CONNECTS TO
VILLAGE 1B ROOF LEGEND
BG Box Gutter
DP Downpipe
EG Eaves Gutter
LBB Line of Building Below
OH Overhang
MRS Metal Roof Sheeting
LBB
EG
EG
MRS
5.0° Pitch
MRS MRS MRS
20.0° Pitch
EG
6.0° Pitch 20.0° Pitch
LBB
LBB
EG
EG
M
5.0 RS
°P
itch
B B
10.01 10.01
LBB
EG
LBB
6.0° Pitch
MRS
LBB
LBB
EG
C C
10.01 10.01
MRS
10.0° Pitch
15.0° Pitch
MRS
EG
LBB
EG
LBB
Revision Project Architect Stage Project No.
01 Roof Plans Issue 18/08/2022 CYC Noosa Campsite CG DEVELOPMENT APPROVAL 1302-01 Roof Plan - Village 1a
02 Development Approval 25/08/2022 48 Kabi Road Cootharaba QLD
03 Village 1 Relocated 1/12/2023
Client
Christian Youth Council
Drawn
MF/MB
Status
PRE-CONSTRUCTION (NOT FOR CONSTRUCTION)
Scale
1:100 at A1 A-DA-V1-04.01 03
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. P:\Data 1\1302-01 CYC Noosa Campsite\5.2 Development Application\5.2.1 ArchiCAD\1302-01_Village 1 DA 24.pln
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.