MCU21-0110 - Representations to conditions of approval.pdf
commute to work and up to another five (5) customers use
a bicycle to travel to the fitness facilities each day. Existing
bicycle parking allocations within the clubhouse grounds
are adequate for that use. The other parts of this condition
are acceptable.
The provision of 53 spaces, either incorporating or in
addition to the existing use, is considered excessive and
unnecessary and out of proportion to the current use and
expected demand. It is suggested a revised requirement of
20 bicycle spaces would be more than adequate having
regard to the nature of the proposed use and existing
facilities.
56. Operating roof water harvesting The original rainwater harvesting tank volume was based Please replace 135,000 litres with 54,000 litres
tanks must be provided for the on the evaporation rates calculated for a significantly consistent with the amended pool design having a
development. The tanks must be larger pool surface area. The size of the swimming pools substantially reduced surface area.
provided in accordance with an was reduced significantly as part of the minor change. In
operational works approval and must particular, the pool surface area has reduced by
include in particular: approximately 60% and a revised capacity of 54,000 litres
reflects this proportional change.
(a) a total tank capacity of 135,000 litres
Although part of the landscaped areas within the hotel
may be irrigated from the freshwater harvesting, a
significant proportion on the landscaped areas would be
irrigated from the Noosa Springs irrigation system that
draws water from the freshwater lakes of Noosa Springs. It
is noted that any rainwater not harvested and stored in the
tank at the hotel would flow into the drainage system that
eventually discharges into the freshwater lakes of Noosa
Springs. Therefore, using that Noosa Springs lake water for
irrigation purposes is making productive use of the
rainwater harvested in another manner and does not
require use of potable water.
-5-
[OCR of page images]
56. Operating roof water harvesting
tanks must be provided for the
development. The tanks must be
provided in accordance with an
operational works approval and must
include in particular:
(a) a total tank capacity of 135,000 litres
commute to work and up to another five (5) customers use
a bicycle to travel to the fitness facilities each day. Existing
bicycle parking allocations within the clubhouse grounds
are adequate for that use. The other parts of this condition
are acceptable.
The provision of 53 spaces, either incorporating or in
addition to the existing use, is considered excessive and
unnecessary and out of proportion to the current use and
expected demand. It is suggested a revised requirement of
20 bicycle spaces would be more than adequate having
regard to the nature of the proposed use and existing
facilities.
The original rainwater harvesting tank volume was based
on the evaporation rates calculated for a significantly
larger pool surface area. The size of the swimming pools
was reduced significantly as part of the minor change. In
particular, the pool surface area has reduced by
approximately 60% and a revised capacity of 54,000 litres
reflects this proportional change.
Although part of the landscaped areas within the hotel
may be irrigated from the freshwater harvesting, a
significant proportion on the landscaped areas would be
irrigated from the Noosa Springs irrigation system that
draws water from the freshwater lakes of Noosa Springs. It
is noted that any rainwater not harvested and stored in the
tank at the hotel would flow into the drainage system that
eventually discharges into the freshwater lakes of Noosa
Springs. Therefore, using that Noosa Springs lake water for
irrigation purposes is making productive use of the
rainwater harvested in another manner and does not
require use of potable water.
Please replace 135,000 litres with 54,000 litres
consistent with the amended pool design having a
substantially reduced surface area.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (MCU21-0110 - Representations to conditions of approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.