07/1242 (part 3) - Approved Plans - 05/12/07 [As Published] · 142007.1242

of 64

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

 

REFER DWG. M3048/C41 FOR
STORMWATER CALCULATIONS.

 

 

 

 

 

 

 

EGEN

o— —— CATCHMENT BOUNDARY

 

 

 

 

 

 

 

 

TORMWA TE!

1 ALL STEEL GRATES AND FRAMES TO BE HOT DIPPED GALVANISED
AND SHALL BE CYCLE PROOF IN ACCORDANCE WITH AS 3996.

 

 

 

2. PIT SCHEDULE
“WEBFORGE’ OR APPROVED EQUIV.

SIZE IN TRAFFICABLE AREAS OTHER
900x600 MSG69B
600x600 MSG66B

LOTS
3. THE CONTRACTOR SHALL CONFIRM ALL LEVELS BEFORE COMMENCING

WORK,

A THE CONTRACTOR SHALL CONTACT ALL RELEVANT AUTHORITIES
AND LOCATE ALL SERVICES BEFORE COMMENCING WORK.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE
CAUSED TO SERVICES BY THE WORKS IRRESPECTIVE OF WHETHER
THE SERVICES ARE SHOWN ON THE DRAWINGS OR NOT.

5. LOCATION FOR INTERALLOTMENT DRAINAGE SHALL BE AS FOLLOWS:
> MIN 300% AC - OFFSET MIN 600mm FROM REAR AND
SIDE BOUNDARIES,
> MIN 600% AC - OFFSET MIN 600mm TO 1200mm FROM
REAR AND SIDE BOUNDARIES,
» MIN 900% AC ~ OFFSET MIN 1200mm FROM REAR ANO
SIDE BOUNDARIES.

WHERE SERVICES SHARE COMMON BOUNDARY (SAME SIDE! OFFSET
SHALL BE MIN. 600 WHERE POSSIBLE.

SEY

 

 

 

 

 

 

 

            

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

S {|
S ( M_ WATE ITY
LOT3 IMPROVEMENT DEVICE - SID
i . . ALL STORMWATER QUALITY IMPROVEMENT DEVICES (SQID) SHALL BE
. eee HUMECEPTOR STC 2 EXCEPT LINE 6 SHALL BE STC 7.
ort \ BAPMENT PERMIT CFEnallONAL WORKS no, 2037/tup-
N { xT i DATE . THE UNIT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS
\ ote : PUBLISHED INSTRUCTIONS INCLUDING FOUNDING, BACKFILLING AND
{ = DATE CONNECTIONS.
1 MAES
.---------_----------------------------- MEN DATE THE UNIT SHALL BE MADNTAINED BY THE CONTRACTOR DURING THE
=r F) CONTRACT PERIOD AND CLEANING MAY BE REQUIRED AT FREQUENT
I INTERVALS FOR THE UNIT TO FUNCTION AT FULL EFFICIENCY WHILST DEBRIS
I | ® vee AND SILT LEVELS ARE ELEVATED DURING CONSTRUCTION.
Nico :
I | Wim SES MAY THE PLAN & | aT THE END OF THE CONSTRUCTION PERIOD THE UNIT SHALL BE FINALLY
I i a ED FROM WITHOUT THE CLEANED OUT.
506 Jo7 I :
l | TWh 279
|
|
PRODUCTION =
= eee Se ea | ow aw w ww uw sw
meee | STORMWATER CATCHMENT PLAN
SCALE: 14000 @ At | id
NOTES: THLE: PROJECT: matt MARCH 2007 | at AS SHOWN
. 1 Ts the pragerty a the eageer, ext wor wt | ENN BARLOW GREGG Seepma_|STORMWATER CATCHMENT LOT RECONFIGURATION at = rat | ee
Erato myriad wey 8 tet | ey aan 700 mS Ace THD a PLAN LOT 1 SP 182880 canes wet | Patan Bartow
© reas Tichen ISSUE - vem BOY GANGES mena | btregesest a oy way mop resting acti, | |S Hain Seat, Muss: [SHEET 2 OF 2 EENIE CREEK ROAD oxo wee 91330
& [ror use 2. Fged dmessons take precedence wer sad oem Comal, CAST: ASSOOATED GAGUTARTS NOOSAVILLE PROJECT-SUBSET-SHEET -REVISION
4 leouck 9 woRis spenovay erwsoxs aval. 1 Voy o8 Gaecies w e CY sees menses KEN HICKS & ASSOCIATES
No. Amendment Date |By{No. Amendment Octe |By Cuore! pew on tea Ph: (07) 5443 2864 Fax: 107} $443 76 M3048 = C40 D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
7.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 (part 3) - Approved Plans - 05_12_07 [As Published].pdf · 7.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.