Stage 4B- Civil Form 15 · OPW18/0155.02
Attached to the e-mail Generally in Accordance Request - 12-14 Serenity Cl, Noosa.
Department of Housing and Public Works
Form 15—Compliance certificate
for building design or
Version 4 – July 2017
specification
NOTE: This is to be used for the purposes of section 10 of the Building Act 1975 and/or section 46 of the
Building Regulation 2006.
RESTRICTION: A building certifier (class B) can only give a compliance certificate about whether building work
complies with the BCA or a provision of the Queensland Development Code (QDC). A building certifier (Class B)
can not give a certificate regarding QDC boundary clearance and site cover provisions.
1. Property description Street address (include no., street, suburb/locality and postcode)
This section need only be Serenity Close, Noosa Heads
completed if details of street
address and property description Postcode
are applicable.
E.g. in the case of Lot and plan details (attach list if necessary)
(standard/generic) pool design/shell Lot 100 on SP 305332
manufacture and/or patio and
carport systems this section may In which local government area is the land situated?
not be applicable. Noosa Council
The description must identify all
land the subject of the application.
The lot and plan details (e.g.
SP/RP) are shown on title
documents or a rates notice.
If the plan is not registered by title,
provide previous lot and plan
details.
2. Description of
Bulk Earthworks*
component/s certified
Clearly describe the extent of work Stormwater Drainage*
covered by this certificate, e.g. all Erosion and Sediment Control*
structural aspects of the steel roof
beams. Gabion Retaining Walls*
*Only as detailed on ‘’Referenced Documentation’’
NOTE: ALTA PROJECTS is not a specialist hazard assessment consultant. No assessment
of WPHS requirements, dangers to the public, trip hazards, etc has been carried out by this
firm and no such certification is provided or implied.
3. Basis of certification
Detail the basis for giving the QUDM
certificate and the extent to which AS/NZS 3500.3 Plumbing and Drainage – Stormwater
tests, specifications, rules,
standards, codes of practice and other AS3600- Concrete Structures
publications, were relied upon. AS3700- Masonry Structures
Insitu Testing carried out by Tate Professional Engineers.
Noosa Council design Guidelines
MCU 16/0143.01 dated 22 May 2018
QDC MP1.4- Acceptable Solutions
NCC Section B1 (only as applicable)
NCC Section F1 (only as applicable
Geotech Report 087682058 002 Rev.by Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
4. Reference documentation Drawings by Alta Projects :-
Clearly identify any relevant
documentation, e.g. numbered A6107-20-STG4B-EW00 to EW04
structural engineering plans.
A6107-20-STG4B-D01 to D04
A6107-20-STG4B-ESC01 to ESC04
LOCAL GOVERNMENT USE ONLY
Date received Reference Number/s
Page 3
5. Building certifier reference Building certifier reference number
number
6. Competent person details Name (in full)
A competent person for building work,
means a person who is assessed by Steve Harrison
the building certifier for the work as Company name (if applicable) Contact person
competent to practice in an aspect of
the building and specification design, Brah 101 Pty Ltd t/a Alta Projects Steve Harrison
of the building work because of the
individual’s skill, experience and Phone no. (business hours) Mobile no. Fax no.
qualifications in the aspect. The O7 5475 4125
competent person must also be
registered or licensed under a law Email address
applying in the State to practice the [email protected]
aspect.
If no relevant law requires the
Postal address
individual to be licensed or registered Po Box 559
to be able to give the help, the certifier
must assess the individual as having Cotton Tree Postcode 4558
appropriate experience, qualifications
or skills to be able to give the help. Licence or registration number (if applicable)
If the chief executive issues any RPEQ 4784
guidelines for assessing a competent
person, the building certifier must use
the guidelines when assessing the
person.
7. Signature of competent Signature Date
person 11TH February 2021
This certificate must be signed by the
individual assessed by the building
certifier as competent.
The Building Act 1975 is administered by the Department of Housing and Public Works