Skip to the record
For the highest quality transcripts.

Council archive · source document

20197687 - 20 Mcanally Dr Sunshine Beach - Alterations_Additions to Detached Dwelling & Construction of Pool Fe - OPW Plans · OPW19/0178

Attached to the e-mail Operational Works Applications OPW19/0178 - 20 Mcanally Dr Sunshine Beach.

of 7

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Drawing Schedule:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

         

      
  
  

 

 

   
   

      

   

 

   

 

 

 

 

 

 

 

 

 

 

 

 

   
    

 

 

 

 

Dwg # |Drawing Title Size | Scale} |Dwg # |Drawing Title Size | Scale
000 Cover Sheet A3__[NIS 512 Powder Room Joinery a3 [1:20
000 General Notes A3__[NIS 513 Powder Room Joinery a3 [1:20
001 Location Plan A3__ [1500 514 Media Room Joinery a3 [1:20
002 Site Plan AS [1200 515 Media Room and Comms. Cpd J... [A8__ [1:20
008 Survey A3___[1:200 516 Master Bedroom Joinery a3 [1:20
101 Exising Lower Ground Floor Plan [A3__|1:100 8i7 Master Bathroom Joinery a3 [1:20
102 Exising Ground Floor Plan AS [1100 518 Master Bathroom Joinery A3__ [1:20
103 Existing Fist Floor Plan AS [1100 519 Master Bathroom Joinery a3 [1:20
104 Existing Roof Plan AS [1100 520 Master Bathroom Joinery a3 [1:20
105 Lower Ground Floor Demolition Plan] A3__|1:100 521 Master Bedroom Joinery A3_[1:20.1
106 Ground Floor Demolition Plan AS [1100 522 Master WIR 2 Joinery a3 [1:20 Ar
107 First Floor Demolition Plan AS [1100 523 Master WIR 2 Joinery a3 [1:20 | ii
108 Roof Demolition Plan AS [1100 524 Master Study Joinery a3 [1:20
109 Proposed Lower Ground Floor Plan [A3__|1:100 525 Laundry Joinery a3 [1:20
10 Proposed Ground Floor Plan AS [1100 526 Laundry Joinery a3 [1:20
mM Proposed First Floor Plan a3 [1100 527 Ensuite 1 Joinery a3 [1:20 I
112 Proposed Roof Plan AS [1100 528 Ensuite | Joinery a3 [1:20 ri
113 Undercroft Plans A3___[1:200 529 Ensuite 2 Joinery a3 [1:20
121 RCP Lower Ground Floor AB 1:100 530, Ensuite 2 Joinery AB 1:20 i Te
122 RCP Ground Floor Plan AS [1100 531 Ensuite 3 Joinery A3__ [1:20
123 RCP First Floor Plan AS [1100 532 Ensuite 3 Joinery a3 [1:20 7m a
131 Set Out Lower Floor Plan AS [1100 533 Ensuite 3 Joinery a3 [1:20
132 Set Out Ground Floor Plan AS [1100 534 Bed | Desk Joinery a3 [1:20 Jt!
133 ‘Set Out First Floor Plan a3 /1:100 535 Robe | and Linen | Joinery AB | 1:20 J tn
134 Framing Lower Floor Plan AS [1100 536 Robe 2 and Linen 2 Joinery a3 [1:20
135 Framing Ground Floor Plan AS [1100 537 Bed 3 WIR 1 Joinery a3 [1:20
136 Framing First Floor Plan AS [1100 538 Garage Bathroom Joinery a3 [1:20
201 Elevations AS [1100 539 Garage Bathroom Joinery a3 [1:20
202 Elevations AS [1100 540 intemal Details a3 [1:20
208 Elevations AS [1100 S41 Stair Details A3__ [1:50
301 Sections AS [1100 542 Stair Details A3__ [1:50
302 Sections AS [1100 543 Stair Details a3 [1:50
303 Sections AS [1100 ‘a4 Stair Details a3 [120.1
304 Sections AS [1100 545 Construction Detais a3 [10
305 Sections AS [1100 a6 Construction Details a3 [10
401 Door Schedule A3__ [1100 S47 Construction Details a3 [10
402 Window Schedule A3__ [1100 548 Construction Details a3 [10
403 Window Schedule A3__ [1100 549 Construction Details a3 [10
404 Window Schedule A3__ [1100 601 Electrical Lower Floor Plan A3___| 1100 ~T
501 Kitchen Joinery AB 1:20 602, Electrical Ground Floor Plan A3 1:100 a
502 Kitchen Joinery A3__ [1:20 603 Electrical First Floor Plan A3___[ 1100 ’
a nN
504 Panty Joinery A3__[1:20 Of
505 Cellar Joinery AB [1:20,1 Hey taal
506 Cellar Joinery As [1:20 See &,¢
507 Living Room Joinery AS [120 &
508 living Room Joinery 3 1:20 y aa
509 Wet Bar Joinery A3__[120 Yat
510 Wet Bar Joinery A320
su Wet Bar Joinery AZ [1:20 {
Ms wos 620 460 here NOTES : Client : Drawing Title Project No: Drawn by: | Date:
[email protected]
S A R A H see nace Snderten witeu! he expres writen permision of Seran Water Arentectwe. | | ANG@la Flannery + Dave Poddar| |Design Documentation Stage STN — we a ee
GENERAL NOTES: Use wien cimensions only, DO NOT scale drawings

WALLER

 

Member Levels

Contractors to vetty al dimensions on ste prior to commencing works
These drawings are to be read in conjunction with engineer's design an
details, the accompanying Specification and Schedule of Finishes. in
doubt, please request clafication. DO NOT ASSUME,

nd

 

 

20 McAnally Drive, Sunshine
Beach Qld 4567

Location Plan 1:500@A3 |G

 

 

 

 

 

 

 

mus CT Chitecture

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20197687 - 20 Mcanally Dr Sunshine Beach - Alterations_Additions to Detached Dwelling & Construction of Pool Fe - OPW Plans.pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.