NBN Planning Report_Cooran
Attached to the e-mail MCU15/0034 Development Application - Cover letter, Forms, Proposal plans & Planning Reports.
incorporated in SPP July 2014 and are primarily related to environmental offsets and coastal
hazards.
The SPP consolidates the state's 16 interests across five broad themes as follows:
• Liveable communities and housing;
• Economic growth;
• Environment and heritage;
• Hazards and safety; and
• Infrastructure
The SPP is required to be assessed as part of the development application as the SPP has not yet
been integrated into the Noosa Plan. In this instance the proposed development requires
assessment against the ‘interim development assessment provisions’ as outlined in Part E of the
SPP.
In accordance with Part E interim development assessment provisions of the SPP, there are three
(3) codes triggered and addressed in Table 6.2 below.
Table 6.2 - State Planning Policy Codes
State Interest Assessment Compliance
Biodiversity – A development application where The subject site is identified
• MSES - Wildlife the land relates to a matter of state under the SPP mapping as
environmental significance, if the containing Wildlife Habitat,
habitat
application is for: Regulated Vegetation
• MSES – Regulated (intersecting a watercourse) and
(a) operational work, or
Vegetation wetlands (riverine).
(b) a material change of use
(intersecting a The proposed facility is not
other than for a dwelling house, or
watercourse) considered to negatively impact
(c) reconfiguring a lot that
• MSES – Wetlands on Matters of State
results in more than six lots or lots
(riverine) Environmental Significance
less than five hectares.
(MSES), for the following
reasons:
Development: • The facility and proposed
(1) enhances matters of state extension to the existing
environmental significance where access route has been
possible, and
located outside of the
(2) identifies any potential significant
identified MSES areas;
adverse environmental impacts on
matters of state environmental • The proposed development
significance, and does not require vegetation
(3) manages the significant adverse clearing; and
environmental impacts on matters of • All construction activities
state environmental significance by will be managed to avoid
protecting the matters of state any sediment run-off during
environmental significance from, or the construction period in
otherwise mitigating, those impacts.
accordance with NBN’s
contractor’s Construction
Environmental Management
Plan.
Water Quality – Water quality is to ensure The proposed
• Climatic regions: development is planned, designed, telecommunication facility will
stormwater constructed and operated to manage not negatively impact on water
management design stormwater and wastewater in ways quality, for the following
NBN-4BBZ-4GYM-5132-Schreibers Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.