Council archive · source document
08/0169 - Concurrence Agency Request for Further Info [As Published] · 132008.169
* ecoaccess environmental licences and permits Notice Information Request — EPA as Concurrence Agency Information Request EPA Project Reference Number: 323312 Date of Request: 21-APR-2008 Permit Type: Concurrence Response for a MCU within a coastal management district Act: ‘Integrated Planning Act 1997 Activity: MCU completely or partly within a coastal management district if the MCU involves certain operational work Information Required: Information addressing the land/activity Plans * Clarify the nature of each structure in the plans provided in Annexure A of the Development Application; * Provide a plan at a scale not smaller than 1:2500 showing the location, size and points of discharge of pipes or drains proposed for the discharge of stormwater, related by dimensions to the Real Property boundaries of the land; = Clarify the location of the coastal management district and erosion prone area boundaries in relation to the proposed change of use. Please note that the coastal setback line does not necessarily reflect the erosion prone area and coastal management district boundaries. Please provide this information in a plan scale at a scale no smaller than 1:25000 which includes all proposed structures (dwelling, pool, tennis court, studio, landscaping etc); = Provide information regarding the location of the storm tide natural hazard management area adopted by local government or if local government have not adopted a storm tide natural hazard management area, the plan should illustrate an alternative area subject to storm tide inundation; and = Provide details on the physical form of the site including topography and landforms, natural coastal processes (for example erosion and accretion), integrity of dune systems, vegetation, site drainage and natural surface runoff. Information Required: Information addressing key coastal plan policies The Development Application should demonstrate how the proposed development will not compromise coastal management outcomes and processes as per Policy 2.2.2 Erosion prone areas of the State Coastal Management Plan, 2001. Ideally, an engineering report should be prepared that demonstrates how intensification of existing development avoids or minimises adverse impacts consistent with solutions under the relevant sections of the State and Regional Coastal Management Plans — Queensland's Coastal Policy — Implementation Guideline for Development Assessment November 2007. Page 3 of 5 » AHO80109 , Environmental Protection Agency
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0169 - Concurrence Agency Request for Further Info [As Published]Related documentApplication case desk ↗
About this file
- File size
- 225 KB (small file)
- File type
No other editions are linked here.