Original source · versioned page text
2017-07-20 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 20 JULY 2017
Plan No. Rev. Plan/Document Name Date
DA-02 P5 Site Plan, prepared by Red Dog Architects 19/10/2016
DA-05 P5 North Elevation, prepared by Red Dog Architects 19/10/2016
DA-06 P5 South Elevation, prepared by Red Dog Architects 19/10/2016
DA-07 P5 East & West Elevations, prepared by Red Dog 19/10/2016
Architects
DA-08 P5 Signage Plan, prepared by Red Dog Architects 19/10/2016
27. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and the Queensland Urban Drainage Manual, and
must include in particular:
e) A stormwater quality treatment system. The stormwater treatment must
generally be in accordance with the Stormwater Management Plan for
Highway Service Centre Cooroy, project number 161968 by Covey
Associates, dated October 2016 except where alteration to the inclusion of
proprietary water quality treatment devices are necessary to achieve the
following objectives as predicted in MUSIC modelling in accordance with
the Water by Design MUSIC modelling guidelines.
State Planning Policy SEQ Water Development
Guidelines: Development
Guidelines for Water Quality
Management in Drinking Water
Catchments (SEQ Water 2012)
Total Suspended 9080% reduction
Solids compared to an
unmitigated development
Total 60% reduction compared No increase in pollutant loads
Phosphorous to an unmitigated compared to a Vacant Industrial
development Allotment
Total Nitrogen 45% reduction compared
to an unmitigated
development
Where proprietary water quality treatment devices are included within the
stormwater quality treatment strategy, evidence of a signed contract for a
minimum period of 10 years for maintenance of the proprietary stormwater
quality treatment device must be provided to Council prior to
commencement of use.
B. Delete condition 27 k).
Page 7 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.