Council archive · source document
IC0312NAM0023_SC14262_120405_Signed RAR_GMc · MCU12/0023
Attached to the e-mail MCU12/0023 Referral agency response (advice & concurrence) - DERM.
DERM Permit number: SPCL03954612 barrier, issuance of the standard UXO warning (see Condition 2) may suffice while the structure, stockpile or barrier remains in place. Where a structure is to be removed or reduced as part of the development program, protective precautions, commensurate with any greater risk to which workers might then be exposed, may need to be considered. Progressive assessment will be necessary where such circumstances exist. Unless, at the completion of preliminary works, there is evidence then available to the UXO contractor that any residual risk is negligible, the use of detection equipment will typically be required to confirm the site’s status. Where investigation, along with any subsequent remedial action and assessment, is to be implemented by stages to satisfy Conditions 1 and 4, a preliminary investigation report should be submitted by the applicant to DERM along with a management plan for the proposed work. Staged investigation/remediation is most likely to be applicable where development of smaller, built-on lots (which can present circumstances such as those discussed above) or broadhectare sites is proposed. In such cases, DERM's assessment of the report and advice to Council in regard to approval of the development will be dependent on agreement with the management plan. Where Condition 1 is to be satisfied by a whole lot or broadhectare development stage being subjected to investigation and any necessary remedial action, DERM, based on the subsequent investigation/remediation report's findings and recommendation/s, may reassess the lot, or that portion comprising the development stage, as being remediated or not needing remediation, and advise the applicant and Council accordingly. Otherwise, any balance of land that has not been further investigated will retain the risk assessment made by Defence and DERM's Area Management Advice will continue to apply. This is unless evidence obtained from the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the balance. In the latter case, DERM may reassess all of the balance or the applicable part/s as being unaffected by UXO. Enquiries: Ranald Scott, Project Manager (UXO) — Department of Environment and Resource Management Ph: (07) 5459 6129 Fax: (07) 5459 6190 email: [email protected] END OF CONDITIONS Page 4 of 4 * 091217 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IC0312NAM0023_SC14262_120405_Signed RAR_GMc.pdfRelated documentApplication case desk ↗
About this file
- File size
- 334 KB (small file)
- File type
No other editions are linked here.