               4.     IRRIGATION                                                                          ANNUAL MAINTENANCE REGIME - SCHEDULE
                                                                                                          TASK                       FREQUENCY                            PERFORMANCE INDICATOR
                                                                                                                                                                                                                                                                                                                                                      APPROVED PLAN
               Following notes describe the requirements for tender, design, supply and                                              Weekly: November - February          Maintain turf to present consistent &                                                                                                                                    MCU24/0153 & OPW24/0202
                                                                                                                                     Fortnightly: March - April           vigorous appearance, mow to
               installation of the irrigation system:
                                                                                                          Mowing                     Monthly: May - August                30mm high
                                                                                                                                                                                                                                                                                                                                                      NOOSA COUNCIL
               · The scope of the irrigation design will be for the areas nominated on the plans by
                 project manager.                                                                                                                                         Maintain turf neatly against any
                                                                                                                                                                                                                                                                                                                                                     15 DECEMBER 2025
                                                                                                                                     Weekly: November - February
               · Provide Irrigation system design in pdf & AutoCAD format to all nominated garden                                    Fortnightly: March - April           edge & around any service or
                 areas for the Project Manager and Landscape Architect review prior to pre start          Trimming                   Monthly: May - August                respective cover
                 and initiation of project.
                                                                                                          Spraying / Wick            Every 2 weeks October - March        No weeds or grass taller than plant
               · The design will be based on a single point of mains nominated with supply having         wiping                     Every 4 weeks April - September      within 500mm of plants
                 222Kpa static pressure (Hoc) out of the water main. Other supply points are
                 available if required so the design will need to nominate locations and numbers of                                                                 100mm minimum required depth &/or
                                                                                                                                                                    mulch adequate to suppress weed
                 further supply.
                                                                                                          Re-mulching                Once during MP & once per year growth & maintain soil moisture.
               · The system will generally include:
                 - Hunter 'Hydrawise' WIFI Controller and decoder system                                                             Inspect planting at the start of
                                                                                                                                     Spring & assess damaged, dead To achieve minimum design
                 - All wires and cabling as required & Rain sensor to be roof mounted                                                                                 planting densities and garden
                                                                                                                                     or unhealthy plants. Replant as
                 - Cabinet inside toilet storage room with conduits out provided                          Re-planting                required.                        cover
                 - Reduced pressure zone device for backflow prevention and Form 9 Certification
                 - Pipework including: 63-50mm main supply lines and 50 - 25mm lateral lines                                         Every 2 or 3 days during EP,
                                                                                                                                     weekly during MP, or as required Plants exhibit healthy growth &
                 - All conduits under paths and infrastructure to be marked with a bronze plaque                                     to maintain adequate soil moisture. no signs of drought stress
                                                                                                          Watering
                   with letter i.
                 - Valves and fittings as required including: master valve, flow monitoring device,       Fertilising - required
                                                                                                          where & when plants
                   electric solenoid valves, air vacuum release valves, isolating valves, quick
                                                                                                          are not responding to Once during MP or as required             Plants appear healthy exhibit
                   coupling valves and associated valve boxes                                             slow release fertiliser                                         good rate of growth.
                 - Pop up emitters and fittings as required including: To garden areas install pop up     applied at planting
                   fan sprays on aluminum casings where required.
                                                                                                                                     As required where plants require
               · Provide a system installation work method specification that includes:
                                                                                                                                     support. Allow to stake 20% of
                 - a system establishment monitoring and management program for 3 months post                                        trees during EP. Allow to stake      Plants growing in an upright manner
                   practical completion.                                                                                             further 20% of trees during MP
                                                                                                          Staking
                 - Twelve month guarantee, maintain against faulty workmanship & materials for
                   system from date of practical completion.                                              Inspection for storm       Following storm event, heavy
                                                                                                                                                                          Any damage noted and recitifed
                 - Provide cad 'as built' drawing when applying for practical completion clearly          damage                     rainfall or high winds
                   showing main-line runs & sizes, valve types / station numbers / designed                                                                               Plants have desired natural form &
                                                                                                          Pruning - to promote Monthly during EP, every 3
                   pressure at valve, head types & locations.                                             healthy plant growth months MP & beyond                         display healthy growth
                 - Attendance at Practical completion inspections
                 - Supply and install the approved irrigation system to all nominated garden areas.
                 - Refer to the Project Manager and Landscape Architect for any clarifications                                       EP - Provide a report to SUPER       Scheduled activities carried out.
                   during the life of the project                                                                                    on establishment progress at         Successful establishment.
                                                                                                          Monitoring                 each progress payment claim.         Scheduled maintenance activities
                 - GPO and controller mounting space will be nominated by Project Manager.
                                                                                                                                     MP - Provide completed activities    carried out. Successful
                 - Water Meters provided by the Body Corp for RPZ and mains connections                                                                                   maintenance
                                                                                                                                     list to SUPER after 3 months
                 - Liaise with Unity Water for relevant applications and certifications if required.

                                                                                                          FINISHES SCHEDULE
               5. MAINTENANCE MANAGEMENT                                                                  CODE ITEM                                       PRODUCT / DESCRIPTION                        SIZE / PATTERN                                       FINISH                                                                  COLOUR
               PRACTICAL COMPLETION / ON MAINTENANCE                                                                                                                                                   Top Soil & Soil preparation - As                     Smooth, uniform, & weed free
                                                                                                                                                          Imported site topsoil:
                                                                                                                       Top soil                                                                                                                             topsoil mulch surfaces, with no                                           As supplied
               · The Landscape Contractor shall consolidate the landscape works and make good                                                             Refer to specifications                      per Specification, per plan
                                                                                                                                                                                                       nominated areas.                                     deleterious materials.
                 all defects for practical completion.
               · At practical completion the Landscape Contractor shall arrange for an "On"                                                                                                                                                                 Uniform finish 100mm deep, free of deleterious
                 maintenance inspection with SUPER and SCC.                                                          Mulch Type 1 (Organic)               Street Tree garden/pt and gardens                                                                 materials. General garden areas                                           As supplied
                                                                                                                                                                                                       25mm + Ø +, composted
                                                                                                                                                          - Hoop Pine
               · Supply soil report along with required ameliorant's, Agronomist certification, Soil
                 depth photographic evidence with certification.
               · Supply as 2305 certification to SUPER                                                               Mulch Type 2 (Inorganic)             Decorative Stone To Access Pathways          20mm Ø nominally                                     Washed - Uniform Finish Over Geofabric                                    Black
               · The annual maintenance regime schedule describes the maintenance tasks,
                 frequencies and key performance indicators that the maintenance contractor is to                                                                                                      Top Soil as per general notes -
                                                                                                                                                          Zoysia - Couch/Bermudagrass                                                                       Smooth flowing, even & positively                                         Bright green
                 follow.                                                                                               Turf Type 1                        A-Grade, free of pests and weeds             150mm deep
                                                                                                                                                                                                       Turf Rolls (Sod)                                     draining grades
               MONITORING
               · Regularly inspect all landscape works to monitor during construction,                          TE
                                                                                                                     Edge Type 1:                         As Per Detail                                As Per Detail                                        As Per Detail                                                             As Per Detail
                 establishment and maintenance.                                                                      Timber Edge
               · Review periodically to adjust, in consultation with SUPER, to suit changing
                 conditions.                                                                                         Edge Type 2:
                                                                                                                SE                                        As Per Detail                                As Per Detail                                        As Per Detail                                                             As Per Detail
                                                                                                                     Steel Edge (Corten)
               · Any trees with girdled or poor root growth identified during the maintenance period
                 will be replaced at the contractors expense.
                                                                                                                                                          Bluestone Double Sawn Random
               · Report immediately any stolen or dead or dying plants to Super and always confirm                   Stepping Stone
                                                                                                                                                          Shape Stepping Stone                         Nominal: 400/500mm                                   As Supplied                                                              Bluestone
                 direction on substitution or replacement with a similar size and identical species or
                 variety of the plant/s.
               · Maintenance period of twelve (12) months from date of practical completion/on
                 maintenance of landscape works to streetscape.




                                                                                                                                                                                                                                                                                                                                                                     anembo consultants
Client:                            Location:                                      Project Description:                                           Drawing Title:               JOB No.: S24111298          E   26.09.25   ARCH BASE UPDATE     CK   TH

                                                                                                                                                                              FILE: 251202                D   21.03.25   ARCH BASE UPDATE     CK   TH
ArchEnd                            51 Elanda St, Sunshine Beach                   Landscape Works                                                                             DWG. No.   LD3              C   27.11.24   COUNCIL SUBMISSION   CK   TH
                                                                                                                                                                                                                                                                                                                                                                     anembo consultants pty.ltd.     A.B.N. 75 089 473 156
                                                                                                                                                 PROJECT
                                                                                                                                                 SPECIFICATIONS,     SHEET 3 OF 10                        B   21.11.24      FOR REVIEW        CK   TH                                             This document is the copyright of anembo consultants & shall       PO Box 24 Moffat Beach Q 4551   Landscape Architects
Development:                       Lot on Plan:                                   Project Status:                                                                    APPROVED:
                                                                                                                                                 ANNUAL MAINTENANCE T Hindley AILA 713                    A   11.11.24      FOR REVIEW        CK   TH   F   02.12.25   ARCH BASE UPDATE   CK
                                                                                                                                                                                                                                                                                                  not be copied without written approval, nor shall it be used
                                                                                                                                                                                                                                                                                               TH except for the development and the site specified. Scale can
                                                                                                                                                                                                                                                                                                                                                                     Ph: 07 5437 0000                Project Management
                                                                                                                                                                                                                                                                                                                                                                     email: [email protected]                Environmental
Development                       Lot 403 on RP 48112                             Landscape Operational Works                                    & FINISHES SCHEDULE CATEGORY: MHD                    ISSUE DATE            DESCRIPTION       DWN CKD ISSUE DATE         DESCRIPTION      DWN CKD
                                                                                                                                                                                                                                                                                                  not be guaranteed when printing from PDF files.                    www.anembo.com                          Arboriculture

Used in these records

About this file

File size
30.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans - MCU24-0153 & OPW24 0202.pdf · 30.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.