Original source · versioned page text
Changed Civil Plans
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnINDUSTRIAL DE ELOPMENT
TAYLOR CT
A
Engineering PTY LTD
COOROY LD
DA ID LOW WAY PEREGIAN EACH LD
IN O A ENGINEERING COM AU
Operational Works Application
PETER DONELAN
NORTH POINT
DRAWING SCHEDULE
Table
List
Sheet
NUM ER TITLE
HO GENERAL
LT 228-001-001 COVER SHEET
S
RD 228-001-002 GENERAL NOTES
EARTHWORKS & ROADWORKS
SITE LOCATION 228-001-100
228-001-200
SITE LAYOUT PLAN
EARTHWORKS LAYOUT PLAN
228-001-201 EARTHWORKS SECTIONS
228-001-202 RETAINING WALL DETAIL
CT
228-001-250 SEDIMENT & EROSION CONTROL PLAN
R
228-001-251 SEDIMENT & EROSION DETAIL
O
YL
228-001-300 GRADING & DRAINAGE LAYOUT PLAN
TA
228-001-301 PAVEMENT LAYOUT PLAN
228-001-302 SIGNAGE & LINEMARKING LAYOUT PLAN
STORMWATER
228-001-400 DRAINAGE CATCHMENT LAYOUT PLAN
228-001-401 DRAINAGE LONGITUDINAL SECTION
228-001-402 DRAINAGE CALCULATIONS TABLE
MISCELLANEOUS
228-001-700 CONCRETE & JOINTING DETAILS
VEHICLE SWEPT PATH
228-001-800 SWEPT PATH LAYOUT PLAN SHEET 1 OF 2
228-001-801 SWEPT PATH LAYOUT PLAN SHEET 2 OF 2
LOCALITY PLAN
PROPERTY DESCRIPTION PROJECT DESCRIPTION
LOT: PROJECT NAME:
1 1 TAYLOR COURT, COOROY QLD 4563
PLAN: PROJECT NO:
SP324340 228-001
LOCAL AUTHORITY: REVISION DATE:
NOOSA REGIONAL COUNCIL 12.07.22
LOCAL AUTHORITY APPROVAL NO: PLAN ISSUE:
OPW22/0134
FOR APPROVAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 16 pages
Page 2
GENERAL EARTHWORKS/ROADWORKS SEDIMENT AND EROSION
STORMWATER
·
·
·
·
·
·
LINEMARKING
ENERGY SERVICE PROVIDERS TELECOMMUNICATIONS
SERVICE PROVIDERS elstra Manual of Uniform Traffic Control Devices
BEFORE YOU DIG SERVICE LOCATIONS AGL
ERGON. AUSTRALIA
IT IS THE RESPONSIBILITY OF THE PRINCIPAL
ENERGY
energex ' yes' Telstra visionstream
CONTRACTOR TO CONTACT ALL RELEVANT origin OPTUS WARNING: OPTIC FIBRE NOTE: ALL SIGNS & LINE MARKING TO BE IN
SERVICE AUTHORITIES TO VERIFY THE NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
LOCATION OF ALL EXISTING SERVICES PRIOR PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO ACCORDANCE WITH THE MANUAL OF
PRIOR TO START OF CONSTRUCTION. PHONE DBYD PRIOR TO START OF CONSTRUCTION. PHONE DBYD
TO THE START OF CONSTRUCTION SERVICE LOCATIONS ON 1100 FOR DETAILS. SERVICE LOCATIONS ON 1100 FOR DETAILS.
BE CONFIRMED PRIOR TO START OF CONSTRUCTION. UNIFORM TRAFFIC CONTROL DEVICES.
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN GENERAL NOTES
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-002 REVISION C A1
Page 3
H H
M M
E ISTING LAYOUT PROPOSED LAYOUT
LEGEND
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN SITE LAYOUT PLAN
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-100 REVISION C A1
Page 4
UP
LEGEND
UP
UP
H
M
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN EARTHWORKS LAYOUT PLAN
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
228-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-200 REVISION C A1
Page 5
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN EARTHWORKS SECTIONS
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
228-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-201 REVISION C A1
Page 6
NOTES
TA LE RETAINING WALL PARAMETERS
CONCRETE SLEEPER WALL DETAIL
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN RETAINING WALL DETAIL
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
228-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-202 REVISION C A1
Page 7
NOTE
LEGEND
H
M
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN SEDIMENT & EROSION CONTROL PLAN
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-250 REVISION C A1
Page 8
STA ILISED SITE ACCESS
SEDIMENT ENCE
ARRIER ENCE
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN SEDIMENT & EROSION DETAIL
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-251 REVISION C A1
Page 9
UP
LEGEND
UP
UP
H
M
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN GRADING & DRAINAGE LAYOUT PLAN
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
228-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-300 REVISION C A1
Page 10
UP
UP
UP
LEGEND
H
M
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN PAVEMENT LAYOUT PLAN
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-301 REVISION C A1
Page 11
H
M
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN SIGNAGE & LINEMARKING
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
DATUM: AHD LAYOUT PLAN
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-302 REVISION C A1
Page 12
H
M
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN DRAINAGE CATCHMENT LAYOUT PLAN
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-400 REVISION C A1
Page 13
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN DRAINAGE LONGITUDINAL SECTION
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-401 REVISION C A1
Page 14
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN DRAINAGE CALCULATIONS TABLE
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-402 REVISION C A1
Page 15
A
A -
-
A
-
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN CONCRETE & JOINTING DETAILS
DATUM: AHD
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-700 REVISION C A1
Page 16
UP
UP
LEGEND
UP
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN SWEPT PATH LAYOUT PLAN
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
DATUM: AHD SHEET 1 OF 2
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
PROJECT NO:
228-001
GWA LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-800 REVISION C A1
Page 17
UP
LEGEND
UP
UP
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
PETER DONELAN SWEPT PATH LAYOUT PLAN
C 12.07.22 REVISED TO SUIT COUNCIL RFI QT GWA
DATUM: AHD SHEET 2 OF 2
B 07.04.22 CARPPARK ADJUSTED
A 21.01.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
228-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
24.01.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
1 TAYLOR COURT, COOROY QLD 4563
No. DATE REVISIONS BY CKD OPW22/0134 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 228-001-801 REVISION C A1