RFI Response (rec. 4.09.25) S25-137 Stormwater Report_Optimized
Very large file (26.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
TABLE OF CONTENTS
1 INTRODUCTION .............................................................................................................. 1
2 SITE DESCRIPTION .......................................................................................................... 1
2.1 Location and Land Use ....................................................................................................................... 1
2.2 Lawful Point of Discharge................................................................................................................... 2
2.3 Upstream Drainage Connection ......................................................................................................... 2
2.4 Flooding.............................................................................................................................................. 2
3 STORMWATER QUANTITY MANAGEMENT ..................................................................... 2
4 STORM WATER QUALITY MANAGEMENT ....................................................................... 2
4.1 Operational Phase .............................................................................................................................. 2
4.2 Construction Phase ............................................................................................................................ 3
4.2.1 Erosion and Sediment Control ................................................................................................................ 3
4.2.2 Maintenance and Monitoring Requirements ......................................................................................... 4
5 CONCLUSION.................................................................................................................. 5
6 COMPANY DETAILS AND INSURANCE ............................................................................. 6
7 APPENDICES .................................................................................................................. A
Appendix A – Erosion Hazard Assessment ................................................................................................ A-1
Appendix B – Flood and Tidal Inundation Information ............................................................................. B-1
Appendix C – Preliminary Engineering Plans ............................................................................................ C-1
Appendix D – Site Survey & Architectural Drawings ................................................................................. D-1
LIST OF TABLES
Table 1 Pollutants typically generated during the construction phase ............................................................................ 3
Table 2 - Maintenance of ESC measures ........................................................................................................................... 4
LIST OF FIGURES
Figure 1 Indicative Site Location (Qld Globe, 2025) .......................................................................................................... 1
S25-137 Stormwater Management Report iii
Uncontrolled When Printed
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.