ORDINARY MEETING AGENDA                                                                16 MAY 2019


3.   MCU18 0165 REQUEST FOR NEGOTIATED DECISION NOTICE FOR MULTIPLE
     HOUSING - TYPE 4 CONVENTIONAL (17 DWELLING UNITS) AT 25 KAURI STREET
     COOROY
     Committee Recommendation
     Moved:            Cr Jackson
     Seconded:         Cr Wellington
     That Council note the report by the Coordinator Planning to the General Committee Meeting
     dated 13 May 2019 regarding representations made to Development Approval No.
     MCU18/0165 for Multiple Housing - Type 4 Conventional situated at 25 Kauri St Cooroy and:
     A.   Agree to change conditions 21 and 29 as follows:
          21.    The full length of the Kauri Street and Olivine Street frontages of the development
                 site must be upgraded by providing kerb & channel, bitumen road widening,
                 stormwater structures and landscaping improvements to the footpath in
                 accordance with an Operational Works approval. The works must include but are
                 not limited to the following:
                 21.1. In regard to the Kauri Street frontage, the new kerb and channel must be
                       aligned so that it is offset 8 metres from the existing kerb and channel on the
                       western side of Kauri Street measured from the nominal face of the kerb. The
                       new works must be extended to the north of the subject site and be generally
                       in accordance with drawing number 2018068 – Dwg 04 of 24 titled External
                       Works Layout Plan dated March 2019 prepared by 360 Civil Consulting and
                       join smoothly with the existing formation.
                 21.2. In regard to the Olivine Street frontage the new kerb and channel must be
                       aligned at about 12m offset from and parallel to the property boundary and
                       must extend for the full frontage of the subject site. The works shall include
                       suitable tapers extending beyond the frontage of the subject site to smoothly
                       join to the existing pavement.
                 21.3. The works (Kauri Street, Olivine Street and the intersection) must include
                       suitable drainage structures and stormwater collection to ensure that runoff
                       from the road formation is collected, controlled and directed to ensure that
                       the roadway is safely trafficable and must be in compliance with the relevant
                       sections of the Queensland Urban Drainage Manual (QUDM).
                 21.4. As part of the application for operational works, the developer’s civil
                       engineering consultant shall investigate and report on the possible
                       deficiencies in the existing stormwater system, to the western end of Agate
                       Street and including inspection by closed circuit television (CCTV) of the
                       existing stormwater system. The developer is required to rectify any deficient
                       stormwater pipes or structures extending from the development frontage
                       down to and including the manhole downstream of the 600x1200 box culvert
                       which crosses Kauri Street.
                 21.5. The design and construction of all works shall be carried out in accordance
                       with Council’s Planning Scheme Policy PSP05 – Engineering Design
                       Standards – Roads, Drainage and Earthworks and the applicable
                       engineering standards current at the time of construction. The above
                       condition is imposed pursuant to s145 of the Planning Act 2016 being non-
                       trunk infrastructure.




                                                                                      Page 13 of 22
Log in to download the original file

2019-05-16 Ordinary Meeting Agenda(PDF, 780KB).pdf · 798 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.