These devices are designed to minimise erosion at a construction
site and consequently decrease downstream sediment transport.
They include diversion drains, slope drains, energy dissipators
and level spreaders.
DIVERSION DRAINS may be formed as a cut drain, bank of berm
or a combination of both.
SLOPE DRAINS are generally stabilised drains which discharge water
from the end of a diversion drain down an exposed slope.
ENERGY DISSIPATORS leg: HAY BALES) may be necessary ot the
ends of slope drains.
LEVEL SPREADERS are excavated outlets constructed at zero grade
at the end of diversion drains to convert concentrated flow to sheet flow.
SEDIMENT CONTROL DEVICES
These devices are designed to remove sediment from runoff before it
leaves the site and includes temporery measures such as hay-bale
barriers and semi-permanent measures such as sedimentation basins.
all sediment traps require regular cleaning and should be checked after
each storm for damage and clogging by silt or debris.
LEVEL SPREADERS are temporary measures used to control sediment
transport. Depending on the time period over which they are expected
to operate in a satisfactory manner, level spreaders need to be checked
regularly due to clogging by sediment and general matter.
SILT FENCES are used in a similar manner to hay bale barriers
except that they are not intended to intercept cancentrated flow.
GULLY INLET PROTECTION is often necessary once road construction has
been completed and allotments and footpaths have been topsoiled and seeded.
FIELD INLET SEDIMENT TRAPS are formed either by over-excavating round
fietd intet or by the use of hay bales around a field inlet.
CULVERT INLET PROTECTION is often necessary where a natural channel
has been disturbed during construction of a man-made channel or to
control sediment transport resulting from the culvert construction itself.
MAXIMUM CATCHMENT AREAS FOR SEDIMENT CONTROL_DEVICES
Device Type Maximum Catchment Area
Diversion Drain 10 ha {depending on type)
Slope Drain 0.5 ha
Level Spreader 0,5 ha
ilt Fence 0.6 ha per 100m
Field Inlet Sediment Trap 1 ha
Grass Outlet Sediment Trap 2 ha
Stone Outlet Sediment Trap Zhe
Rip-Rap Outlet Sediment Trap 5S ha
Sedimentation Basin 10 ha for greater depending on design}
To ensure that oll works do not detrimentally affect the amenity of
the generat neighbourhood and the environment surrounds the following
measures should be addopted:
Provide a water truck on site for the duration of the contract period.
All topsoiled areas to be treated by surface spraying a minimum of
three’(3) times per day at maximum three (3) hour intervats, until
satisfactory ground cover is achieved.
“ROOS.
BEVELGE MENT PERM
CRE
BY.
in
AND SILT FENCE
IT GPERATIGNAL WORKS Ko. 2277,
ALOR BY
to. DATES. LE]
TYPICAL CATCH ORAIN
REFER OWG M3068/C07
COUNCIL
SA SHIR
(ae
Iv saceeeee
tettterefteres DATEL Lcd Vessco
DATEL ceefeeeeeeel
lo
TYPICAL SILT FENCE
REFER OWG H3048/C07-
Objective/target
Comply with all statutory regulations and maintain them
during construction and the maintenance period. Comply with
this erosion and sediment centrol plan, to control eresion
and sediment flows.
Management Strategy
Site foreman to identify and check direction of stormwater
land flows as shown on the plan. Provide barriers and other
measures shown on the plan to prevent stormwater flows
over embankments and sediments into catchpits.
Tasks/Actions
Erect sediment barriers at the top of embankments as
shown on the drawing. Strategically place check dams around
gully pits.
Performance Indicators
Site foreman to check erosion and sediment flows at the
base of embankments after rain.
Check that check dams are working during rain periods.
Frequency /Deadline
Site foreman to monitor performance after every heavy
downfall.
Organisation
Responsible Person/
Site foreman to be responsible for inspections
Reporting/Review
Site workers to advise foreman if they notice any barrier
needing repair.
Corrective Actions
Site foreman to report and order through supervisor, extra
barrier or check dams as required.
LAYOUT PLAN
SITE DESCRIPTION ¢ mw MH Fe SO he
LOTS 1 ON SP182880 le clr
PARisH OF TEWARTN sae wn EROSION CONTROL
COUNTY OF MARCH
OTES: TITLE: PROJECT: pate: MARCH 2007 | scout AS SHOWN
1 Ts isthe property of the ager, ant acy ot | GS BARLOW GREGG swacpana._| SEDIMENT AND EROSION LOT RECONFIGURATION at eae nat_| ero
2 eed eral ay @ et | nas 7 nae mo Aca ED CONTROL LAYOUT PLAN LOT 1 SP 182880 ane wet | Pater Bartow
+ Ieaneu seusons umn be Stopes ney erences owen | [ES “> SAGE COAST ruses, = SHEET 1 OF 2 EENIE CREEK ROAD cea we 41980.
c For COMSTRUCTION ISSUE - MINOR BDY CHANGES sanoser | WT 2. Figured imecsians take precedence over scaled. Po com AS, KEN HICKS & ASSOCIATES NOOSAVILLE PROJECT-SUBSET-SHEET-REV!:
y on ste. ( 7 Prune BT) Seek 0b -
Rol Amendeent “Date [By Amendment bare lel _ an ee werent aus | ton uss 2006, Fow {071 $463 16 M3048 - C05 D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 (part 3) - Approved Plans - 05/12/07 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.