Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

RFI - Att 3 - Engineers Response Letter

of 4

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                            ingeniir


The proposed development has a negligible increase in flows of only 2L/s in 1% AEP flows to the kerb so is
not considered capable producing a worsening of flows as there is minimal change to the existing catchment
characteristics.

If you wish to discuss this matter further, please contact Daniel Kenna.

Yours sincerely,



Daniel Kenna
Beng CPEng MIEAust RPEQ 15522 NER 3133685 EC 66121
for and on behalf of Ingeniir Pty Ltd




                                                Ingeniir Pty Ltd | 221304-RFI-01
                 ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                           Page 4 | 4
Log in to download the original file

RFI - Att 3 - Engineers Response Letter.pdf · 155 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.