Original source · versioned page text
Compiled Reference Documents - MCU24/0153 & OPW24/0202
Very large file (10.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
LEGEND LANDSCAPE PLAN (ROOF)
STREET TREE GARDEN WITH TIMBER EDGE
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 1
PLANTING TO COUNCIL FOOTPATH
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 2
MULCHED GARDEN WITH TREES
Refer to Plans, Specification Notes, Finishes
Schedule, Typical Details & Plant Schedule 3
TURF
Refer to Plans, Specification Notes & Finishes
Schedule
8 MYO par 2 DIA cas
DECORATIVE STONE
Refer to Plan, Specification Notes y 1 PAN tec 12 DIC arg
undar
& Finishes Schedule rty Bo
Prope 10 CIS ell
DECORATIVE BRICK PAVER
Refer to Architects For Further Information
25 DIC arg
1 PAN tec
STEPPING STONE 1 PAN tec
Refer to Plan, Specification Notes 8 MYO par
& Finishes Schedule 5 CAL lit 8 MYO par 16 CAS cou
MULCHED ACCESS PATH (500mm)
Refer to Plan, Specification Notes
10 CIS ell 15 LOM lit
& Finishes Schedule 2 JUN con
TIMBER EDGE 1 DIA cas
TE Refer to Plan, Typical Details, Specification
Notes & Finishes Schedule
1 PAN tec
STEEL EDGE (CORTEN)
SE Refer to Plan, Typical Details, 25 LOM lit
Specification Notes & Finishes Schedule
15 CAS cou
1 DIA cas
PROPERTY BOUNDARY 4 CAL lit
Refer to Plans & Specification Notes 5 JUN con
Spa
1 PAN tec
WARNING
THE LOCATION OF EXISTING & PROPOSED TELSTRA,
ELECTRICITY, SEWERAGE, STORMWATER & WATER ARE
SHOWN SCHEMATICALLY ON THE DRAWINGS. PRIOR TO
& DURING CONSTRUCTION OBTAIN THE LOCATION OF Pool
ALL SERVICES (UNDERGROUND & OVERHEAD) FROM 30 LOM lit
THE RESPONSIBLE AUTHORITY & DESIGNER
RESPONSIBLE FOR THE SERVICE SHOWN. 10 DIC arg
10 CAL gbf
5 MYO par
1 PAN tec
Spa
4 JUN con
1 DIA cas 1 PAN tec 6 DIC ar
3 JUN con
40 ZOY ten 6 CAL lit
Pool
7 DIC arg
1 PAN tec
15 LOM lit 14 CAS cou
1 DIA cas 2 DIA cas
15 CAS cou
5 MYO par 4 JUN con
1 DIA cas 10 CIS ell 1 PAN tec 8 MYO par 10 DIC arg
1 PAN tec
Property Boundary
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24111298 NORTH
0 0.5 1 1.5 2 2.5
FILE: 250321 D 21.03.25 ARCH BASE UPDATE CK TH
ArchEnd 51 Elanda St, Sunshine Beach Landscape Works DWG. No. LP5 C 27.11.24 COUNCIL SUBMISSION CK TH
SCALE 1:100 @ A3 anembo consultants pty.ltd. A.B.N. 75 089 473 156
SHEET 10 OF 10 B 21.11.24 FOR REVIEW CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: LANDSCAPE PLAN APPROVED:
A 11.11.24 FOR REVIEW CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental
Development Lot 403 on RP 48112 Landscape Operational Works (ROOF) CATEGORY: MHD ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.