Skip to the record
Accept no substitutions.

Council archive · source document

05/1148 - Change a Development Approval & Extend to Relevant Period [As Published] · 132005.1148.02

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

i6. DEVELOPMENT PERMITS REQUIRED |

 

 

 

 

 

 

 

 

 

 

 

Minor Change to an Existing Approval Yes
Building Works : Yes
Operational Works Yes
Reconfiguring a Lot No
Plumbing & Drainage Works Yes
47. _ COMMENTS . j
History

1. Council approved Development Application 2005/1148 for a Material Change of Use (Dwelling
House in a Sand Dune Problem Area) on 20 January 2006. A Preliminary Approval for
Operational Work 2006/0676 was granted on 7 March 2007. An application to extend the
currency of 2006/0676 was approved an 18 November 2008. The relevant period lapses if the
use has not commenced by 20 January 2010. :

Detached House Code

2. The Material Change of Use Approval (2005/1148) for the proposed development was
assessed against the Superseded Planning Scheme. The proposal does not comply with the
current Noosa Plan in regard to Building Height in Storeys. A copy of the definition is provided
below. . y

>

building height in storeys means the number of storeys in a building measured vertically at any
point, provided that a basement shall not count as a storey. .

basement means a space where the ceiling height projects no more than one metre above both
the hatural ground surface and the finished ground level, and where access to the basement is
limited to one opening a maximum of 6m wide.

storey means that space within a building which is situated between one floor level and the floor
level next.above, or if there is no floor above, the ceiling or roof above and includes a space for the
accommodation of vehicles. Any such space that exceeds a vertical dimension of 5m comprises
more than 1 storey.

3. The proposal does not comply with the Detached House Code in regard to Roof Form. The
Code requires eaves to at least 75% of the perimeter of the building and a roof pitch no less
than 5°,

4, The garage does not comply with Schedule 1 —- Setbacks. The garage is sited within the 6m
front setback.

Overlays
Biodiversity Overlay
5. The rear portion of the lot is affect by the Biodiversity Overlay with Environmental Protection.

The siting of the swimming pool is unlikely to be supported as it is within the Environmental
Protection Overlay and seaward of the Coastal building line (this is addressed below).

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

05_1148 - Change a Development Approval & Extend to Relevant Period [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.