63. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
64. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
LANDSCAPING
Landscaping Works
65. The development site must be landscaped. The works must be undertaken in accordance
with an Operational Works approval and the Noosa Plan for that specific area and must
include in particular:
a. the works shown on the approved Landscape Concept plans shown in the Approved
Plans
b. Vegetation clearing within the site is to be offset through the rehabilitation of the area
of vegetation adjacent to Cooyar Street. The area is to incorporate revegetation works
that offset all native vegetation removal that is proposed on the site.
c. control of all weeds species listed in the following standards and legislation:
i. declared plants under the Land Protection (Biodiversity Act 2014 and sub-
ordinate Regulation 2016).
ii. Noosa Local Government Area Pest Management Plan 2015-2019.
66. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
67. All landscape works must be maintained generally in accordance with the approved design
for the life of the development.
Retention of Existing Trees
68. The existing Allocasurina littoralis within the Bushfire buffer associated with Lot 1 SP239726
must be retained in accordance with an Arborist Report (or part thereof) prepared by a
qualified person* and endorsed through an Operational Works approval
*(Refer to Advisory Note)
69. The existing Allocasurina littoralis in the south-eastern portion of the subject site must be
retained, except where required to be removed to accommodate the approved building, in
accordance with the recommendations of an Arborist Report (or part thereof) prepared by a
qualified person* and endorsed through an Operational Works approval.
*(Refer to Advisory Note)
70. Prior to the prestart meeting, a bank guarantee or a bond of $10,000 must be lodged as
security for the protection of the trees identified for retention in the conditions of this approval
listed within this Decision Notice. The bond:
Page 9 of 13
Document Set ID: 22515524
Version: 7, Version Date: 27/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original