        1.              Introduction
        This report details the results of a geotechnical investigation undertaken for a proposed unit
        development at 51 Elanda Street, Sunshine Beach. The investigation was performed by Tectonic for
        Archend, generally in accordance with Proposal P24478-Rev0, dated 9 August 2024.
        The investigation comprised drilling of boreholes at four locations across accessible areas of the
        development footprint. This report summarises the results of the investigation and provides
        geotechnical recommendations regarding earthworks and footings, together with advice for temporary
        and permanent basement retention.
        In summary, subject to the implementation of the recommendations made herein, it is assessed that
        there would be a Low Risk of slope instability affecting the proposed development in accordance with
        the Australian Geomechanics Society Guidelines for Landslide Risk Management, dated March 2007 (AGS
        2007).



        2.              Proposed Development
        Design details provided to us indicate that the development will comprise a three-storey building, over a
        basement carpark covering most of the site. The construction will include a combination of masonry
        walls and reinforced concrete floors with various architectural finishes to the walls. Excavations for the
        development will be in the order of up to 7 m deep in the upslope area adjacent to Elanda Street with
        the basement level shallowing to about 2 m to 3 m deep downslope to the east. Localised filling less
        than 1 m high is anticipated. Excavations are expected to extend close to the site boundaries and
        therefore, some form of temporary retention will be required. Isolated deeper excavations may be
        required for the lift overrun pit and other elements.
        Extract from the design drawings provided by Archend are provided below in Text Figure 1.




                                       Text Figure 1: South elevation plan (courtesy Archend)


        Proposed Unit Development
        30 September 2024 | 24265-001-Rev0                                                                       1
Document Set ID: 23376055
Version: 1, Version Date: 28/11/2024
Log in to download the original file

Compiled Reference Documents - MCU24_0153 & OPW24_0202.pdf · 10.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.