* INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24,

If you answered “YES” to Q12, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -

© within 200m of a shipping channel or an entry
and exit shipping corridor for the port

® within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

» within 1000m of a planned port facility
identified in a and use plan approved under
the Transport Infrastructure Act 1994,

{n all other situation the Port Authority is an

advice agency.

IDAS A nent Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark’® and within the limits of a port
under the Transport infrastructure Act 19947
{No

[11 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

Marinas

For more information refer to Guide 18. For
information ebout whether @ marina is prescribed
tidal work refer to Guide 24. The local
government is the assessment manager for all
prescribed tidal work.

lf you enswered "YES" to Q13, the application
triggers referral to Queenstand Fire and Rescue
Service as an advice agency.

Tidal works in strategic port land tidat
areas
For more information refer to Guide 18,

Unless you answered "NO" to Q14, the relevant
Port Authority is the assessment manager for the
eppication and the Environmental Protection
Agency (EPA) and Queenstand Transport (QT)
‘are concurrence agencies for the application.
Heritage

For further information refer to Guide 49.

If you answered "YES" to Q15, the application
triggers referret to the Queenstand Heritage

Council as concurrance agency for the
application.

Unless you answered “none of the above” to

13.

=

15.

4,

Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?

KINo

{7 YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work

Ooes the application involve tidal works within a strategic port land tidal area20?
BJ No

(YES -complete Part M of Form 1

Does the appfication involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

No
(7 YES - complete Part C of Form 1

15(b) The application involves: (tick applicable boxes)

 

 

Q15(b), the application involves referral to the C1 () — amaterial change of use assessable against the planning scheme and the lot shares a
Environmental Protection Agency as an advice common boundary with a protected area or registered place under the Queensland
agency for the eppicaton Heritage Act 1992;
(J (i) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
1 (iii) none of the above.
Declared catchment aress 16. The application is in an area declared to be a catchment area under the Water Act 2000 and

For more information, including a lst of the
dectared catchment areas within Queenstand,
tefer to Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

Hf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

 

involves: (tick the applicable box/es)

(OQ) _ reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
C1(ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
[1 (iii) none of the above

 

48 High water mark is defined in the Coasta! Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
19 Marina is defined in the Transport Operations (Maritime Polution) Regulation 1998.
20 Strategic port land tidal areas ate the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page S

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1045 MCU - Multiple Housing Type 2 Duplex -Middap Ditchfield Pty Ltd [As Published].pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.