                                             Officer:          Conor Neville
                                             Direct Telephone: (07) 5449 5108
                                             Response Address: PO Box 141, Tewantin QLD 4565
                                             Email:            [email protected]
                                             Our Reference:    2008/975
                                             Your Reference:
8 September 2008

Comiskey Group
PO Box 46
LAWNTON QLD 4501




Dear Sir

                                      Decision Notice
                                   Integrated Planning Act 1997

I refer to your application and advise that on 8 September 2008 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:

1     APPLICATION DETAILS

 Application No:                     2008/975
 Street address:                     71 Pacific Avenue, Sunshine Beach
 Real property description:          Lot 31 RP 149005
 Planning Scheme:                    The Noosa Plan
2     DECISION DETAILS

The following type of approval has been issued:
    Development Permit for Operational Works - Landscaping
3     RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4     ASSESSMENT MANAGER CONDITIONS

Landscaping
1.    The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines.
      The approved plans are numbered and titled:
       Plan         /       Rev.     Plan / Document Name                                        Date
       Document No.
       LGTP 1240 LA         D        Landscape Plan for Operational Works Approval –             17-07-08
       01                            Landgraphics



                                                                                          Page 1 of 6
Full text of the other 5 pages

Page 2

                                                                                          2008/975



        LGTP 1240 LA        D        Landscape Details for Operational Works Approval –        17-07-08
        02                           Landgraphics

       and may be amended by these conditions.
2.     Any trees located in the road reserve on Pacific Avenue and David Low Way approved to
       removed for the purposes of this development are to be replaced with a minimum sized 100
       Litre local native tree species in a suitable location on the road reserve.
3.     The landscape construction is to be implemented in accordance with the amended landscape
       plan, planting schedule and horticultural industry best practices.
4.     All trees must be located a minimum of 1 metre from all services to prevent root/service
       conflict and to provide future ease of maintenance requirements
5.     All native plant species located in-group plantings shall not be subjected to any hedging
       maintenance regimes.
6.     All street trees and internal trees 45 litre and greater must be securely staked and tied to
       assist their growth during the establishment period.
7.     The plantings on the road reserve are not to impact on safe sight lines or safe sight distances
       for road users. Adequate sightlines are to be maintained at all times.
8.     The density of planting must achieve the set out requirements as detailed on the approved
       landscape plan.
9.     All landscaping treatment shall not unduly restrict or prevent access to service meters within
       the site.
10.    All manholes, inspection pits and grates are to be raised to finish surface level and kept free of
       cover and be visible at all times to ensure prompt access in case of emergency.
11.    The owner of this development is responsible for the ongoing maintenance of landscaping
       within the road reserve.
12.    This Development Permit lapses if the development has not happened by 8 September 2010,
       unless application to extend the currency is approved by Council.

5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger              Referral Status   Referral Agency         Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.     Plan / Document Name                       Date
 LGTP 1240 LA 01           D        Landscape Plan for Operational Works       17-07-08
                                    Approval – Landgraphics
 LGTP 1240 LA 02           D        Landscape Details for Operational          17-07-08
                                    Works Approval – Landgraphics




                                                                                        Page 2 of 6

Page 3

                                                                                            2008/975



7      ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8      PROPERTY NOTES
Not applicable

9      PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable
10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required            Subject of the required Development Permit
 Nil

11     SELF ASSESSABLE CODES

Not applicable
12     SUBMISSIONS

Not applicable

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable

14     RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
                                                                                         Page 3 of 6

Page 4

                            2008/975



Yours faithfully,




Tracy Jones
SENIOR PLANNING OFFICER




                          Page 4 of 6


[OCR of page images]
2008/975

 

Yours faithfully,

Tracy Jones
SENIOR PLANNING OFFICER

Page 4 of 6

Page 5

                                                                                               2008/975




                                                 Appeal Rights
                                                INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                                               (5) If an application is processed under section
The following is an extract from the Integrated            6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4).                                  application are available only for the aspects of the
Division 8 - Appeals to court relating to                  development that would have required public
development applications                                   notification under the repealed Act.
Appeals by applicants
                                                               (6) If an application involves assessment
4.1.27.(1) An applicant for a development                  against a concurrence agency code, appeal rights
application may appeal to the court against any of         for submitters for the application are not available
the following-                                             against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a              concurrence agency’s response for the code.
    development application;                               Appeals by advice agency submitters
(b) a matter stated in a development approval,             4.1.29.(1) An advice agency may, within the limits
    including any condition applying to the                of its jurisdiction, appeal to the court about the
    development, and the identification of a code          giving of a development approval for a
                         1
    under section 3.1.6;                                   development application if-
(c) the decision to give a preliminary approval            (a) the development application involves impact
    when a development permit was applied for;                 assessment; and
(d) the length of a currency period;                       (b) the advice agency told the applicant and the
(e) a deemed refusal.                                          assessment manager to treat its response to
    (2) An appeal under subsection (1)(a) to (d)               the application as a submission for an appeal.
must be started within 20 business days (the                   (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the             business days after the day the decision notice or
decision notice or negotiated decision notice is           negotiated decision notice is given to the advice
given to the applicant.                                    agency as a submitter.
    (3) An appeal under subsection (1)(e) may be           Appeals for matters arising after approval given
started at any time after the last day a decision on       (co-respondents)
the matter should have been made.                          4.1.30.(1) For a development approval given for a
Appeals by submitters                                      development application, a person to whom any of
4.1.28.(1) A submitter for a development                   the following notices have been given may appeal
application may appeal to the court about-                 to the court against the decision in the notice-
(a) the giving of a development approval, including        (a) a notice giving a decision on a request for
    any conditions (or lack of conditions) or other            extension of the currency period for an
    provisions of the approval; or                             approval;
(b) the length of a currency period for the approval.      (b) a notice giving a decision on a request to make
                                                               a minor change to an approval.
    (2) The appeal must be started within 20
business days (the “submitters appeal period”)                 (2) The appeal must be started within 20
after the day the decision notice or negotiated                    business days after the day the notice of the
decision notice is given to the submitter.                         decision is given to the person.
    (3) If a person withdraws a submission before              (3) Subsection (1)(a) does not apply if the
the application is decided, the person may not                     approval resulted from a development
appeal the decision.                                               application (superseded planning scheme)
                                                                   that was assessed as if it were an
    (4) If an application involves both impact                     application under a superseded planning
assessment and code assessment, appeal rights                      scheme.
for submitters are available only for the part of the
application involving impact assessment.                       (4) Also, a person who has made a request
                                                                   mentioned in subsection (1) may appeal to
                                                                   the court against a deemed refusal of the
                                                                   request.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                             Page 5 of 6

Page 6

                                                                                              2008/975

     (5) An appeal under subsection (4) may be          For Building Works Only
         started at any time after the last day the     Rights of appeal conferred by Section 4.2.9 of the
         decision on the matter should have been        Integrated Planning Act 1997 as follows:
         made.
                                                        Division 3 – Appeals to tribunals relating to
                                                        development applications
Division 9 - Appeals to court about other
matters                                                 Appeals by applicants
Appeals for matters arising after approval given
(no co-respondents)
                                                        4.2.9(1) An applicant for a development application
4.1.31.(1) A person to whom any of the following        may appeal to the Building and Development
notices have been given may appeal to the court         Tribunal against any of the following-
against the decision in the notice-
                                                        (a) the refusal, or the refusal in part, of a
(a) a notice giving a decision on a request to              development application;
    change or cancel a condition of a development
    approval.                                           (b) a matter stated in a development approval,
                                    2                       including any condition applying to the
(b) a notice under section 6.1.44 giving a decision         development, and the identification of a code
    to change or cancel a condition of a                    under section 3.1.6;
                                                                                  3
    development approval.
                                                        (c) the decision to give a preliminary approval when a
    (2) The appeal must be started within 20                  development permit was applied for;
        business days after the day the notice of the
                                                        (d) the length of a period mentioned in section 3.5.21
        decision is given to the person.
                                                              currency period;
    (3) Also, a person who has made a request
                                                        (e) a deemed refusal.
        mentioned in subsection (1)(a) may appeal
        to the court against a deemed refusal of the       (2) An appeal under subsection (1)(a) to (d) must
        request.                                        be started within 20 business days (the “applicant’s
                                                        appeal period”) after the day the decision notice or
    (4) An appeal under subsection (3) may be           negotiated decision notice is given to the applicant.
        started at any time after the last day the
                                                            (3) An appeal under subsection (1)(e) may be
        decision on the matter should have been         started at any time after the last day a decision on the
        made.                                           matter should have been made.
Appeals against decisions to change approval            The Registrar for the Building and Development
conditions under the repealed Act                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a         http://www.localgovernment.qld.gov.au/
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
    (2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.


2
     Section 6.1.44 (Conditions may be changed or
                                                        3
    cancelled by assessment manager or concurrence           Section 3.1.6 (Preliminary approval may override
    agency in certain circumstances)                        local planning instrument)
                                                                                            Page 6 of 6

Used in these records

About this file

File size
52 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000975.001 [As Published].pdf · 52 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.