Table 10: Structure 6-1 AEP1% inflows and outflows
In both the major and minor events, the climate change adjusted post development flows have been
effectively mitigated such that the outflows to the existing stormwater network are lower than the
predevelopment flow. It is therefore confirmed that Acceptable Outcome 2.4 of the water quality
and drainage code has been achieved.
The model also confirms that there is sufficient capacity in the external pit to take all flows from the
development. We trust that this Technical Memorandum, in conjunction with the amended civil
drawings, is sufficient to evidence to council that the stormwater quantity measures have been
designed to mitigate the 20% increase in rainfall allowing for climate change.
All other engineering items within the Decision Notice for application OPW24-0202 dated the 11th of
August 2025, have been addressed within the engineering drawings.
Please contact the undersigned for any further clarifications:
➢ Email- [email protected]
➢ Phone- 0451453640.
Eoin Whitmore, Associate Engineer
RPEQ Number: 31423
Date: 26/09/2025
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.