Skip to the record
Noosa’s premier civic archive.

Council archive · source document

07/1242 (part 3) - Approved Plans - 05/12/07 [As Published] · 142007.1242

of 64

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

04-5

ERECT SIGN

 

PAINT ee
SYMBOL

 

REFER PLAN M3048-C53 FOR ALL
LINEMARKING AND SIGNAGE DETAILS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8 R2-3A (L)
ERECT
R1~3(A) BICYCLE PATH PAVEMENT TREATMENT
04-2-3 LENGHT APPROX 20m. REFER LEGEND
ERECT DWG (53 FOR DETARS. LOT 4
st
2 oF
ERECT
ERECT TEMPORARY R2-3A (L)
D4~1~1(A) SIGN_G9-18 ERECT .
NO
om OT 5
one LOT
ERECT A 8
Ri-3(A) y sKCLE PATH PAVEMENT TREATHENT
HT APPROX 30m. REFER LEGEND
PANT She DWG (53 FOR DETAILS.
C Mo 8 Bs R1-3(A)
° a =
BICYCLE PATH PAVEMENT TREATMENT
NGHT APPROX 30m, REFER LEGEND ERECT vi E PAINT
DWG C53 FOR DETAILS. ‘8 D4-1=1(4) SYMBOL
GS ERECT
a
B ERECT J
PAINT
HL e SYMBOL
"B aS) "p
PAINT y °
svt BICYCLE PATH PAVEMENT TREATMENT
LENGHT APPROX 20m, REFER LEGEND KEEP
04-2- OWG C53 FOR CETAILS. LeFT
ERECT 4
BICYCLE PATH PAVEMENT TREATMENT R1-3(A)
LENGHT APPROX 20m. REFER LEGEND R2-3A (L)
OWG (53 FOR DETALS, x ERECT
as B
8 Tem
04-2-3
ERECT Be
LOT 2 ERECT BICYCLE PATH PAVEMENT TREATMENT
LENGHT APPROX 30m. REFER LEGEND
DWG (53 FOR DETALS,
‘ s wo 6 a B ea
beret tetas
“ee TRAFFIC CONTROL DEVICES
NOTES: TITLE: PROJECT: part, MARCH 2007 | stat: AS SHOWN
1 Ths i the property of the eagaeer, ent ney oot | AN BARLOW GREGG WiD>mAa_ TRAFFIC CONTROL DEVICES LOT RECONFIGURATION at cescate NRT | sno.
» |eamen eeveors run ba powetipelbaseeetrenspelanal B MAN T7 $1 $09 5S AEN TH 0? 3S LAYOUT PLAN LOT 1 SP 182880 ORAM NRT | Pel Barlow
© [FoR CONSTRUCTION ISSUE - MINOR BOY CHANGES wore |e Iefringenent ‘9 coy way aay result in lege! action, G” : teeny css SHEET 2 OF 3 EENIE CREEK ROAD care. arta #4990
& |SKYCLE PATH ROAD MARKING ADDED, SIGNS DELETED. 2. Figured dimensions take precedence over scaled. : ‘ASSOGATED CONSULTANTS PROJECT -SUBSET-SHEET-REVIS|
PRAH RAMP AND MEOIAN OPENING ADOED | wT CORAL AST: ON
4s LCOUNCN OP WORKS APPROVAL REVISIONS seras7oo wt 2 Verify ofl Gnensions an ste, C7 rena remiss TKEN HICKS & ASSOCIATES NOOSAVILLE
No, Amendment Gate [By[No Amendment Date }By cetera Proce On i547? _} Ph: (07) ShG3 2864 Fox: (07) SUL3 7146 M3048 - C55 D

 

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
7.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 (part 3) - Approved Plans - 05_12_07 [As Published].pdf · 7.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.