Council archive · source document
B0385652 · OPW11/0270
From the archive Response to Information Request (folder Program Files/exportimages/LocalExport/Batch 2041). File date in the archive: 2011-11-07 10:24.
dall
DESIGNER HOMES
All shapes and sizes
In light of our new amendments it is clear our owner John Todd
is committing to provide the best outcome for all. He has spent a
lot of money and time on this project and wishes to commence
asap.
The new longer proposed driveway plans will cost more than the
previous design. To which our owner is still very upset that the
neighbouring lot had their access provided with council funding
filling over 1500mm in excess to water pipe.
We would also like recognised that the previous submission for
the driveway application by the owners to council that there was
no information requests for forward motion and determination
of trees. They were told that there were no problems with the
design however the council will refuse as they do not have
funding for it in the budget.
With the above in mind the owners would like to later seek the
waiver of the infrastructure charge which will be trigger by the
approval of this home.
Please do not hesitate in calling me directly to discuss any
queries.
We have provided 3 copies of the plans and a CD copy
Thankyou
Steve Tuttle
0412895485
Director
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
B0385652.pdfRelated documentApplication case desk ↗
About this file
- File size
- 627 KB (small file)
- File type
No other editions are linked here.