fee which has been paid is recorded on the application form. iY

 

 

S vere
of A

pret
of AL

 

Having completed this form and accepted the application, please deliver both to the following IDAS Application Receiving

trays:-

¢ Ifthe application is for a Material Change of Use exclusively ~AOP1's desk in the Land Use Section.

¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

e ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

«  {nall other circumstances - AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and OO NOT deliver the application tg Records.

 

 

 

SEP! g:\ant\forms\application checklist.doc
Full text of the other 59 pages

Page 2

 

315 May 2007 0834-1001
Noosa Council
PO Box 141
TEWANTIN Q 4565
ATTN: Manager
Land Development
@ Project: Multiple Housing Type 2 Duplex

15 Duke Street

SUNSHINE BEACH
Subject: Application for Material Change of Use RE CEIVED
Dear Sir/Madam, 1 JUN 2007

HOOSA swiee oer,

We attach the following for MCU Approval:- \ PCOunTE

 

e Forms A &D, IDAS Checklist

 

e Drawings:- 5 Copies Architectural SD 01-06
e Development Assessment Report

¢ Our Clients cheque for $2,570.00 being the appropriate application fee.
Yours faithfully

Peter Middap

Director

MIDDAP & DITCHFIELD PTY LTD
ARCHITECTS

LAP EE
ie Wey, G Whose He, ee. eS Lea
Pe

oli OF SF ORY eee OF Sere: es Bee Madere Com an

rie Bail: GRE S MaRdeew eet gw ME Cores Dac hare cL ats Ga Bt eo 06224 OO Og

Page 3

INDRGRATED PLANNING ACT 1897 Part A, Version 2.4, 29 May 2006

orm Application ides

 

 

 

+

Common details > —

eon
ye

 

The completion of all appficeble questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
Tequired, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 4.

 

 

 

 

 

 

 

 

 

 

Description of land 1. Street address: fncludinghouse number, street name, suburbVlocality name & postcode) (if applicable)

Hearted Hore dees ati lendie net { 15 Duke Street, Sunshine Beach 4567

SE orn ntay CR 2. Name of water body or watercourse, within which the development is proposed: (if applicable)

Aubenfer completing 2 2 omar [ NWA |

Gavelopmnert is propesed within a water or

@ vw 3. Loton plan description (eg. Lot 123 on RP 4567) / GPS coordinates:

Advice fo! {] Most land can be

toaetampan gv [ Lot 201 on RP 48113 ~]

feleeennert tte orttrough the | 4 The above description is for: (tick appicatie box)

However, if the tand on which the development is A (i) the land on which the developments proposed; or

the CT naa ran aeten * (2) (ii) the tand adjoining the water body or watercourse, within which the development is

watercourse) provide ~ proposed; or

edie eibsrrkepiiabiad Ci) the water body or watercourse.

® scoinrglodacert lan (fv ton Bay). 5. Shop / tenancy number: 6. Storey /tevel: 7. Total area of land: (m? or ha):
eng GI C7 des noteptytto | f | ] [ 612m? |

development is within a water body or watercourse,

SE Ee ee eles ages, __|8- Local government area in which the land is situated: (og. Esk, Hervey Bay, Woocoo et) (if applicable)

 

Nate: Areas below high water mark are pot within a [Noosa ‘|
focal government's area unless provided for under the
Port authority for the strategic port land or strategic port land tidal area on which the
development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
LNA
. Existing use of the land: (eg. vacant, single house, shop etc.)
| Single House J

. Proposed use of the land: (eg. 6 unit apartment building, 30 fot residential subdivision, ERA for aquacutture in
ponds with a total area of 7 ha for which wastes are released into waters etc).

|_ Multiple Housing Type 2 Duplex ' |

 

 

 

 

 

 

 

 

 

 

 

 

. Other parts of Form 4 completed as part of this application: (eg. Part D, Part /, etc)

[ Part D |

 

 

whan a part of Form T may apply refer to Guide 1,

 

 

 

 

Applicant details 13. Applicants name: 15. Contact person:

crhenntron nerbete ne ae { Middap Ditchfield Pty Ltd | [Peter Middap |
When signing and lodging this application 14. Contact number: 16. Facsimile number/e-mail address:
Teast enn he [ 07 5474 0877 ___| [075474 0906 |

 

manager, any referral agency & the Chief Executive
(her appfeabt) wi ety ont ifonmaton won 17. Postal address:

 

 

 

 

 

 

 

ithe spucant acorns cowactprson [Cnr Mary & Thomas Streets, Noosaville Q 4566 ]
fnust be shown, 18. Signature: 19. Date:
flicoe! ee
SO [Sl05 07 |
fi] L

 

Page 4

INTEGRATED PLANNING AGT 1997

Part A, Version 2.4, 29 May 2006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

Land owner's consent (if applicable} 20. Land owner's consent to the making of this application:
Series ae ain etoe camara yy. the Name Signature Date
written consent of the Land owners, if the application
() a material change of use, o Bomerah (Qld) Pty Ltd - BS (Adam Yes)
reconfiguration of a lot
£2) wt ond longer mark 8k win a Gi)
canal es defined under the Coesia Protecion end} Mol AULD SLO MT Ary |
Management Act 1995,0r a.
(¥) work on reil corridor land defined under the (ii)
Uo cr |
‘Section 3.8.1(2}(a) of the IPA provides that .
fendowner’s consent is net required for a mobile or (iv)
femporayERA, ff nnn nnn nen nee e eee cence cee eee ce eee ee tee denne ee ew enn n ee ee reece ee ee cee e ee ne eel eneeeceeeeecee nd
For more information refer to Guide 1, (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.4(5) of tha IPA rogues Sorcttene ot quarry material on State coastal fand under the Coastal Protection and Management Act 1995)?
resource entitlement (en
invo'e a presarbed Sie resource, EX] NO - goto 024 (J YES - go to a22
Soriano tte clon be raatiecs” 122. This application is accompanied by evidence: (dck eppfcable box)
whos evence of the remo enttement (1 @ of the allocation of, or entitlement to, the resource — attach evidence and go to Q23(v)
Refer to schedule 10 of the Infagrated Planning C1 (ii) the chief executive of the department administering the resource is satisfied the
Re ion 1998 th the f evidence i i: 7 i i} -
run rf St super " holedginy wie development is consistent with an allocation of, or entitlement to, the resource - go
ie! application.

(] (ii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23

Aatvice for completing G23 _..., | 23. Evidence of the resource entitlement
tee os Te aya fevers () Resource entitlement / authority details (vii) Official stamp of the department
Pewee im erence
Resources, Mines and Water is mandatory where the . applicable)
application Involves any water or riverine quarry (i) Name of delegated officer
Salon 329 lowe eee Cd
Section 3.2.1{5A) allows the resource manager to limit
the time the evidence may be used. Q73 (vi) must be ni ‘fi
o arctenco may be used (273 () mu (ii) Position of sessatt officer
(iv) Signature of delegated officer
(vy) Date
(vi) pe date of evidence Cea
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
‘This checklist does not apply if the appbcation requires {Yes (C1 NO - the assessment manager may refuse to accept this application on the
must be caved tr shee aplecton " grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
Ce ta rere Baa ante by deta Plan / Drawing / Report Number Title Date
Be kan dg ible sentoyorpie () $01 & SD02 Floor Plans 1 & 2 Feb 2007
notification to understand the scope ofthe proposal [fon n inner etn na rere n errr enn cc errr ee donee nee n cen n ee cere een e nner n ene b ener e nner a enced
and any potential impact. (i) $Dd3 Elevations Feb 2007
) $b04 Sections Feb 2007
(iv) SD05 Sections Feb 2007

 

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 4.

OFFICE USE ONLY (appficable to assessment manager's)

 

 

 

[Fem 7470.00 | rccmen [1-6 2007 [RMR punta He/A [REE [7907/7044 |
| Notification of Engagement of Private Certifier (Optional format)
To. Council. | have been engaged as the private certifier for the building work referred to in this application.

 

Date ofengagement / /

Accreditation Number:

_— Name,

Signature:

 

Page 5

INTEGRATED PLANNING ACT 1997 Part D, Version 2.0, 4 October 2004

Romi OacteometAppiedton = das)

 

     
 
  

 

Material change ofuse 3; ©

assessable against a local government's planning scheme: 3

 

 

 

 

 

 

 

 

an a,
Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a focal governments planning scheme.
Nature of the application 1. This application is for: (tick 1 or both if appticabte)
Adevelopment permit authorises (2 Preliminary approval for a material change of use of premises including conceptual
soe te hie poadapilet design for any associated works that require approval under the planning scheme (.e.
and does not authorise development to occur. Consideration of the proposal concept)
AND/OR
@ [XJ Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.
The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
theolonnascn i helralahet & [ Eastern Beaches Locality - Semi Attached Housing Zone |
application will be assessed.
3. Existing gross floor area: (itappfcable) [200 sq.m Dwelling to be demolished |
4. Are there any existing easements on the land?
no

(71 YES - attach plans of the focation and details of the purpose of the easement

5. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
vacant land to industry (tyre manufacturing) etc.)

 

 

 

 

 

| Single Residence to Multiple Housing Type 2 Duplex ‘|
6. Number of employees: | NA |
7. Qperating days and hours: | N/A |

 

 

 

Se arenes Ja, Sie cove
iotthec ten :
planning scheme 9. Gross floor area: 274.54 sq.m

against which the application will be
assessed,

 

 

 

 

 

 

 

 

 

 

10. Number of on-site car parking spaces: [ 5 |

11. Number of storeys / maximum height above natura! ground: 8.0m / 2 Storeys

12. Number of employees N/A

13. Hours and days the use willoperate [NIA |
Associated operational works details | 14. Details of associated operational works (eg. fandscaping, cut and fil drainage, road works etc.)
(if applicable) = -

| Landscaping, cut & fill, driveways |
PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY {applicable to assessment manager)

REFERENCE
DATE RECEIVED NUMBERIS

 

 

 

 

 

 

 

Page 6

© INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Aprit 2007

Fom 1 Oavepment Apeitection  — _ tas
IDAS Assessme
Checklist

(Formerly the “Referrals Checklist”)

IMPORTANT NOTE FOR ALL APPLICANTS: NOT \
1. This checklist was formerty referred to as the “Refarrats Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to € to this document'as the
“Referrals Checktis’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function. .

2. Under the IPA and IDAS framework, an application may require assessment by the local Councit and/or certain Queensland State entities (e.g, Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assesament by a Queensland State entity and may also assist the applicant to

determine the assessment manager’ for the application.

Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).

Itis the responsibility of the applicant to accurately complete this checklist.

Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005,

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify

any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the

application triggers referral coordination?,

9, — To assist you in answering the following questions a series of guides are available free from the IPA website www, ipa qid.goy.au. Guide 25 explains the rote of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006,

 

 

 

   

Wh

   
  

- 1 JUN 2007

ROM

 
    
  

    

ood

 

 

PSNOar

 

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006,

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more information refer to Guide 4, CJ (an environmentally refevant activity (ERA) for which a code for environmental compliance
the evpoaion muvee tec nat ene a, has not been made - complete Part G of Form 1

ministering authority’. (fii) a mobile or temporary ERA for which a code of environmental compliance has not been
{fan entity, other than the administering made - complete Part G of Form 1
authority, is the assessment manager for the & (iii) none of the above

application, the administering authority is a
concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Ky of Form 1
for approval where an allocation under the Water|
Act 2000 is required.

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checkiist (if applicable).

OFFICE USE ONLY (appiicatie to assessment manager)
DATE RECEIVED | _ REFERENCE NUMBERS |

 

 

 

1 The assessment manager is responsible for assessing and deciding an IDAS applicalion. The assessment manager for an ‘application is prescribed in schedule 8A of the IPA.
2 For addtional information refer to Guide 6 ‘Does my application trigger the referral coordination process?”
3 The ‘administering authority’ may be eilher the Environmental Protection Agency, Ihe relevant local government (for a devolved ERA} of the Queenstand Department of Primary Industries and
Fisheries (for 2 delegated ERA).
Page 1

Page 7

“INTEGRATED PLANNING ACT 1997
State-controlled road matters
For more information refer to Guide 3.
Untess you answered “none of the above” to Q2,

the application triggers referral to the Department
of Main Roads (OMR) as a referral agency.

In certain circumstances OMR will be an advice
agency, while in other circumstances OMR will

2.

IDAS Assessment Checklist, Version 20, 2 Apri! 2007
The application involves: (tick applicable box/es)
(1 @ development on land contiguous to a State controlled road and for -
1 (@) material change of use assessable against the planning scheme;

(1 (0) reconfiguring a lot unless -
« the total number of lots is not increased; and

 

 

be a concurrence agency. « the total number of lots abutting the State-controlied road is not increased;
peter 2 af the IF Resuleson wil assist you t C1 (©) operational work (not associated with @ material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}-
associated with accass to a State-controlled road; or
for filling or excavation; or
« involving the redirection or intensification of site stormwater from the fand, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
{X] (ii) development on land not contiguous to a State-controlled road and -
&] (a) material change of use -
« assessable against the local government’s planning scheme; and
* mentioned in schedule 5 of the iP Regulation and exceeding the thresholds set by
that schedule;
(LO (») reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1) (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b} above)-
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
(1 (ili) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. ; & (i) material change of use -
Unless ered “none of the above” to Q3, . .
th eppfeaton reqs eosessment by the (a) assessable against the planning scheme;
Dende Narn Rance cn Wet (b) ona let containing -
tan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is @ + if there is no property map of assessable vegetation for the lot - remnant vegetation;
opcurrence agency forthe plication in relation (c)_ where the existing use of the land is a rural or environmental use; and
if you ticked 039 or (i), your application requires (d)_ where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardiess of OO qi) reconfiguring a fot -
whether vegetation clearing is proposed or not. we
(a) on a lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger,
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
C1 (ii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1 .
(J (iv) none of the above.
Strategic port land 4. The application involves:

For more information refer to Guide 11.
Mf you ticked (j) - the retevant Port Authority is the
@ssessment manager for the appiication.

If you ticked {i} Queenstand Transport is a
concurrence agency for the application.

 

(1 @) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - comptete Part I of Form 1

0 Gi) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1

(ill) none of the above

 

4 Land contiguous to 2 State-controlied road s defined in schedule 14 of the iP Reguiation to mean land - if part of the Landis within 100m of the State-controlied road, or that is part of a future State-

controled road.

Page2

Page 8

* INTEGRATED PLANNING ACT 1997
Acid sulfate sols
For more information refer to Guide 10,
Unless you answered “none of the above” to 05,
the application requres assessment by
Department of Natural Resources and Water
(NRW).
Hf an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.

Major hazard facilities or possible
major hazard facilities

For more information refer to Guide 17.

If you answered “YES” to Q6, the application
requires assessment by the Department of
Emergency Services (DES).

ff an agency other than DES 6 the assessment
manager for the application, DES is a
concurrence agency for the application in
relation to this matter.

Water related development under the
Water Act 2000

For more information about items (a) - (f}, refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my application
Invowe assessment of a referable dam?

Untess you answered “none of the above” to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).

tf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
Felation to this matter.

Removal of quarry material from a 8.

watercourse

For more information refer to Guide 16.
Ifyou answered “YES" to Q8, the application
requires assessment by the Department of
Natural Resources snd Water (NRW).

If an agency other than NRW is the assessment
manager for the appfication, NRW is 2
concurrence agency for the application in
relation to this matter.

Note: Part G of Form 1 is required fo be
completed as the activity of removing quary
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

IDAS Assessment Checklist, Version 20, 2 April 2007

The application involves development on land situated in an identified® local government area

and where the surface of the land is: (tick applicable box)

(1 (i) below 20m AHD® and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or

(CO Gi) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material

£1 (iii) none of the above

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
{No

(C1 YES - complete Part L of Form 1

The application involves:
(1A) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)
(2) ina watercourse, lake or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Ke, Ks, Ke, Ks, or Ko of Form 4 whichever is applicable;
(C1 (>) for an artesian bore anywhere in the State, no matter what the use - complete Part
Kt of Form 1;
Ci (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
US®@ - complete Part K; of Form 1;
(0 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Kx of Form 1;
(1 €e) for taking overland flow water in certain areas covered by a water resource plan
- complete Part Ks of Form 1;
(CJ (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kro of Form t
(1 @) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
[XJ (ii) none of the above.
Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?
NO
(71 YES - complete Parts Ky and G of Form 1

The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Surdekin, Burke, Bumett, Cabootture, Cains, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Codtoola, Doungias, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirtum Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redand, Rockhampton, Sarina, Thutingowa, Tiaro, Torres, Townsville, Whitsunday.

6 Austratian Height Datum (AHD).

7 The declared ground water areas are sted in Guide 13 Deyelgoment in a dectared catchment area.

8 Referable dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA.

Page3

Page 9

+ INTEGRATED PLANNING ACT 1997

Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about presorbed tidat work in
focal government tidal areas refer to Guide 24,
Unless you answered “none of the above” to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).

9.

(DAS Assessment Checklist, Version 20, 2 April 2007

The application involves operational work that is: (tick the applicable box/es)

oO

oi
Diy

idal work'° as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; oF

tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; oF

canied out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any bowes (a) to (i) below are ticked.

 

fen agency other Man EPA'S the assessment [J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
manager for the application, EPA a other than those works in tidal water) Where the development has been determined not
Sanaarrenta agency fr the application in to be assessable against the Water Act 2000;
Local government is the assessment manager (1) constructing a cana!'? intended to be connected to tidal waters;
for all prescribed tidal work. . a
(1 ©) constructing an artificial waterway;
[@) reclaiming land under tidal water,
[-] (e) disposing of dredge spoil or other sofid waste material in tidal water,
(1 (f) interfering with quarry material on State coastal land above high-water mark;
[1g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(1 (h) removing or interfering with coastal dunes on land, other than State coastat land,
that is in an erosion prone area and above high-water mark;
(C1@)__ constructing a bank or bund wall to establish a ponded pasture on tand, other
than State coastal land, above high-water mark; or
(1 (iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable boxes)
mark

For more information refer to Guide 18. For

more information about prescribed tidal work in

local government tidal areas refer to Guide 24.

Untess you answered “none of the above” to

Q10, tha apphcation triggers referral to
jeenstand Trans

Qid} as a concurrence agency.

Local government is the assessment manager

for all prescribed tidal work.

Coastal management

For more information refer to Guide 18.

Unless you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

if an agency other than EPA is the assessment
manager for the application, EPA is a

concurrence agency for the appfication in
relation to this matter.

 

11.

ow

tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

LD (i) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; or
C1 (ii) carried out within a coastal management district'S under the Coastal Act and for -

div)

[1 @) disposing of dredge spoil or other solid waste material in tidal water - complete Part

MofForm 1;
reclaiming land under tidal water ~ complete Part M of Form 1; or

Cb)
C1 (©) constructing a canal'2, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

none of the above.

The application involves: (tick the applicable boxes)

OW
Oi

Odi)
Ow)
Kl)

a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district’

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA'® of at least 1000m2

« the enlargement of the GFA of existing premises by more than 1000m2

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot” assessable under schedule 8 of the IPA and in connection with
the construction of a canal! - complete Part M of Form 1

none of the above

 

10 Tidal work is defined in sch 10 of the IPA,

11 Prescribed tidal work is defined in the Coastal Protection and Management Reguiation 2003 and includes certain tidal works completely or partly within @ local government tidal area,
12 Canal means canal as défined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA,

14 Prescribed tidal work is defined in the Coastaf Protection and Management Regulation 2003 and includes certain tidel works completely or partly within a focal government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
Coastal management district under section 47(2) of that Act.

16 GFA ts defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the seconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for ihe aperational works to construct ihe artificial waterway.

Page 4

Page 10

* INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24,

If you answered “YES” to Q12, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -

© within 200m of a shipping channel or an entry
and exit shipping corridor for the port

® within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

» within 1000m of a planned port facility
identified in a and use plan approved under
the Transport Infrastructure Act 1994,

{n all other situation the Port Authority is an

advice agency.

IDAS A nent Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark’® and within the limits of a port
under the Transport infrastructure Act 19947
{No

[11 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

Marinas

For more information refer to Guide 18. For
information ebout whether @ marina is prescribed
tidal work refer to Guide 24. The local
government is the assessment manager for all
prescribed tidal work.

lf you enswered "YES" to Q13, the application
triggers referral to Queenstand Fire and Rescue
Service as an advice agency.

Tidal works in strategic port land tidat
areas
For more information refer to Guide 18,

Unless you answered "NO" to Q14, the relevant
Port Authority is the assessment manager for the
eppication and the Environmental Protection
Agency (EPA) and Queenstand Transport (QT)
‘are concurrence agencies for the application.
Heritage

For further information refer to Guide 49.

If you answered "YES" to Q15, the application
triggers referret to the Queenstand Heritage

Council as concurrance agency for the
application.

Unless you answered “none of the above” to

13.

=

15.

4,

Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?

KINo

{7 YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work

Ooes the application involve tidal works within a strategic port land tidal area20?
BJ No

(YES -complete Part M of Form 1

Does the appfication involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

No
(7 YES - complete Part C of Form 1

15(b) The application involves: (tick applicable boxes)

 

 

Q15(b), the application involves referral to the C1 () — amaterial change of use assessable against the planning scheme and the lot shares a
Environmental Protection Agency as an advice common boundary with a protected area or registered place under the Queensland
agency for the eppicaton Heritage Act 1992;
(J (i) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
1 (iii) none of the above.
Declared catchment aress 16. The application is in an area declared to be a catchment area under the Water Act 2000 and

For more information, including a lst of the
dectared catchment areas within Queenstand,
tefer to Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

Hf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

 

involves: (tick the applicable box/es)

(OQ) _ reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
C1(ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
[1 (iii) none of the above

 

48 High water mark is defined in the Coasta! Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
19 Marina is defined in the Transport Operations (Maritime Polution) Regulation 1998.
20 Strategic port land tidal areas ate the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page S

Page 11

» INTEGRATED PLANNING ACT 1997

IDAS A: ment Checklist, Version 20, 2 April 2007

 

 

 

Contaminated land 17. The application involves: (tick the applicable bowes)
Applications involving material change of use (2 @ reconfiguring a fot for which all of part of the premises are —
nfguring a tot may trigger thi
er nao etmay Mage (a) premises mentioned in the IPA, schedule 8, part 1, table 2-
For more information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered ‘none of the above” to « item 6, including the exemption otherwise provided for by paragraph (e); or
Q17, the appiication requires assessment by the ei it i i i i init r
Ewironre tal mn Agenty (EPAY Hon item 7, including the exemption otherwise provided for a mining activity or petroleum
agency other than EPA is the assessment activity, or . . .
manager for the apptication, EPA will be a (b)_ inan area for which an area management advice has been given for unexploded
ce for the application i
rebtonte the rete ehivaton ; ordnance - complete Part N of Form 1

Oi) a materia change of use —

{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or

(b) assessable against the planning scheme and if ail or part of the premises is in an area

for which an area management advice has been given for unexploded ordnance -

complete Part N of Form 1

EX Gi) none of the above

Electricity infrastructure 18. The application involves: (tick the eppticable box/es)
Far more information refer to schedule ofthe [P (1@) reconfiguring a fot where any part of the lot is -
Unless you ensw ered *none of the above" to « subject to an easement in favour of a distribution entity or transmission entity under the
18, the application triggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under
‘agency to which the easement is aranted in that Act; or
fayour of as advice agency. « situated within 100m of a substation site;

LU Gi) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

« any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

C1 (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

LC (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

the work is located wholly or partly within 10m of a substation site;

[XJ (v)_ none of the above.

Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure

Applications invotving development on fand
designated for community infrastructure may
trigger this referral.

For more information refer to schedule 2 of the
IP. lation.

If you answered “YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
\fan agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter,

 

designated for community infrastructure?
{i) intended to be supplied by a public sector entity; and
(li) on land not owned by or on behalf of the State; and
{iii) other than development —

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
NO
CU Yes

 

Page 6

Page 12

“. INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For more information refer to schedule 2 of the
1P Regulation

Refer to Chapter 2, part 5A and schedule 10 of
the integrated Pianning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions,

Unies you answered “none of the above™ to
Q20, the application requires assessment by the
Office of Urban Management (OUM).

Fisheries matters

For more information refer to schedule 2of the IP
Reaulation.

Unless you answered “none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
(DPI&F),

\fan agency other than DPI&F is the assessment
manager for the application, DPI&F is a
concurrence agency for the application in
relation to items (i) - (rv) and an advice agency
in relation to item (v).

 

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable boxes) -
C1 i) a material change of use of premises -
(a) __ in a Major Development Area in the Urban Footprint for -
00 @  anurban activity -
(1 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(1 inan area net included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the retevant planning scheme

OO (i) intensive animal husbandry, or
(2 (ii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
OO @  anurban activity and not specified in section 2.4(2); or
C1 (i) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -
0 (i) anurban activity and not specified in section 2.10(2);
(1 (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
(1 (ii) Intensive animal husbandry
C1 (ii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
Ed (ii) none of the above
21. The application involves: (tick the applicable boxes)
[1() anassessable material change of use for aquaculture - complete Pat 01 of Form 1;

CU (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;

Lili) assessable operational work completely or partly within a declared fish habitat area-
complete Part Oz of Form 1;

C1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O, of Form 1;

[1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

[1 (vi) none of the above.

 

Page7

Page 13

L INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Regulation,

Unless you answered “none of the above", the
application triggers referral to QT as a

IDAS nent Checklist, Version 20, 2 April 2007

22. The application involves: (tck the applicable bowes)—

(J) (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

 

concurrence agency. D1 (ii) reconfiguring a tot—
Cifa) on land thatis completely or partly within a public transport corridor, and the
total number of lots increases;
(1b) _ on land thatis completely or partly within a future public transport corridor or
an airport's public safety area;
C1 (©) ontand that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater,
C(¢) _ for a residential purpose within the 25 ANEF contour for an airport:
[1 (e) _ for a residential purpose resulting in 100 or more allotments.
CO (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
[1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor,
(1) (&) _ will resutt in work that encroaches into an airport's operational airspace.
EX] {iv) none of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—

For more information refer to Guide 23, schedule
8A of the IPA & scheduls 2 of the IP Regutation.
Unless you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.

Moonie to Brisbane pipeline

For more information refer to schedule 2of the IP.
Reguiation.

Untess you answered “none of the above’, the
application triggers referral to the holder of
Pipeline licence No 1 issued under the Petroleum|
Act 1923, currently Santos QNT Pty Ltd, for
advice.

 

(1 @ a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

0 (il) reconfiguring a fot—

C1 (@) cn land thatis completely or partly within a future public transport corridor,

future railway land or a railway tunnel easement;
[1 (b) on land thatis within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater,
Ce) on land that abuts rail corridor land, commercial corridor land or future raihvay
land, and the total number of lots increases;
(J) on Jand that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(J) ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
[1 _ fora residential purpose resutting in 100 or more allotments.

(7) (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m®, on land that—

(1 (@) __ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

(1 (6) _ is completely or partly within future raitway land, or a railway tunnel easement

(1) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.

{X (iv) none of the above.

24. The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es}—

(1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement

O1 (ii) reconfiguring a lot

(] (ii) operational work assessabie against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

1X] (iv) none of the above.

 

Page &

Page 14

+” INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the IP Regulation.

Unless you enswered “none of the above’, the
application requires referral to the Environmental
Protection Agency es a concurrence agency.

Wild river area

Fer more information, refer to Guide 27

Ifyou answered YES to Q26, you must also
complete section 2 of this checklist. This wil
enable you to determine @ your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in @ wid river area.
Note: Development can be ‘prohibited in a wild
river area because the application cannot be

IDAS Assessment Checklist, Version 20, 2 April 2007

25. The application involves: (tick the applicable box/es)—

DO (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -

(1 @@) clearing of native vegetation over an area greater than 2500m?;

(1b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;

C1) anextensicn to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;

() (d)_ extracting gravel, rock or sand from an area greater than 5000m?;

(1 (e) excavating or filling an area greater than 5000m?,

(1) () additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

(Gi) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -

(J (a) an increased number of lots;
()(b) clearing of native vegetation over an area greater than 2500m?.

C (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

(1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

(1 (a) clearing of native vegetation over an area greater than 2500m?,
[1 (b) extracting gravel, rock or sand from an area greater than 5000m?,
1) excavating or filling an area greater than 5000m?.

[I (v) none of the above.

26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?

&INO
ves

 

accepted by the assessment manager,

Preliminary Approval 27. Does the application involve a development for which preliminary approval is sought under
Ifyou answered YES to Q27, the application Section 3.1.6 of the Integrated Planning Act 1997?

triggers referral to the Department of Local

Government, Plenning, Sport nd Recreation es | EXINO

an advica agency. 0 YES

 

Wetlands

Domestic activity meens the construction or use
ofa single residence on @ kot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker's residence, granny flat, building or
structure used for a home business.

Note: Wettand is defined in the integrated
Planning Requtation 1998.

Unless you answered “none of the above” to
028, the application involves referrat to the
Environmental Protection Agency as an advice
‘agency for the application.

28. The application involves: (tick the applicable boxes) -

(14) a material change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
(1 (i) _ reconfiguring a lot -

In or within 100m of a wetland that will result in
(1 (a) more than 10 lots being created; or
LO (b) lots less than 5 hectares;

£1 (iii) none of the above

 

Page

Page 15

a

+” INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which tend is
used in cites or towns, including residential,
industriel, sporting, recreation and commercial
Purposes, but not including environmental,
conservation, rural, natural or widemess area
Purposes”,

Unless you answered “none of the above” to
Q29, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

IDAS Assessment Checklist, Version 20, 2 Aprit 2007
29. The application involves: (tick the applicable box/es)—
(1@) a material change of use for urban purposes that is in or within 100m of any of the
following -
Ci (a) a protected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
(J (b) a State forest or timber reserve under the Forestry Act 1959;
[1 (©) amarine park under the Marine Parks Act 2004:
Cd) arecreation area under the Recreation Area Management Act 1988;
Ci (e) aworld heritage area fisted under the World Heritage Convention:
(1) Brisbane forest park under the Brisbane Forest Park Act 1977.
(1 @ii) reconfiguring a lot if -
C1 @) any part of the lotis situated in, or within 100m of, any of the following -
C1() a protected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
(qi) a State forest or timber reserve under the Forestry Act 1959;
OO (ii) a marine park under the Marine Parks Act 2004;
LI (iv) arecreation area under the Recreation Area Management Act 1988;
CO) — aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(J (b) the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than 5ha;
& (ii) none of the above.

 

Page 10

Page 16

DEVELOPMENT ASSESSMENT REPORT
MATERIAL CHANGE OF USE TO DUPLEX

LOT 201 RP 48413
Parish Weyba, County March

on behalf of
BOMERAH PTY LTD

June 2007

Applicant
MIDDAP DITCHFIELD PIL
CNR MARY THOMAS STREETS
NOOSAVILLE

 

Page 17

Page 1

CONTENTS

4. Executive Summary uu... esce cscs ssascsesessenseaseaaeaeseeseeeseaeessansseeeeaesesaneenaees 2

 
 

 
 
  
 
  
 
 

1.1. Site Details... eee ceeeeeneeeseceeeeeeeeeseeeenseeeeseaeeeeesaeesesssecccssesestssseseneresensies 2
1.2 Application Details 20.0.0. ceeneeceeeeee eee ceeeeeseeeeesseessesceceeseceenseteeeniresensaes 2
2. IMtrOGUCTION 00... e ete eceneenenecneseneensaeeeseatcnaacceceesesuaeenecensaeeeeeseeeessssenreces 3
3. Site & Surrounding Characteristics... cesesesccessceeeseseeessseeesseeeeseereese 4
3.1 Site Description... eee eececeececeeseeceeseeeetsseeceesseeeesseeecssssescsseesensseerensueseees 4
3.2 Surrounding Development. ................e.ceeccecceceeee cee ceeeeeeeeeceseeetatecseeesstensasessensnese 4
4. Proposal Description 2.0... ee cccssseeeesessceeesesscseeeeesscsseceeecenssnseeeesavsesseanen 4
5. Planning Framework........cccccscsssecsseseseeseesenseseenseessaeseseesaeeeseesensesseeesanesaneaseness 4
5.1 The Noosa Plan oo... cc ccceccccecsecssceeeeseeeesseeseseeeesasescesseeecseecessseecerseesennssesensresenss 5
6. Planning ASSeSsSMent............ ce eeeeceeeeseseceeetessaseeeseeessseeseceeeseceeeeteassneusenastesses 5
6.1. Codes and Planning Scheme Policies .............ccccccccccccseceeesscecsenscccensseceenseeeenes 5
6.2 Eastern Beaches Locality Code ......... 5
6.3 Residential Uses Code.............. 14
6.4 Landscaping Code... .15
6.5 Driveways and Carparking Code.............00...000..00 .20
6.6 Earthworks Code oi. ceceececessneeesseeeeeteeeeeeee .23
6.7 Erosion and Sediment Control Code.. 25
6.8 Existing Services Code... 26
6.9 Transport, Roads and Drainage Code... cccccecseccecssseecesseeveseserneseusetenes 27
6.10 Waste Managment Code 0.00.0... cece ccc cceccceeesseeeeesseecenseseecsssesersaversasersues 32
6.11 Water Sensitive Design Code oe .35
6.12 Water Supply & Sewerage Reticulation Code 2.0.0.0... ceesccecesscceessseseseeene 36
TZ. COMCIUSION L000... ceeececetcenessneeeeseeesceeeeeeeeseceeeenesseesteeseeaeceeessesceeeeensesunaeesenseeens 38

ATTACHMENTS

Attachment 1 Proposal Plans

 

Material Change of Use Bomerah Pty Ltd
15 Duke Street, Sunshine Beach June 2007

Page 18

1. EXECUTIVE SUMMARY

1.1 Site Details

Page 2

Sa : —

 

 

 

 

 

 

 

 

 

Address 15 Duke Street, Sunshine Beach
Contact Peter Middap
Middap Ditchfield Architects
Cnr Mary & Thomas Streets
NOOSAVILLE QLD 4566
Phone: 5474 0877
Fax: 5474 0906
Email: [email protected]
Property Owner Bomerah Pty Ltd
Location Sunshine Beach
RPD (Subject Land) Lot 201 RP 48113
Subject Land Area 612m?
Local Authority Noosa Shire Council
Current Use Residential Uses

 

 

1.2 Application Details

Neier OPCS

 

Application Type

Material Change of Use to Residential Housing - Multiple Housing Type 2
Duplex

 

Planning Classification (planning
area, precinct class etc)

Planning Area - Eastern Beaches Locality

Zone - Semi Attached Housing

 

Overlays:

Part 7 Eastern Beaches Locality

 

Level of Assessment

Code Assessable

 

Referral Agencies

 

 

Nit

 

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd

June 2007

Page 19

Page 3

2. INTRODUCTION

This report has been prepared on behalf of Bomerah Pty Ltd in support of a Development Application for a
Development Permit for a Material Change of use of premises to allow for Multiple Housing Type 2 Duplex

The subject land is situated at Lot 201 RP 48113, 15 Duke Street, Sunshine Beach. The proposal plans
are shown at Attachment 1.

The report concludes with the recommendation that Council approval is warranted subject to reasonable
and relevant conditions.

 

 

Material Change of Use Bomerah Pty Ltd
15 Duke Street, Sunshine Beach June 2007

Page 20

Page 4

 

3. SITE & SURROUNDING CHARACTERISTICS

3.1 Site Description
The subject land is described as Lot 201 RP 48113, 15 Duke Street, Sunshine Beach. and contains an
area of 612m?. The site currently contains a building occupied by a single residence.
Vehicular access to the site is currently via an entrance off Duke Street.
Existing vegetation to the front is not significant and will be removed for the development. The rear of the
site is very steep (1:3) where existing vegetation will be kept where undisturbed by cuts and enhanced so
as to disturb the dune as little as possible.
Trees on the southern boundary are to remain.

3.2 Surrounding Development
The surround development is generally duplex dwellings and units to the south and single detached
housing to the north.

4. | PROPOSAL DESCRIPTION
The proposal is for the demolition of the existing building and the erection of a new 2 storey duplex
development with some basement area.
Proposed Uses
Each unit in the duplex will be separately titled and designed for permanent living.
Design
The proposal is to construct a two storey duplex which steps up the site just under the maximum permitted
height of 8.0m. It will be finished in a combination of rendered block and off form concrete with timber and
light weight panelling to the upper level. The roof form is a low pitch with overhangs but is broken in its
form to reduce the impact of the building to it's neighbours.
Sunshine Beach is not dominated by any one architectural style and the proposed development is
designed to compliment the already rich diversity of styles in the area but maintain the scale and
landscaped character of the area. The style is typical of South East Queensland sub-tropical design.
The building will be of a modern design with flat roofs stepped down the hill. The extensive glazing
combined with the modern materials will blend in well with the range of designs, styles and materials within
Eastern Beaches Locality.
Access and Car Parking
Vehicular access to the site will be from Duke Street which will be narrowed slightly to be 3.6 metres wide.
This access will provide both the entry and exit to/from the site. Parking for 5 vehicles is proposed. This
consists of 4 garaged and 1 visitor park.
There is a turning bay on site so vehicles leave in a forward direction.

5. PLANNING FRAMEWORK

Material Change of Use Bomerah Pty Ltd

15 Duke Street, Sunshine Beach June 2007

Page 21

Page 5

5.1. The Noosa Plan

The Noosa Plan commenced on 3% February 2006 and is the relevant planning scheme for the area.
Within this plan, the site is located in the Eastern Beaches Locality, and in the Semi-Attached Housing
Zone. The proposed uses are consistent with the Semi-Attached Housing Zone.

6. PLANNING ASSESSMENT

6.1. Codes and Planning Scheme Policies
The Codes applicable to this proposal, as contained in the Noosa Plan are as follows:

e Eastern Beaches Locality Code
e Semi-Attached HousingCode
Residential Uses Code

e Landscape Code

« Engineering Works Code

The site is also washed over by an Overlay which identifies the site as subject to Natural Hazards:
Landslide & Flooding. However, a geotechnical engineer will be engaged to design the structures
appropriately for the site.
Our assessment of the application against each of these relevant codes is set out below.

6.2 Eastern Beaches Locality Code

Development complies with the Eastem Beaches Locality Code if it:

(a) fulfils the Specific Outcomes for the locality; and
(b) is a consistent use and fulfils the specific outcomes for the Semi-Attached Housing Zone.

(a) Specific Qutcomes and Probable Solutions for the Eastern Beaches Locality

 

 

BS) 71.) 011: eS Sc SRL Oe SLUT EE Ur a ed
7.9 Effects of Use
Amenity
O7 Uses are located, designed and operated to | No solution provided ¥ The proposal is for a
avoid significant adverse changes to the light, air residential use and is
quality, noise, accessibility or other conditions surrounded by similar uses. It
enjoyed by users of associated, adjoining or will therefore have no adverse
nearby uses. effects on these properties.
Character and function of the David Low Way
02 The vegetated character of the David Low No solution provided v NIA

Way is protected and new development
recognises and protects the function, capacity
and efficiency of the David Low Way as the
major north — south link throughout the coastal

 

 

part of the shire.

12.10 Built form

Density v The density of development
03 The density of development within the site No solution provided is consistent in scale with
area— surrounding development.

a) is compatible with surrounding development,
b) does not exceed—

 

 

 

 

 

..li for Semi-Attached Housing Zone “has 2 x 3 bedroom units (6.6
B. for sites between 600m2 or_more — persons)
Material Change of Use Bomerah Pty Ltd

15 Duke Street, Sunshine Beach June 2007

 

Page 22

Page 6

 

6.6 persons, with the exception of the
following sites which have and allowable
population density of 320 person per
hectare exclusively for the purpose of a
visitor hostel -

* — Lot 295 on RP883860 at 14 Duke
Street, Sunshine Beach;

e Lots 339-341 on RP48111 at 1-3
Douglas Street, Sunshine Beach;

e Lots 92 - 94 on RP94566, at the
corner of Wildflower and Hill Streets,
Sunshine Beach; and

e Lots 8, 9 & 10 on P9315 and Lot 76 on
MCH2969 at 215 - 219 David Low
Way, Peregian Beach

c) has a low site impact to enhance the
opportunity to maintain natural site
characteristics, including native vegetation and
natural landforms.

“has low impact, maintaining
the landforms and will be
landscaped to enhance the
existing native vegetation.

 

Height
04 Buildings and other structures—
a) are low rise and present a building height
consistent with structures on adjoining and
surrounding land;
b) do not exceed a maximum height of -

iii, For any other zone — 2 storeys
c) do not visually dominate the street, adjacent
properties surrounding spaces or the existing
skyline;
d) preserve the amenity of surrounding land
including access to sunlight;
e) respect the scale of surrounding vegetation;
and

$4.1 Buildings and other
structures have a maximum
height of-

e) in all other zones - 8m

¥ The proposal has a
maximum height of 80
metres and two storeys.

Unit 2 contains a basement
which generally complies with
the definition. A small area of
three storey exists but this is
not visible from outside the
building and does not increase
the visual bulk and remains
under 8.0m above natural
ground.

All levels and heights comply at
the extremities of the building.

 

Setbacks

05 Buildings and other structures are
appropriately designed and sited to—

a) provide amenity for users of the premises as
well as preserve the visual and acoustic
privacy of adjoining and nearby properties;

b) provide adequate distance from adjoining
uses;

c) preserve any existing vegetation that will
buffer the proposed buildings;

d) allow for landscaping to be provided between
builidings

e) maintain the visual continuity and pattern of
buildings and landscape elements within the
street;

f} protect the natural character and visual
amenity of the beachfront

$5.1 Buildings and
structures comply with the
minimum building setbacks
specified in Schedule 1 -
Minimum Boundary
Setbacks.

¥The proposal complies with
the standard minimum setback
requirement except:-

- parts of the roof overhang
encroach a maximum of 600
into the side setbacks

and

- the entry doors have a roof
Structure at the lower level
which is 2.4m above ground,
2.4m long and encroaches to
within 900 of the side
boundary.

The existing vegetation in the
setback to the SW will be
retained and enhanced where
not disturbed by construction.
The side and road setbacks will
be planted in accordance with
the landscape code.

 

 

Site cover, gross floor area and plot ratio

O6 The site cover, gross floor area and plot ratio
of buildings and other roofed structures—

a) results in a building scale that is compatible
with surrounding development;

 

No solution provided

 

“The proposal complies with
a,b,c,d & e — refer to drawings
for detail .

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 23

Page 7

 

b) does not present an appearance of bulk to
adjacent properties, roads or other areas in

the vicinity of the site;

c) maximises the retention of existing vegetation
and allows for additional soft landscaping
between buildings;

d) allows for adequate area at ground level for
outdoor recreation, entertainment, clothes
drying and other site facilities; and

€) facilitates onsite stormwater management and
vehicular access.

07 Site cover does not exceed- Site cover is 39.1%
b) for Semi-Attached Housing Zone - 40%

08 For Mulitple Housing Type 2 buildings have The plot ratio is 0.449 : 4
a maximum plot ratio of -

c} 0.45:1

09

010 For the Detached Housing Zone and Semi- Soft landscaping is 39%

Attached Housing Zone — soft landscaping is
provided and retained over a minimum of 20% of
the site area.

 

  

 

 

 

 

 

 

 

011
Flooding and Drainage
012 Buildings and other works are designed and | $12.1 Floor levels for ¥ NA.
sited to— habitable rooms
a) provide flood free access to premises and are—
flood free habitable areas; a) for areas where minimum
b} allow only minor, short term and infrequent floor levels are available—
flooding of non-habitable areas; not less than the specified
c) ensure drainage does not adversely impact level;
upon other premises; and b) for areas where flood
d) ensure filling or excavation does not modelling is available—a
adversely impact upon other premises by— minimum of 500mm above
i, causing ponding of water on the site or the modelled flood level; and
nearby land; c) for areas where flood
ii. increasing flooding, which adversely modelling is not available, a L.
affects the safety or use of any land minimum of 500mm above cond
upstream and downstream; and the highest known flood Le
ili. adversely affecting the flow of water in level; ste
any overland flow path. AND /
$12.2 Where Council
infrastructure is available—
a) any drainage (from
buildings and land) flows to
that infrastructure; and
b) the infrastructure has the
capacity to accept any
additional loading;
Roof form
013 Roof forms— $13.1 The main roof of the ¥ The proposed development
a) contribute positively to the focal skyline; building has a roof pitch no has a roof pitch of 1° The
b) complement the low density character of the less than 5 degrees and has | edges however are softened by
locality; roof overhangs a minimum roof overhang, external gutter
c) do not present an appearance of excessive of 600mm wide; and timber clad fascias. The
bulk to side neighbours; AND roof style meet the roof form
d) use simple traditional roof designs; and $13.2 Buildings and
Material Change of Use Bomerah Pty Ltd

15 Duke Street, Sunshine Beach June 2007

Page 24

Page 8

 

€) do not create opportunities for residents to
overlook the private open space areas of
neighbouring properties.

structures do not include roof
top terrace areas.

requirements however as it:~

a) contributes positively to the
local skyline by being broken
into a number of levels which
step down the hillside reflecting
the slopes of the dune and

b)it compliments the low
density character of the locality
by maintaining — setbacks
sproviding overhangs and
breaking into several levels and
c) assists in reducing bulk to
neighbouring properties and

d) each level is a simple flat
skillion which is typical of some
traditional beach side designs
and

€) does not provide opportunity
for residents to overlook the
private open areas of
neighbouring properties.

There are no rooftop terrace
areas proposed.

 

Sloping sites

014 Development on s/oping sites-

a) is responsive to the natural topography of the
site and minimises cut and fill;

b) does not visually dominate the hill slope or
interrupt the skyline;

c) is integrated with the natural site

d) for Multiple housing, takes the form of small
separate buildings.

$14.1 Buildings and
associated accessways are
not constructed on land with
a slope greater than 25% (1
in 4);

AND

$14.2 Buildings are of split
level design that step down
the slope or have suspended
floor construction;

AND

$14.3 Cut or fill is less than
1.5m in depth;

AND

$14.4 The distance between
the ground and the lowest
part of the floor of the
building does not exceed 3m
to avoid large under-building
areas;

AND

$14.5 Buildings present no
more than-

b) if in any other zone — 2
storeys at any one point
when viewed from the street

The proposed development site
is relatively flat for approx 25m
and then rises sharply (1:3) for
the remaining 15m approx.
The design is such that it:

a) is responsive to the natural
topography by stepping up the
slope which minimises cut and
fill although it is greater than
1.5m,

b) does not visually dominate
the hill slope or interrupt the
skyline because the hill keeps
rising to more properties
behind

c) is integrated into the natural
site by maintaining landscape
zones in the side setbacks.

d) takes the form of separate
buildings = by _ introducing
different floor plans and
different levels for each unit,
stepping the facades and
recessing the garage doors.

 

Entrance Statement

015 A ssignificant entrance statement is
established at the southern entrance to Peregian
Beach via the David Low Way to enhance and
emphasises the sense of arrival to the coastal
area of the Noosa Shire from the south

v NA

 

12.11 Environment, Conservation and Recreation

 

 

Environment and cultural heritage values
016 There are no significant adverse effects on

 

No solution provided

 

v The site has already been

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 25

Page 9

 

biodiversity, native vegetation, native fauna
habitat, landscape quality, water quality or
cultural heritage values, including those related
to—

a) changes to natural drainage;

b) disturbance of the wetland system;

c) management of landslide and fire risk;

d) erosion and the transport of sediments off
site;

e) unmanaged public access;

f effluent disposal;

g) changes to fauna habitat and behaviour; and
h) disturbance of buildings and features,
including natural features, of cultural heritage
significance.

developed and this proposal is
for the replacement of the
existing building with one of a
significantly higher quality.
Apart from the vegetated slope
to the rear of the site, which will
be retained as part of this
proposal and some moderate
size trees on the south east,
there is no other native fauna
habitats, landscape quality,
water quality or — cultural
heritage values on the site.

 

Open space network

017 An integrated open space network is
established, enhanced and protected throughout
the locality to—

a) provide for both passive and active
recreational pursuits;

b) provide connectivity for pedestrians and
cyclists;

C) provide habitat connectivity for wildlife;
d) protect watercourses and drainage lines,
€) protect vegetation on steep slopes; and
f) form a scenic backdrop for residential
development.

$17.1 Open space corridors
and existing native
vegetation in areas indicated
in Schedule 5 ~ Map 4 are
protected from fragmentation
and encroachment by
development.

Y The proposal is not near
land identified on Map 4 as an
open space corridor or existing
native vegetation and will
therefore not impact on it.

 

Pedestrian and bicycle pathways

018 Safe and convenient pedestrian and bicycle
pathways are provided and retained between
and around key destinations.

$18.1 Pedestrian and
bicycle pathways are
provided and retained where
indicated in Schedule 5 -
Map 2;

AND

$18.2 Contributions toward a
Pathways Network are
provided in accordance with
PSP20.

Y An existing pedestrian and
bikeway path is already located
in adjoining streets. This will
not be disturbed as part of this
proposal, except to provide a
new footpath which will create
an improved environment for
the users.

 

Beach Access Points
019

AND

020

No solution provided

¥ NA

 

 

Air Craft Safety
021

AND
022
AND

023

 

 

¥ NIA

y N/A

¥ NA

 

(b) Specific Outcomes and Probable Solutions for the Semi-Attached Housing Zone

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 26

sy ¢; 9)
| 7.16 Consistent uses

Page 10

 

032 The following defined uses and use
classes are consistent uses and are located in
the Semi-attached Housing Zone-

(a) Home —based business Types 1 or 2;

(b) Home —based business Type 3;

(c) Commercial business Type 1 or 2

(d) Detached House;

(e) Multiple Housing Types 14 or 2;

(f} Visitor Accommodation Type 1

(g) Visitor Accommodation Type 4

No solution provided

v¥ The proposal is for (e)
Multiple Housing - Type 2
Duplex which is a consistent
use within the Semi-attached
Housing Zone

 

7.17 Inconsistent Uses

 

 

 

033
v NIA
7.18 Effects of Use
Visitor Hostels
034 v NIA

 

7.19 Built Form

 

Streetscape character

035 Buildings and other structures—

a) contribute positively to the streetscape
character by addressing the street and adding
visual interest through stepping the front
facades;

b) have a bulk and architectural scale that
does not dominate the streetscape or detract
from the visual amenity of adjoining
properties;

c) present as a small building of a domestic
scale within a landscaped setting; and

d) present well articulated facades where
garages or carports are not the dominant
visual element when viewed from the street;

 

 

$35.1 The main entrance of the
building faces and is
recognisable from the street
AND

$35.2 Buildings and other
structures are designed to -
a) have maximum wall

length of 15m and each
external wall plane
incorporates at least one
design element of add

visual interest and

amenity (such as

windows, pergola, sun
shading devices,

balconies or a change of
building material).

b) vary and break up the roof
form through gables or different
pitches to add visual interest
and define the individual
dwelling units

c) provide individual
segmented balconies for each
dwelling unit to reduce
dominant horizontal banding
and to provide private open
space or each tenancy

d) break up building facades
by incorporating different but
complimentary textures and
building materials; and

e) visually break up the bulk of
the building by integrating tall
plant species in front of and to
the side of buildings;

$35.3

 

v The proposal complies with
probable solutions.

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 27

6.3

Page 11

 

 

036 No more than 2 dwelling units are | $36.1 No solution provided ¥ Complies

located on any site

Garages and carports

037 Garages and carports are designed and | $37.1 Garages and carports- Complies with probable

sited to visually integrate with the building and
avoid dominating the street

a) have a front boundary
setback of a least 6m; and

b) adopt a roof form and
building style that are the same
as that of the building; and

¢) present a minimum width to
the streetscape (the total width
of garage doors is no more
than 6m or 50% of the frontage
width, whichever is the lesser,
where the structure faces the
street); or

d) that are visible from, but do
not face the street, include
windows or other articulation
and have a 6m landscaped
buffer between the structure
and the road frontage, and
$37.2 Covered parking spaces
located in the area between the
swelling fagade and the road
frontage do not comprise
carports

solutions except

c) where the total width of door
is 6.7m. Because the doors
are recessed and staggered
the impact is significantly
reduced and therefore still
meets to O37 requirements

 

Professional offices
038

v NIA

 

 

Front fences and walls

039 Front fences and walls are designed and
sited to-

a} contribute to the attractiveness of the street;
b} be compatible with the existing streetscape
character

Cc} relate to the architectural period of the
building;

d) avoid interference with the movement of
stormwater,

€) allow for casual surveillance from the street
or where premises adjoin part of the major
road network, mitigate traffic noise

f} provide for planting in front of high solid
fences and walls; and

g) ensure planting between the front fence
and the footpath does not create an
impediment for pedestrians using the
footopath

 

$39.1 Front fences or walls are
a) not forward of the front plan
of dwelling units; or

b} no more than S00mmhigh; or
c) no more than 1.2m high and
of open construction (ie at least
50% transparent);

OR

$39.2

 

¥ Complies as all fences are
behind the 6.0m building line.

v NA

 

Residential Uses Code

Specific Outcomes
For ali Residential Uses
14.52 Effects of Use

ECR es

Compliance v/*

 

 

Electricity supply infrastructure
of

 

$1.1 No solution provided

 

¥ The site is not near an

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

 

Page 28

Page 12

 

02

 

 

 

$2.1 Development for uses
adjacent to or within 50m of an
existing electricity substation
incorporates noise attenuation
measures to mitigate noise
impacts; and
$2.2 Buildings and structures
(including swimming pools,
sheds, tennis courts and
outbuildings) are not constructed
under overhead electricity
transmission lines, or within
electricity easements;
AND
$2.3 A minimum separation
distance is maintained from the
electricity transmission line to the
closed boundary of habitable
building and child activity areas,
as follows-
a) 20m for transmission lines
up to 132kV;
b) 30m for transmission lines
between 133kV and 275kV;

and
c) 40m for transmission lines
greater than 274kV.

electricity substation nor any
overhead transmission lines.

 

14.53 Environmentally Sustainable Building Design

 

Hot Water Systems
03

$3.1 All hot water systems

installed are —

a) solar systems; or

b) electric heat pump systems;
or

c) natural gas or LPG systems;
or

any combination of a), b) or c)

¥ Will comply

 

Water supply and conservation
04

05

$4.1 Ifin a designated rainwater
tank area as identified in Map 1 of
Schedule 8, residential uses that
qualify as class 1A or 18
structures under the Building
Code of Australia have a
rainwater tank or tanks in
accordance with schedule 8.

AND

$5.1 Where not in a water service
area a rainwater tank of minimum
of 60,000 litres is provided for
each dwelling unit, with the
exception of Multiple Housing
Type 4.

¥ each unit incorporates a
3000L water tank

 

 

Erosion and sediment control
06

 

No solution provided

 

| Advisory Note

| Persons undertaking
development, including
building work, are required
under the Environmental
Protection (Water) Policy 1997
(EPP) to ensure that sediment
and other material including

 

 

 

Full erosion and sediment
control will be employed to in
accordance with Noosa
Council requirements

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 29

Page 13

 

building waste, sawdust,
concrete, cement or paint are
not deposited or released into
a toadside gutter, stormwater
drain or waterway, or into a
place where it could
reasonably be expected to
move or be washed into a
roadside gutter, stormwater
drain or waterway and are not
washed from the site. Council

 

 

 

 

 

 

 

09

least 3m away from shared
driveways or carparking areas of
adjacent dwelling units or
accommodation units.

enforces the EPP and
penalties may apply.
44.54 Amenity and built form
Safety and security $7.1 The building entrance is
07 clearly identifiable and visible Y The entry door is
from the street, footpath and considered to be the gate
driveway; adjacent the driveway. This
AND is lockable and has an
$7.2 The internal path network intercom .
has clear sightlines to the It is clearly visible from the
dwelling entry and street access verandah.
points;
AND
$7.3 Visitors have direct access
to the entrance without passing
through private outdoor living
areas
Emergency access No solution provided ¥ Complies
08
Separation of incompatible uses $9.1 Bedroom windows are at ¥ Complies

 

010

 

Mechanical plant & equipment

 

$10.4Mechanical plant and

equipment, including pool and

spa pumps, pool heaters, air-
conditioning units and
refrigeration units are —

a) where located at ground
level, screened by fencing
1.5m in height or dense
vegetation of at least 1.5m in
width incorporating grouped
trees and shrubs with
maximum separation
distance of 1m measured
from the centre of the plant;
and

b) for Multiple housing Type
2,3 & 4 are visually
integrated into the line and
plane of the building and roof
design and do not project
beyond the height or width of
the building when viewed
from the street and adjoining

 

~ Complies as it is situated
under the pools.
Air-conditioning equipment
will be located and shielded
to prevent nuisance.

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 30

Page 14

 

properties.

 

Ancillary recreation uses
014

$11.1 If the use involves ancillary
use of outdoor courts including
tennis courts, half courts and
netball courts — the use complies
with the requirements in Section 2
of PSP8 Tennis and Other
Courts.

v NA

 

Privacy
012

$12.1 Transparent doors and
windows are designed and
located so they do not directly
face transparent doors or
windows or the private open
space areas of other dwelling
units within 10metres;

AND

$12.2 Planter boxes, louvre
screens, pergolas, landscaping
and architectural design of
balconies are used to screen the
ground floor private open space
of dwelling units or
accommodation units from upper
level units (refer to Figure 14-2
Privacy Measures which
illustrates how trees, awnings,
screens, fences and planter
boxes reduce minimise the ability
to directly look into neighbouring
homes and yards).

¥ the two units are back to
back and there is no problem
with privacy. Decks are

located to reduce
overlooking into
neighbouring properties.

Overlooking into

neighbouring properties from
windows will be reduced with
privacy screens, translucent
glass and landscaping.

 

Access to Sunlight
013

014

$13.1 Development does not
reduce sunlight to at least 50% of
the private open space areas of
any adjoining residences to less
to than 2 hours between 9am and
3pm on any day of the year;

OR

$13.2 Where overshadowing by
existing structures and fences
occurs to more than 50% of the
private open space areas of any
adjoining residences, sunlight is
not further reduced by more than
20%.

(See Figure 14-3 - Preventing
overshadowing)

$14.1 No solution provided

¥ Complies

 

Sloping sites
015

 

 

$15.1 Buildings and structures on

sloping sites-

a) Have a maximum distance of
3m between the ground and
the lowest part of the floor of
the building or the building
incorporates under croft
skirting or screening (eg.
Timber battens) to the full
height of any under croft
area higher than 3m above
ground level at the perimeter

 

¥ Complies

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 31

Page 15

 

of the building;

b) Are of split level design that
step down the slope or have
suspended floor
construction;

c) Limit the amount of cut or fill
to less than 1.5m in depth;
and

d) Oonot result in the spread of
ill beyond the footprint of the
building and associated

¥ Complies

Cuts are greater than 1.5
because of the steepness of
site. The cuts are
engineered so as not to
effect adjoining properties.

 

batters.
Wall length and detailing $76.1 The maximum wail length ¥ Complies
016 is 15m;
AND
$16.2 Walt planes incorporate ¥ Complies

design elements to add visual
interest and amenity, such as
windows, pergolas, sun shading
devices and variations in balcony
Styles.

 

Table 14-22 ~ For Multiple housing
elm el eee
14.55 Built Form

  

  
 

ALI CMs SLL ue)

  

  

i ei aa cl

 

Garages and carports
017

 

$17.1 Where lock up garages are

included-

a) Garages are stepped back a
minimum of 600mm from
each other, in relation to the
frontage; and

b) Atleast one open visitor
carpark is provided between
the building and the frontage
and is not restricted by gates
security screens or other
obstacles;

AND

$17.2 Garages, carports and

uncovered spaces are designed

to allow vehicles to enter and exit
the site in a forward gear through

a 3-point turn maximum;

AND

$17.3 The development provides

for shared driveways to minimise

the number of access points,
except on corner sites where
garages or carports in the
development front separate
streets.

 

 

¥ Complies

¥ Complies

¥ Complies

¥ Complies

 

 

6.4 Landscaping Code

yea erecee liters Probable Solutions (if code assessable) | Compliance v//x

 

 

 

 

 

 

 

14,152 General Requirements
Streetscape and amenity $1.1 Landscaped areas, notless | “Complies
07 than the minimum areas and
Material Change of Use Bomerah Pty Ltd

15 Duke Street, Sunshine Beach

June 2007

Page 32

Page 16

 

dimensions specified in Table 14-
53 or 14-54, are provided and
maintained.

$1.2 Landscaping is designed,
planted and maintained in
accordance with PSP3
Landscaping Plants and
Guidelines

264 sq.m required
399 sq.m provided

¥ Will comply

 

Building and Landscape design
02

$2.1 Below ground components
of buildings do not extend beyond
the above ground footprint to
allow for landscaping particularly
within building setback areas;
AND

$2.2 Basement car parks do not
encroach into building setback
areas;

AND

$2.3 Plants are grouped in
mulched beds rather than planted
individually to provide for optimum
growing conditions and less
maintenance;

AND

$2.4 Landscaping is designed,
planted and maintained in
accordance with PSP 3
Landscaping Plants and
Guidelines

¥ Complies

¥ Complies

Will comply

v'Will comply

 

 

Species Selection
03

 

$3.1 Plantings-

a) Comprise plant species
identified for the relevant
landscape character area in
PSP3 Landscaping Plants
and Guidelines; and

b) Avoid undesirable plant
species identified in PSP3
Landscaping Plants and
Guidelines.

OR

$3.2 For landscaping around pool

areas-

a) No more than 30% of the
landscaped area is a mixture
of plants of focal origin and
exotic plant species,
provided none of the plant
species are undesirable
plants identified in PSP3
Landscaping Plants and
Guidelines; and

b) Palms and specifically
located in group plantings in
accordance with PSP3
Landscaping Plants and
Guidelines;

AND

§3.3 Root guards are utilised

around species with potentially

invasive roots.

 

¥ Will comply

v'Will comply

¥’Will comply

¥ Will comply

¥ Will comply

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 33

Page 17

 

Safety and security
04

05

06

$4.1 No solution provided

$5.1 Landscaping provided which

allows adequate visibility for

casual surveillance of public and
semi-public spaces, including
entrances and exits to sites and
buildings, by:

a) Planting trees which have
clean trunks to a height of at
least 1.8m; and

b) Appropriately spacing shrubs
at 1.2m Horizontal cenires,
with a maximum height of
0.75m, t avoid clumping and
to retain sightlines.

$6.1 Street trees and trees in car
parking areas achieve a
maximum of 900mm clear trunk
height for a 2.0m high tree at
planting and are able to attain a
clear trunk height of 1900mm on
maturity;

$6.2 All scrub planting to be a
maximum height of 700mm from
the road pavement (not top of
kerb)

Will comply

¥ Will comply

Y’Will comply

¥ Will comply

¥ Will comply

¥Will comply

 

Services and utilities
07

 

 

$7.1 Plant species used in

landscaping adjacent to

substations, or adjacent to or on

electricity transmission line

easements, are less than 4m

high at maturity and do not

encroach with 3m of a substation

boundary;

OR

$7.2 For trees higher than 4m,

trees are planted at a distance

from any part of an electricity

transmission line at least equal to

the expected height of the tree at

maturity

$7.3 For power lines that connect

to a premises, the height of plant

species at maturity provides for a

2m clearance below the power

line;

S7.4 Trees and large scrubs are

located a minimum of -

a) 5m from electricity poles and
pillars;

b) 4m form street lamps;

C) 2m from stormwater

 

¥ Will comply

¥ Will comply

¥ Will comply

¥ Will comply

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd

June 2007

 

Page 34

Page 18

 

catchment pits; and
d) 2m from underground
service and utilities;
AND
$7.5 Plants are located to enable
tradespersons to access, view
and inspect service meters, such
as water and electricity meters
AND
$7.6 Root barriers are installed
around trees that are located
within 3m of any infrastructures or
that have potentially invasive
roots.

¥ Will comply

¥ Will comply

 

Entry statements
08
09

$8.1 No solution provided

$9.1 Entry statements are low
maintenance and located entirely
within privately owned land.

NIA
NIA

 

14.153 Specific requirements for Multiple housing & Visitor Accommodation

 

Private open space
010

 
    

BT
x
Bm SZ
RECEIVED \>\

¥
YyY

   

 

      

$10.1 For Multiple housing
Types 2 and 4, each dwelling
unit provides for landscaped
private open space comprising-
a) for units at ground level, a
minimum area of 25m2
exclusive of the clothes
drying are, with minimum
dimensions of 4m and
maximum gradient of 10%
(1:10); or
b}) for units above ground level,
a minimum area of 12m2,
with minimum dimensions of
2.5m; and
$10.2 For Multiple housing
Types 2 and 4, the private open
space area in enclosed by side
and rear fencing, screening or
dense landscaping of at least
1.8m in height to protect the
privacy of residents; or
$10.3 For Visitor
Accommodation no solution
provide

NIA

¥ Complies
15sq.m provided

¥ Complies

YNIA

 

Communal open space
011

No solution provided.

Because of the nature of the
site the communal open
space is limited to the
driveway area. Some
private open space is
provided in lieu.

 

Screening & Mounding
012

013

014

 

 

No solution provided

 

¥ Complies
¥ Complies

v NA

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 35

Page 19

 

 

 

015 ¥ NIA
Streetscape character No solution provided

016 vWill comply
017 v NA
Passive solar access and energy efficiency | No solution provided v’Will comply

 

14.156 Environment protection and conservation

 

 

Watercourses and drainage lines No solution provided v NIA
024

Wildlife habitat protection $25.1 For Koala Habitat Areas

025 shown in Schedule7- v NIA

a) Aminimum of 70% of tree
species planted on the
premises are koala food
trees listed in PSP3
Landscaping Plants and
Guidelines; and

b) Where koala access is
impeded by a fence or
retaining wall-

i) Climbing poles are
erected at regular
intervals along the
structure at an
approximate 45 degree
angle on either side of
the structure;

ii) Plant vegetation within
close proximity
{branches touching) on
either side of the fence
to provide a natural
ladder; and

iii) install panels or planks
horizontally along the
top of the fence to
provide a walkway,
where appropriate; and

c) Choose fence materials,
such as timber post and rail
or chain wire, that a koala
can easily grip and climb or
leave a minimum 300mm
gap between ground level
and the first rail or strand of
any fence; and

d) Where there is a swimming
pool in the landscape design
likely to be accessible to
koalas, a rope is provided to
enable koalas to climb out of
the pool;

AND

$25.2 Vegetation of local origin is

tetained and replanted in areas

indicated in Schedule 5 on Map 4

— Open Space Networks,

 

 

 

 

 

Material Change of Use Bomerah Pty Ltd
15 Duke Street, Sunshine Beach June 2007

 

Page 36

6.5

Page 20

 

 

 

 

 

 

 

Water management $26.17 The infiltration and
conservation of water is optimized | ~Will comply
through -
a) Selecting native plant
species identified in PSP3
Landscaping Plants and
Guidelines;
b) Grouping plants in mulched
beds;
c) Minimizing impervious
surfaces;
d) Using semi-pervious
pavement surfaces; such as
grass cell paving, as a
alternative to pervious
surfaces
e) Draining hard surfaces areas
to landscaped areas;
f) Planting micophytes along
driveways to absorb
hydrocarbons; and
g) Using surface and
subsurface drainage swales.
h)
Soil stability No solution provide v’Will comply
027
14.157 Carparking areas
028 Off street carparks v NIA
029 On street carparks v NA

 

 

Driveways and Carparking Code

Specific Outcomes
} Driveways
| 14.130 General

Probable Solutions

Compliance v/x

 

07 Vehicular access does not adversely
impact on safety, capacity and operations of
the existing or planned road network, the
proposed driveway, cycleways or pedestrian
pathway systems.

$1.1 Vehicular access is
located and designed in
accordance with AUSTROADS
Guide to Traffic Engineering
Practice requirements for sight
distance and Section 3 of
AS2890.1 Parking Facilities;
AND

$1.2 Only one footpath
crossing is provided; AND
$1.3 Driveways, other than
within any setback have a
maximum grade in accordance
with Section 3 of AS/NZS
2890.1

v The proposed access and
driveway has been designed in
accordance with AS2890.1.

Only 1 driveway is provided .

 

 

 

 

 

 

O2 Driveways and crossovers— $2.1 Design of the driveway ¥ Complies.
a) are suitable and safe for their intended use; | across the footpath is in
and accordance with Council's
b) match Council infrastructure. Standard Drawings 9002 or
9005 as appropriate for the
particular type of development
as annotated on the drawings;
AND
Material Change of Use Bomerah Pty Ltd

15 Duke Street, Sunshine Beach

June 2007

 

 

Page 37

Page 21

 

$2.2 Driveways are designed
and constructed in accordance
with Council Standard
Drawings 9014, 9019, 9020,
9021, as appropriate for the
particular type of development
as annotated on the drawings;
AND

$2.3 The change in grades in
the driveways and ramps is in
accordance with Section 3 of
AS2890.1 Parking Facilities.

 

03 In commercial zoned areas, the number of
driveways across pedestrian footpaths is
minimised.

$3.1 Design of multi-tenanted
developments in commercial
Zoned areas include shared
driveways and parking areas;
AND

$3.2 Driveways are located so
they abut existing driveways of
adjoining development where
practicable and reciprocal
easements are created to
teduce the sealed driveway
width.

v NIA

v The existing drive will be
modified to be — slightly
narrower.

 

 

04 Vehicular access does not adversely $4.1 Footpath and kerb ¥ Complies.
impact on the capacity, operations and crossings are located clear of
maintenance of the existing infrastructure; existing stormwater inlet
AND structures, water and sewerage
O85 Vehicular access does not adversely infrastructure fittings, any other
impact on the integrity of existing landscaping | exiting utility infrastructure,
or native vegetation. existing landscaping and
vegetation.
$5.1 No solution provided
06 Driveway run-off is filtered prior to leaving | $6.1 For— ¥ Complies. Appropriate

the premises.

a) Ancillary dwelling unit,
Multiple housing Types 1 or 2
if less than 5 carparking
spaces, Visitor
accommodation Type 1 and
Home based business—the
driveway is formed to drain to
landscaped areas, and

b) for other uses—grease and
oil arrestors or stormwater
quality improvement devices
are incorporated into the
design to treat run-off prior to
run-off exiting from the

stormwater quality will be
directed to landscape areas.

 

 

 

 

 

 

 

15 Duke Street, Sunshine Beach

premises.
Carparking and manoeuvring
14.132 Carpark design and layout
09 Sufficient carparking is provided to $9.1 The number of parking ¥ Complies.
accommodate the number and type of and loading bays is not less
vehicles likely to be generated by the than the minimum number
development having regard specified in Table 14-47
to the specifics of the use including— Vehicle Parking Requirements;
a) the type and intensity of land use; OR
b) any existing parking available on the site; $9.2 If insufficient carparking v NIA
c) hours of operation; spaces are provided on-site a
d) likely numbers of users; monetary contribution is made
Material Change of Use Bomerah Pty Ltd

June 2007

 

Page 38

Page 22

 

e) the peak parking demand periods of uses
on the site; and
f} the availability of alternative carparking.

to Council in accordance with
Section 6 of PSP13
Contributions in lieu of
provision of off-street
carparking.

 

010 The layout of the development provides
adequate, clearly defined and easily
accessible—

a) on-site vehicle parking and manoeuvring
areas; and

b) loading and manoeuvring areas for delivery
and service vehicles

$10.1 Parking bays,
manoeuvring areas, queuing
areas, loading, setdown and
pickup areas and driveways
are designed to the standards
set out in Sections 2 and 3

of Australian Standard AS
2890.1 Parking Facilities (Part
1; Off-street Carparking) and
AS 2890.2 — Off-street Parking
(Part 2: Commercial Vehicles),
AND

$10.2 The number of loading
bays is not !ess than the
minimum number specified in
Table 14-47.

¥ The parking _ bays,
manoeuvring areas, etc have
been designed in accordance
with AS 2890.1.

 

O11 Parking areas are located where they will
not unduly conflict with pedestrians and will
not dominate the streetscape.

$11.1 Carparking areas are
accessed from rear laneways
where practicable.

¥ The proposed access
driveway is in the same
location as the existing
driveway and is in the most
appropriate location.

 

 

012 Provision is made for a reasonable $12.1 Carparking spaces are v NIA
number of on site carparking spaces identified | provided for people with
and reserved for people with disabilities. disabilities at the rate specified
in Section 2.4.5 of AS 2890.1 -
Parking Facilities (Part: Off-
street Carparking).
013 Access and egress points do notimpact | $13.7 Vehicle manoeuvring Y Vehicles will be able to enter

on the safety and operations of the road
system.

areas are provided in
accordance with Section 3 of
AS 2890.1 Parking Facilities
{Part 1: Offstreet Carparking)
so vehicles enter and leave the
Site in a forward gear.

and leave the site in a forward
gear in accordance with AS
2890.1.

 

014 Development with the potential to
generate significant traffic and parking impacts
gives appropriate consideration to transport
and land use issues.

No solution provided

¥ N/A. The proposal will not
generate significant traffic and
parking impacts.

 

 

015 Business Uses and Community Uses
are designed and constructed to encourage
users of the development to access the site by
means of foot or bicycle through provision of
appropriate end-of-trip facilities including
bicycle parking and shower/change rooms

 

$15.1 Safe and convenient
cycle access to and from the
site from the existing road and
bicycle network, and safe
bicycle movement within the
site is provided;

AND

$15.2 Secure and convenient
parking space for bicycles is
provided on site in accordance
with Table 14-48 Minimum
requirement for bicycle parking
and AS2890.3 Bicycle Parking
Facilities;

AND

$15.3 Where at least 10
bicycle car parking spaces are

 

Y NIA

¥ NIA

vv NA

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 39

Page 23

 

required in accordance with
Table 14-48, end-of-trip cycle
facilities are provided at the
following rate:

a) 1 locker per 2 bicycle
parking spaces; and

b) 1 shower cubicle with
ancillary change rooms per 10
bicycle spaces or part thereof,
providing facilities are either
unisex or both males and
female facilities are provided.
AND

$15.4 Bicycle parking spaces
and cyclist facilities are
designed in accordance with
AUSTROADS Guide to Traffic
Engineering Practice, Part 14 -
Bicycles, Section 10.

AND

$75.5 On-site pedestrian
facilities such as seating and
shade are provided in
developments for the
convenience of persons
walking to the site.

v NIA

v NIA

 

016 Carparks are designed to ensure run-off
is treated to remove pollutants prior to leaving
the premises.

$16.1 Grease and oil arrestors
or stormwater quality
improvement devices are
incorporated into the design to
treat run-off prior to it leaving
the premises.

v NIA

 

017 Carparking areas are designed to ensure
drainage without the use of pumps or other
electrical apparatus.

No solution provided

v¥ Complies. No pumps or
other apparatus will be required
to assist with the drainage from
the site.

 

078 Site layout and building design provides
for soft landscaping to be established.

 

 

$18.1 Below ground
components of buildings,
including car parks, do not
extend beyond the above
ground footprint to allow for the
provision of landscaping,
particularly within building
setbacks.

 

~ Complies.

 

Table 14-47 - Minimum Vehicle Parking Requirements (extract)

Multiple Housing

 

Type 2 Duplex

 

 

1 covered space per dwelling
unit;

AND

1 space for visitor parking,
accessible at all times

 

Y Complies.
5 spaces provided including 1
visitor parking

 

6.6 Earthworks Code

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

 

Page 40

Specific Outcomes

Acceptable solutions (if self-assessable)

Probable Solutions (if code assessable)

Page 24

Compliance “/x

 

14,138 Effects of works

 

Drainage
01

$1.1 The finished surface
gradient of any filled or
excavated area is within the
tange 0.5% to 1.5% and drains
to Council's stormwater
infrastructure where available
or where stormwater
infrastructure is not available,
toward the street.

Y Allsurfaces drain to storm
water outlets.

 

Hydraulics
02

No solution provided.

v Generally the pavements
will be constructed to drain to
the front of the site.

 

Geotachnical considerations
03

For assessable development-
$3.1 Filling works are
undertaken in accordance with
Section 2.8- Filling of Site of
Council's PSP5 - Engineering
Design Standards- Roads and
Drainage and Earthworks
AND

$3.2 Where the filling is for
residential commercial or
industrial purposes the works
comply with Sections 3 to 6 of
AS 3798 — Guidelines for
earthworks on commercial &
residential development.

¥ All pavements are designed
to meet the requirements.

A geotechnical engineer is
engaged to design the proposal
SO as not to cause instability on
this or adjoining sites.

 

 

Local amenity
04

 

$4.1 The following contro!
measures are implemented —

a) Regular water
spraying of exposed
areas to suppress
dust;

b) Provision of dust
stabilised or sealed
internal roads;

c) Protective covering of
exposed areas that
are left for more than
2 weeks; and

d) If there is no valid
development permit
for the site, disturbed
areas are
revegetated using
species identified in
PSP3 - Landscaping

Plants and
Guidelines.
AND
$4.2 Earthworks are

undertaken only during the
hours of 7am to 6pm, Monday
to Friday and 7am to 6pm on
Saturday. No work is
undertaken on Sunday or

 

¥Y All construction methods
will meet the requirements of
council.

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 41

6.7

Page 25

 

public holidays.

 

Vegetative Waste
05

$5.1 Cleared vegetation is
transported off-site for disposal
in an approved green waste
disposal facility;

OR

$5.2 Cleared vegetation is
mulched on-site and reused for
landscaping of the finished
development;

OR

$5.3 Cleared vegetation is
disposed of for the purpose of
firewood

v The disposal of all
vegetation to be removed will
meet council requirements.

 

Managing contamination risk
06

$6.1 The fill material is solid
clean earth, free of putrescible
or refuse material, vegetation,
acid sulfate soils, building or
construction material or other
material or contaminants;
AND

$6.2 The sife is not on the
contaminated land register.

v Fill material will be required
to meet the standards required
for construction.

¥ The site is not on the
contaminated land register

 

Haulage activity and amenity
07

No solution provided

v All work for the
development will _utilized
normal machinery and haulage
methods and use routes
currently acceptable for their
use.

 

Extent of earthworks
08

$8.1 All earthworks, including
cut and fill batters, retaining
walls etc are contained within
the subject site.

v All cut and fill is contained
within the site.

 

Environmental protection
09

No solution provided.

¥ Sediment control measure
will be incorporated around the
site.

 

 

Dams

 

No solution provided

 

Not Applicable

 

Erosion and Sediment Control Code

Specific Outcomes
14.143 Effects of works

Probable Solutions (if code assessable)

Compliance v/*

 

 

Erosion and sediment control
01

 

$1.1 Site disturbance is limited
to building areas, their
surrounds and other use areas;
AND

$1.2 Sediment barriers are
provided throughout and
downslope of disturbed areas
to prevent sediment washing
into gutters, drains and
watercourses either on or off
the site;

AND

$1.3 All stockpiles including
sand, soil or building materials
are within the premises and

 

~ Complies

¥ Complies using council
approved methods

¥ Sediment Barriers are
proposed to contain migration
of building materials

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

 

Page 42

Page 26

 

contained within individual

sediment barriers;

AND

$1.4 Sediment basins are

provided where the site

contains fine or dispersive
soils;

OR

$1.5 A storm water catchpit

incorporating a stormwater

catchpit protection device is
installed so that all runoff from
disturbed areas flows to the
catchpit;

$1.6 For buildings,

a) Temporary or permanent
downpipes are connected
to the stormwater system
before laying the roof; or

b) Localised erosion is
avoided by directing flow
from down pipes over non-
erosive areas

¥ NIA

¥ Complies using council
approved methods

¥ Storm water connection is
proposed to avoid erosion

 

Storm water runoff
02

 

 

$2.1 Diversion drains or bunds
are designed and constructed
to drain upstream run-off
around the disturbed site;
AND

$2.2 Discharge from the
diversion drains do not cause
run-off impacts to other
properties;

OR

$2.3 Alternative methods, as
described in the Institution of
Engineers Australia
(Queensland Division) Soil
Erosion and Sediment Contro!
- Guidelines for Queensland
Construction Sites, are used.

 

¥ Stormwater is proposed to
be diverted to avoid disturbed
areas

 

6.8 Existing Services Code

Ay eealdem el eeu Probable Solutions {if code assessable) Compliance ~/x

 

Setbacks and easements
01

 

 

$1.1 The footing of any
structure or building is located
clear of the zone of influence
but no closer than 1.5m
(measured horizontally) from
infrastructure including sewers,
water mains and stormwater
structures;]

AND

$1.2 No building or structure
overhangs the zone of
influence;

AND

 

v The sewer on the road
reserve is outside the zone of
influence of the proposed
building

v No overhangs are proposed
over the zone of influence of
the sewer

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

 

Page 43

Page 27

 

$1.3 Finished surface levels
maintain a minimum of 600mm
of cover, but no greater than
3m of cover to the underground
infrastructure;

AND

$1.4 If the existing surface
level is altered, surface level
services including manholes
and inspection points are
altered to match the new
surface level;

AND

$1.5 Alterations are
constructed in accordance with
Sections 3, 4 and 5 of PSP6 -—
Engineering Design Standards
— Water and Sewerage and
Section 4 of PSP5-
Engineering Design Standards
— Roads, Drainage and
Earthworks.

AND

$1.6 Existing services are
relocated and the design and
construction of the relocated
services is in accordance with
Sections 3, 4 and 5 of PSP6 —
Engineering Design Standards
— Water and Sewerage and
Section 4 of PSPS —
Engineering Design Standards
~ Roads, Drainage and
Earthworks.

Y No service exist in the

building zone

¥ NIA

v NIA

v NIA

 

02

 

 

$2.1 A registered easement in
favour o fcouncil is created
over ail underground
infrastructure located in private
property;

AND

$2.2 The width of the
easement is the greater of 2m
or the width of the zone of
influence;

AND

$2.3 The easement is centre
over the centreline of the
infrastructure.

 

¥ NIA

 

6.9 Transport, Roads and Drainage Code

 

Specific Outcomes Probable Solutions {if code assessable) Compliance “/x
14.163 Strategic Transport Network
04 $1.7 Where the development 1 extra dwelling unit is

 

 

leads to the need to increase
transport infrastructure in the
Shire, the development

 

proposed

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

 

Page 44

Page 28

 

contributes to the transport
network in accordance with the
requirements of Infrastructure
Charges Plans (!CP); and
where developments requires
infrastructure not included in
the ICP, the development
upgrades the infrastructure at
no cost to Council.

 

Advisory note

Council may for some
development require the
preparation of a Transport
Impact Assessment Report.
Planning Scheme Policy
PSP1 details matters to be
addressed in the Report.

 

 

 

02

No solution provided

¥_Complies

 

03

$3.1 Facilities for boarding and
exiting community transport
service and facilities are
incorporated into
developments.

¥ The development is close to
existing public transport and
bikeway etc.

 

04

No solution provide.

¥ Complies

 

 

yee eles ae

 

Probable Solutions (if code assessable} _ Compliance Vix: . ~~’
14.164 Road and drainage design and construction

 

05

 

$5.1 Road planning and design
supports the hierarchy and
functional aspects identified in
Sections 2 and 3 of PSP5
Engineering Design Standards
~ Roads, Drainage and
Earthworks;
AND
$5.2 Road and pathway
planning and design is in
accordance with, in order of
precedence —
a) Noosa Integrated
Local Transport Plan;
b) Queensland
Transport's Shaping
Up;
c) Queensland Design
Code for Residential
Streets;
d) AUSTROADS Guide
to Traffic Engineering
Practice;
e) Sections 2 and 3 of
PSPS Engineering
Design Standards —
Roads, Drainage and
Earthwork; or the
Noosa Cycling and
Walking Network
Development Plan;
OR
g} Acombination of the
principles in these

 

 

Y The development is
proposed in an existing
residential area which provides
all these facilities.

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 45

Page 29

 

documents
AND
$5.3 On road cycling treatment
is utilised to provide safe and
continuous movement of
cyclists along a roadway, such
as -
a) Sealed shoulders;
b) Wide kerbside lane;
c) Exclusive or peak
period bicycle
Awareness Zone;
d) Shared parking /
bicycle lane;
e) Contra flow bicycle
lane; and bus/bicycle
lane.

$5.4 The provision of bicycle
lanes at intersections is
generally in accordance with
AUSTROADS Part 14, section
5 and the Manual of Urban
Traffic Control Devices
{MUTCD) Part 9.

 

06

$6.7 Stormwater drainage
planning, design and
construction is in accordance
with Section 4 of PSP5
Engineering Design Standards
— Roads, Drainage and
Earthworks;

AND

$6.2 As Constructed data is
submitted in accordance with
Section 6 of PSP5 Engineering
Design Standards - Roads,
Drainage and Earthworks;
AND

$6.3 Stormwater drainage
planning, design and
construction is in accordance
with the Queensland Urban
Drainage Design manual.

Y Water quality devices are
proposed to improve quality of
stormwater before it water the
council stormwater system.

 

07

 

 

$7.1 Roads and stormwater
drainage infrastructure is
constructed in accordance with
a) Sections 2, 3 and 4 of
PSPS Engineering
Design Standards -
Roads, Drainage and
Earthworks;
b) Queensland Design
Code for Residential
Streets;
c) AUSTROADS; or
d) Acombination of the
principles in these
documents;
AND

 

~ Complies

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 46

Page 30

 

$7.2 Erosion and sediment
control measures are designed
and implemented in accordance
with Institution of Engineers
Australia (Queensland Division)
Soil Erosion and Sediment
Control -— Guidelines for
Queensland Construction Sites.

 

08

$8.1 Roads and stormwater
drainage follow the edge of
existing disturbed areas, or
alternatibely, these works are
co-located within a combined
utility corridor;

AND

$8.2 Roads avoid nativwe
vegetation and provide for
fauna underpasses and
associated fencing where
appropriate;

AND

$8.3 Road infrastructure within
or adjacent to native habitat
incorporates fences which allow
for protected wildlife movement
and controls unrestricted
access of domestic cats and
dogs;

AND

$8.4 Native vegetation is
protected from clearing or
construction activities by-

a) Clearly marking
vegetation to be
retained with flagging
tap;

b) Installing protective
fencing around the
dripline of vegetation;
and

c) Ensuring stock piling,
storage and vehicle
parking occur outside
the areas of
vegetation to be
tetained;

AND

$8.5 Low impact construction
techniques are used around
areas of vegetation to be
retained to minimise
interference with the vegetation.

¥ Complies

 

09

No solution provided

v NA

 

010

 

 

$10.1 The location, design and
construction of stormwater
drainage structures is in
accordance with Sections 4 and
5 of PSP5, Engineering Design
Standards - Roads, Drainage
and Earthworks;

 

v NIA

 

 

Material Change of Use
45 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 47

Page 31

 

AND

$10.2 Where infrastructure is
located on private land an
easement is dedicated over the
infrastructure in accordance
with Section 4 of PSP5,
Engineering Design Standards
— Roads, Drainage and
Earthworks.

 

14.165 Frontage works

 

on

$11.1 The following
infrastructure components
already exist at the frontage of
the site or are provided at eh
developer's expense —
a} Full width sealed
road;
b) Concrete kerb and
channel where

¥ Complies

All infrastructure is in place with
the exception of a footpath
which will be provided as

 

 

 

 

 

 

 

15 Duke Street, Sunshine Beach

a required by Council.
appropriate;

c) Forming and grading
to footpaths;

d) Vehicular kerb and
footpath crossings;

e) Aconstructed
bikeway;

f} Aconstructed
footpath;

g) Aconstr4ucted
carriageway;

h) Required alterations
to public utility main,
services or
installations;

i) Construction of any
required altercations
to public utility mains,
service or
installations;

j) Stormwater drainage
works; and
installation of
electrical conduits;

AND
$11.21 Road and drainage
design and construction is in
accordance with Sections 3 and
4 of PSP5 Engineering Design
Standards - Roads, Drainage
and Earthworks.

14.166 Road and rail corridors

012 $12.1 Noise sensitive uses ¥ NIA
including residential uses are
separated by a minimum of-

a) 40m from the
property boundary of
roads within the major
road network; and

b) 80m from the
property boundary of

Material Change of Use Bomerah Pty Ltd

June 2007

 

Page 48

Page 32

 

 

rail corridors;
OR
$12.2 Development in the
vicinity of road corridors meets
the following external design
criteria for roads in the major
road network-

a) 63d B(A)L10 (18 nous)
based on predicted
traffic volumes ten
years hence;

AND

$12.3 Development in the
vicinity of rail corridors meets
the following external design
level noise criteria —

a) 65dB(a), assessed as
the 24hour average
equivalent continuous
A-weighted sound
pressure level; and

b) 87dB)A_, assessed
as a single event
maximum sound
pressure level.

 

 

 

 

 

 

to infrastructure as a result of
the development are completed
at the developer's expense.

14.167 Stage development

013 [_No solution provided LY NA
14.168 Alterations to services and utilities

014 $14.1 Any alterations or repair | “ Complies

 

 

6.10 Waste Managment Code

ode assessable )

 

ey) O .
Waste separation
01
02

 

 

$1.1 Construction, operational
and demolition works are
planned and manage in
accordance PSP124;

AND

$1.2 Adequate area is
provided for on-site for the
collection and separate storage
of recyclable, non-recyclable,
vegetative and hazardous
materials in their specific waste
streams during construction,
operation and demolition
works;

AND

$2.1 Waste storage areas
allow for the separate storage
of different waste materials for
reuse or recycling by -

a) Providing sufficient
area to store all
recyclable material
and recycling
containers required,

¥ All construction waste will
be stored on site in commercial
skip bins and disposed of by
the waste disposal contractor
to land fill/recycting

Y The bins will be situated
Strategically on site and
serviced regularly

 

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 49

Page 33

 

 

and

b} Sign posting the
types of waste
stored.

 

 

Design and location of waste storage areas

03

AND

04

AND

05

 

$3.1 Waste storage areas are
designed and maintained in
accordance with PSP9;

AND

$3.2 Waste storage areas are
designed and located sot they-

a) Are easily accessed
and convenient to
use;

b) Have unobstructed
access for the
collection of the
waste by service
vehicles;

c) Provide for sufficient
space for safe entry
and exit and
servicing by Council's
contractor without the
need for manual
handling;

d) Are clear of car
parking bays, loading
bays and similar
areas;

e) Are clear of footpaths
and pedestrian
access;

f} Are capable of being
service by the
collection vehicle
without impeding
traffic flow; and

g) Have alevel area
provided for the
storage of waste and
tecyclable materials
in standard waste
containers; and

AND

$3.3 For uses that do not
comprise a caretaker's
residence or central
management, the maximum
distance between waste
storage areas and the kerbside
is-

a) For Multiple
housing Type 3 -
40m;

b) For other uses —
70m; and

$3.4 Pathways used to
transport bins —
a) Have amaximum
grade of 1:15; and

 

~ Aproposed waste
management plan will be
provided.

v NIA

¥ Complies

~ Complies

¥ Complies

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 50

Page 34

 

AND

06

b) Are free of steps,
stairs or other
impediments;

AND
$4.1 Waste storage areas are

a) Integrated with the
building design,
where possible;

b) Setback a minimum
of 2m from side and
rear property
boundaries;

c) Screened to the bins
are no visible from
neighbouring
properties or passing
vehicular and
pedestrian traffic; and

d) Not located directly
adjacent to dwelling
units on the site on
neighbouring
properties;

AND

$5.1 Waste storage areas are
constructed of impermeable,
durable and non-textured
materials and surfaces so that
they are easily cleaned;

AND

$5.2 A minimum distance of
0.5m2 distance is provided
between and around waste
storage bins to allow for
manoeuvring and washing of
bins.

AND

$6.1 No solution provided

¥ Complies

 

Water management for waste storage
areas

 

 

$7.1 The waste storage area -

a) Is bunded and
graded so that wash
water and bin
leakage are drained
to the sewer or an
on-site effluent
disposal system via
a gully within the
storage area;

b) Has a bund wall with
a maximum height
of 100mm;

c) Is service be a
conveniently located
hose cock and back
flow prevention
device, and
connected to a
water supply; and

d) is roofed or
otherwise covered if

 

¥ Complies

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

Page 51

Page 35

 

 

 

the storage area is —

i} More than
1m2;or

ii) Storing wet
waste: or

ili) Storing other
waste with a
high potential
to cause
pollution if
washed or
leaked from the
bins, including
waste oil or
putrescibles.

 

 

6.11 Water Sensitive Design Code

Specific Outcomes

Probable Solutions (if code assessable)

 

(eeu) ELL tal hol

 

Water reuse
01

02

03

04

05

 

 

$1.1 No Solution provided

$1.2 No Solution provided
AND

$3.1 Captured water is
plumbed to be available for all
external uses including
gardening, irrigation, ponds,
filling swimming pools and
outdoor cleaning, as well as all
ground floor toilet cisterns and
washing machine cold taps
and

$3.2 Where the captured water
is used for toilet flushing and/or
laundry use, an automatic or
manual interchange device that
allows alternate use of
captured water or the
reticulated water supply is
installed to ensure that there is
a continual supply of water for
sanitary flushing and laundry
use.

$4.1 No solution provided

 

¥A 3000L tank is provided for
each unit

Y¥ Complies

¥ Complies

~ Complies

v_ NA

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

 

Page 52

Page 36

 

$5.1 No solution provided

¥ NIA

 

Run-off treatment
06

07

No solution provided

~ Runoff is to the landscape
area

¥ NA

 

Town water supply connections
08

$8.1 A suitable backflow
prevention device is installed to
protect the potable water within
the reticulated water supply in
accordance with

ASINZS 3500:2003

Plumbing and Drainage

¥ Complies

 

Use of natural treatments and systems
09

10

 

 

No solution provided

 

¥ Complies

v NA

 

6.12 Water Supply & Sewerage Reticulation Code

pe O eT Probable So )

14.181 Design and construction (water)

ode assessable °)

 

01

$1.1 Water supply
infrastructure is designed in
accordance with Section 3 of
PSP6 - Engineering Design
Standards - Water and
Sewerage and As Constructed
data submitted in accordance
with Section? of PSP6-
Engineering Design Standards
— Water and Sewerage.

v Complies

 

02

$2.1 Water supply
infrastructure is constructed in
accordance with Section 6 of
PSP6 - Engineering Design
Standards - Water and
Sewerage;

AND

$2.2 Erosion and sediment
control measures are designed
and implemented in
accordance with the /nstitution
of Engineers Australia
(Queensland Division) Soil
Erosion and Sediment Control
— Guidelines for Queensland
Construction Sites.

Y Complies

 

03

No solution provided.

¥ N/A

 

04

No solution provided.

v NIA

 

05

 

 

$5.1 The footing of any
building or structure is located
clear of the zone of influence
but no closer than 1.5m

 

v NIA

 

 

Material Change of Use
15 Duke Street, Sunshine Beach

Bomerah Pty Ltd
June 2007

 

 

Page 53

 

 

egcEWveD

  

 

 

= 4 JUN 2007

OSA SHIRE CEEEED
wer paNT COUNTER

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

{ FIRST FLOOR PLAN

sexe 1100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mistoc Paring
(25mx55m)

           

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SITE & GROUND FLOOR PLAN

eeate -100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PLANNING PROVEIONS:

Bane wt carrer Mews Ptaroing 2c hee}

kee fos zat on ae 28319

[sae Acres iS Ovie Stent
URGHAE BEACH OLD 667

fsaw Area rr

ocaney fessiem Bascher

[zone [Ser Atached Hovang

fOvierion cee Reackrel Une, Mole
PHounng- Type 2 Ou

lovers Trqgerea Pourat Hazara Ove -
farciside Arve.

vel of Agumserene {eae Assesaman, Coneaiet
jon

APPLICABLE COOES:

(Bitsed on the current Nooea Plaening Schama}

lEasiee Bowcnes  [oonssten

Locakey Code

FRewserast Uses [Coneesent Ganeraty

Koowe ket rar rotvanen rece

func Code fearmatant

Keren Tres orator

fears

DEVELOPMENT PARAMETERS

 

 

 

 

 

 

 

 

 

 

Esser detrei
bematcam poteroat | fer gaat
HOF) Prcnrery Atel CFA Petar SO 05)
RExchrins yareye)
beanie foes mimes
Rater $0055
bina feta | hea
Randecaony 8x Qagm = 24 gn Hard (155 14.097)
Reawenert Prax €0 hard / me 80% sett | | Sot (261 0 m4)
Reellee SO 05},
hmamaay famgoxnatamer
femme avers psu

 

a eg

tne Ouse,

ARCHITECTS

aor
Bomerah (Qld Ply Ltd)
monet

Proposed Duplex

Location

15 Duke Street
SUNSHINE BEACH QLD
cannons,

Floos Plans 1

_ - oon

1100 FEB 2007 1M

oo od
on spot

Page 54

 

 

 

 

 

$89958°"$"9* 28

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

ROOF PLAN

 

SECOND FLOOR PLAN

hme Dor Dae

ARCHITECTS

avr
Bomerah {Qld Pty Ltd)
pmo

Proposed Duplex
caren

15 Duke Street
SUNSHINE BEACH QLD

oun
Floor Plans 2

13109 FEB 2007 1M

mene ane news
0634 5062

Page 55

ee

i

       
 

RL 48.0 U2 Bed 2&3 I

RL 46.0 U2 Liv/Dinykil/Bed 1 |
46.0 Ue LiwDinkivBedt

LEGEND

 

{BIE Pranterponrs ansatiog
~-—-- — FE] Fave cemare Sreetna

(ETE) Honorea! oer Ciadcing

(IE) vertcal Timber Craading

(HE) Pancered conerete

CE] irwten coturen concrete -ameath fh

NORTH ELEVATION FER] rerores wockwerh

Fished Ground Line

Natural Ground Line

 

‘
|
i
‘
|
1
AL48.0 U1 Bed 5

meee ee DE a et J AL 44.0 U1 EntryBed 2 & 3

      

Fimghed Ground Une, seemed —--— -— ee
Natural Ground Une ran = anand }

SOUTH ELEVATION

Al 49.0 U2 Bed 243 |

 

REA Ui DivKit eee ee

Fhished Ground Line
Nptural Ground tine.

 

Fimshed Grovad Line ; i
Natural Geound Line: | |

 

STREET ELEVATION WEST ELEVATION
ole 7700 vere 7100

Nee Owe Dale

ARCHITECTS

MIDDAP DITCHFIELD P/L
oT oo

chase ng fe Pid DT Decent 2095

—
Bomerah (Qld Pty Ltd)
a

Proposed Duplex

voeanen

45 Duke Street
SUNSHINE BEACH QLD
cannes

Elevations

100 FEB 2007 M8 BM
pars oeon cee nem
cos soos

Page 56

A an be

 

       

   

 

   
  

 

  

 

 

 

 

o Mb 48.0 U2BedZ&9 RN nN alert eee ermal ap \ — —— BL 49.0 U2Bed 283,
pAb 8.0 UB
' BL 42.0 U1 LApDivki |
Ak 48.0 UztivDivKivBed ta eel eecres meses eee eeeeeeeenenetemeaunaimmmnti —-—~- —}p — — — —- — —- — — | — FL48.0_U2 LW/DiyKiyBed 1,
Landscaped Rock Retaining Wall |
‘ Landacaped Rock Retaining Wall
@ Garage |
RL43.0 U2Gaaga | —— ~~ — — 1 1 | RL 43.0 U2 Garage
oft 43.0 U26 eerie KS. —— —~ —FLA3.0 U2 Gar ho
r ZT y
YIYYss5
CR
SECTION A-A SECTION C-C
cake 3 100 sean 1.100
-
a“
a
a
a
a
a
7
“
Z
a
=a
_
=
a
< |
—

 

LEGEND
oMao uted:

Pracertoend uheetog
pS a a Fibre Cement Sheeting
Honzontal Timber Cladding

Vertical Timber Closing,

Rendered concrete

‘nate coloured concrete - smooth fh
Rendered blockwor':

aGaRRa8

oAbMB0 UIGame : waa enn

  

SECTION B-B

scale 1,100

wo Cote aa

ARCHITECTS

 

ver
Bomerah (Qld Pty Ltd)
mraxect

Proposed Duptex

r0canon

15 Duke Street
SUNSHINE BEACH QLD

Pod
Sections

fs es eee ne | 1100 FEB 2007 KM
° 8 0m Semen ed
0834 sp

Page 57

=~

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GFA - SECOND FLOOR
!

‘scale 1"200

 

GFA LEGEND
§838 Indicates Gross Floor Area
GFA Total 274.54m?

 

 

 

 

 

168.37 m?
!

GFA - FIRST FLOOR

eam 13200

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GFA - GROUND FLOOR

ewe 1.200

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|
! SITE COVER

seals 1200
ee
20m

° 10

11.84 m?

12.00 m?

98.47 m?

   

214.47 m?

8.46 m?

243m? |

17.73 m? |

!
I

. sya!
max 158.89 m2?

 

LANDSCAPING

 

 

 

 

 

 

 

Hard (7—]]| 156.14 m?

Soft_ E=3| 243.30 m? imin 238.33 m2"

Total 399.83 m? min 264m?
LANDSCAPING

me Ome Oma
ARCHITECTS
MIDDAP DITCHFIELDO P/L

 

cue
Bomerah (Qld Pty Ltd)

rromct
Proposed Duplex

Locarn

15 Ouke Street
SUNSHINE BEACH QLD

omnes
GFA, Site Cover & Landscaping

FEB 2007 KM
ome eee ney ante
sp05

834

Page 58

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

   

 

   

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

ao on ered CONTOUR & 3%,
Leif 6.11.03 6.11.03 6.11.03 % oe
= = row mee DETAIL PLAN %y
2.
2 EE 3108-01 9 Aumeneis } of °
DONALD JAMES COLSTON SCALE 1: 100 LOT 201
CONALD JAMES COLSTON. B.AppSc-Surm(with On) Jt DUNLOP ) on RP48113
surveyed project, at
apt 5.11.03 CONTOUR & DETAIL PLAN 15 DUKE STREET
coos \ SUNSHINE BEACH
Orig Por 28
CONTOUR & DETAIL a Parish WEYBA
County March
SURVEY PLAN Locality: TOWN OF
wae on SUNSHINE BEACH w
1: 200 6 NOV, 2003 §
2
8
®o D
@ %%,?°
ce)
a [> M . . 2
= _. Pool Screen Fence
x 42°58'20" te 3 a
a ? i ve a fp Sy >
« & ol ScrgeryFey /)| \44 \s\ \ | | | 40,730 Fence - kd
a ao " —e eee -
ez (PL : LE %. %, “, 2
ou iS L 7 o mu, s
aaa TTL LLL F- “ g fac é
= 4 044 7 ° Bz fe w
Ye, o Fy page — & Z o
wm Cae . S ”
95.0% Con) L, “S ‘ ®, OES S &
Re, . ef “y aay . a
eee Bo [kt | 33 2 8 =f ° wy
6. %, ag Gk = FS % & 8 qs g ae
9yty,§——® eM as ash es “ye SS. % fs fF ORE
% % % & 3 i] le ry % Spee c oo 8 YY) »
Se Ys > ie 7 LY § ~ Y
BS ont 2p E j p 4, ; \ & uy Fr
@ & “8 1 ett bi 1D : a S| SS Bes
% LA hs Y ke SS, 74,
Af Eb y | ve 5 tye
~ | eS
ve cae ey Vv
o im 130" >
42°58'20" 40.535

 

 

  

 

te »% &
», O = ;
& 3 2
O és
WY x
S
ag
ae
OS
Say

fe cate Ona
ARCHITECTS
MIOOAP DITCHFIELO Pi,

 

ome
Bomerah (Qid Pty (td)
most

Proposed Duplex
wean

15 Duke Street
SUNSHINE BEACH QLD

Existing Survey Plan
we tem
Fénzoor i
one a
0034 8008

Page 59

 

 

10. Roe LAND USE SECTION FEES
=53] NOOSA .

RECEIPT TYPE

SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES
Material Change of Use - édelimpact
cops 2410-00 521
Incdnsistent 521
Assessment under Superseded Planning Scheme 521
Modification to a Development Permit 521
Extension of a Currency Period 521
Operational Works - Landscaping 521
@ Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW
Half Hour 522
One Hour 522
ADVERTISING
Purchase Advertised Applications 523
JETTIES
Jetty Application Fee 524
Jetty Bond 51
(Category 4)
BONDS
Performance Bond . 51
(Category 9)
SIGNS
Registration Fee 222
seen FEE
Search of Land Use Section file 112
Liquor Licensing Request 113

 

TOTAL $ 2470-00

Bomerabh (aw) Wty LtA
NAME: —AtL A+ Yo Dew Farily rrvst

 

ADbREsS: /(f- AwAday + dtehhuAd
(orney Mery + Thonan Sheet, Nooseville ald 4567.

 

 

 

FILENO: __Z007/ 1044 DATE: ¢-6- 7007
RECEIPT NO: LF I B63 : : Signature of TP Officer: “- Hf
AUTHORITY NO:

 

14] 2007/1094 /1-

Page 60

CALCULATION OF FEES

 

APPLICATION FEE TOTAL
: FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent (9 - Anu hye Housing TYye
inconsistent 3.0 2 Duylry

FEE CALCULATION

$ 2470-00

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

 

 

 

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1045 MCU - Multiple Housing Type 2 Duplex -Middap Ditchfield Pty Ltd [As Published].pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.