Council archive · source document
07/1242 (part 3) - Approved Plans - 05/12/07 [As Published] · 142007.1242
Plans and drawings: the text below has words only, no drawings.
GENERAL NOTES
NOTWITHSTANDING THE LIMITS OF CUTTING AND FILLING SHOWN ON
THE ORAWINGS THE ACTUAL LIMITS SHALL BE OETERMINEO ON SITE
BY THE ENGINEER DURING CONSTRUCTION. FINISHEO SURFACE
CONTOURS MAY BE ADJUSTED BY THE WRITTEN DIRECTION OF THE
ENGINEER OURING CONSTRUCTION.
FILL AREAS SHALL BE CONSTRUCTED IN LAYERS NOT EXCEEDING
300mm LOOSE DEPTH. THE FILL MATERIAL SHALL BE COMPACTED
TG 98% COMPACTION AS MEASURED BY THE STANDARD METHOD
DESCRIBED IN AS 1289 UNO, TESTING SHALL BE IN ACCORDANCE
WITH AS 1289 (STANDARD COMPACTION). THE CONTRACTOR SHALL
SUPPLY TO THE ENGINEER CERTIFICATION OF THE COMPACTION
ACHIEVED. {LEVEL 2 MINIMUM INCLUDING A REPORT SETTING QUT
THE TESTING AND SAMPLING CARRIED OUT, THE LOCATIONS ANDO
LEVELS THEIR OF IN ACCORDANCE WITH AS-3798)
ALL EXISTING GRASSED AREAS DISTURBED OURING CONSTRUCTION
SHALL BE TOP SOILED AND GRASS SEEDEO.
EARTHWORKS QUANTITIES HAVE BEEN ESTIMATED USING:
STRIP DEPTH 150mm TO LOTS AND ROAD VERGES AND 300mm TO
ROAD BOX.
PRODUCTION ST
SITE LAYOUT PLAN
0 2 8 OO
1 1D 120m
at et
SCALE: 1:2000 @ Al
NOTES:
1. ALL CONTOURS SHOWN DEPICT NATURAL SURFACE
AND [email protected] INTERVALS
2, +24.50 (NDICATES FINISHED FILL LEVELS.
3. BATTER ALL FILL @ REAR AND SIDE BOUNDARIES
TO NATURAL SURFACE @ 1 in & Max.
4. ALL AREAS OF CUT & FILL INCLUDING ROAO
VERGES TO BE SEEOED TO ACHIEVE 80% STRIKE
WITHIN TWO WEEKS ANO 80% COVERAGE WITHIN
SIX MONTHS.
aa te
*RGD'D BY.
CKD BY. cece ’ .. DATE.
AMEND CXD BY.......A/4n.......DATE..2..
RECOMMENDED FOR APPROVAL
aM
wutGil
DEVELOPMENT PERMIT OPERATIONAL WORKS No
versepeveee DATE. ccelieeeced ” Meceeeees
Lisscoedl
Ley 282.
UNDER NO CIRCUMSTANCES MAY THE PLAN &
SPECIFICATIONS BE DEPARTED FROM WITHOUT THE
WRITTEN APPROVAL of the MANAGER LAND DEVELOPMENT
PLANS APPROVED
LEGEND
INDICATES AREA TO BE STRIPPED OF TOPSOIL
(150mm DEPTH}, FILLED AS SPECIFIED, &
RE-TOPSOILED TO FINISHED LEVELS INDICATED
{150mm OEPTH).
INDICATES AREA TO BE STRIPPED OF TOPSOIL
(150mm DEPTHI, & RE-TOPSOILED TO FINISHED
LEVELS INDICATED (150mm DEPTH).
5. FINAL LOCATIONS OF CONDUITS SHALL BE PROVIDED WHEN §, ALL EARTHWORKS TO BE CARRIED OUT IN
AVAILABLE FROM SERVICE AUTHORITIES. ACCORDANCE WITH A$-3798,
6 ML TESTING TO BE CARRIED OUT IN REFER DRAWINGS M3048/C09, C10, CHT & C12 FOR EXTENT
6. ONE PERMANENT SURVEY MARK IS TO BE PROVIDED IN ACCORDANCE . OF CUT AND FILL AREAS
WITH THE REQUIREMENTS OF THE SPECIFICATION BY CONTRACTOR IN ACCORDANCE WITH AS-3798.
: 7. ALL FLOW PATHS TO BE TURFED FULL WIDTH.
8. REFER DRAWINGS M3048/CO9, C10, C1 AND C12
SITE DESCRIPTION FOR CUT AND FILL AREAS.
LOTS 1 ON SP182880
PARISH OF TEWANTIN EARTHWORKS SITE LAYOUT
COUNTY OF MARCH
NOTES: TITLE: PROJECT: bate: MARCH 2007 | scat AS SHOWN
Uh ee poy oe exper, wt yt | BSN BARLOW GREGG Neeava [EARTHWORKS SITE LAYOUT | LOT RECONFIGURATION at sa ver_| somos
be wied, tpied, or reproduced whey, wi part B Ma Tt wo 3 ACH 495 HD PLAN, NOTES AND LEGEND LOT 1 SP 182880 Caw wat | Petr Barlow
without the express permissva of fhe exgneer. SUSIE. COAST: FRASER CLAST- eon wee #4930
© |rom consTRUCTOn ISSUE - woe BOY CHANGES rarer [et a eee || (|S fate cou cot EENIE CREEK ROAD CUECT -SUBSET -SHEET-REVISION
- we 2. Figured Gieensions take precedence ever scaled, 0, ta ™. CORAL COAST: AESOOATED COSA TANTS LE PR = I
1 ee ons aeRO evs eaeola 2 vey anes wt C7 mem 9 See [Re Hicks & associates | NOOSAVIL 3048 - C08 D
No. Amendment Date [By[No. ‘Amendment Date |By| ett Foceninsut | Ph: (07) S443 2864 Fox: (07) S663 7166 =
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 (part 3) - Approved Plans - 05/12/07 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.