Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2014-06-17 Infrastructure and Services Committee Agenda

of 86

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   17 JUNE 2014




                                                     Page 30 of 86

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                     17 JUNE 2014

Fal matrix tratic consutting                                                                          —

       1.            Introduction

       il            Background
                   Matrix Traffic Consulting has been engaged by TransLink Division to undertake a Road Safety Audit (existing road) of
                     Creek Road, Swan Street and Wylah Street in Noosaville. The project audited concentrates on the suitability of
                   operating a bus route along this road.
                   The project site is shown below in Figure LL.

                     2 ©      -

                          ag    Little Cowe Coffee ©                  a
                                       Noose General Prachce                               f
                                                                        noeed eeaes

                     ‘tate            = Weyba Gardens Resort
                     lage                                   &            Noosa Spa *
                                                           i
                                                  &
                                                 tone
                                 Delign Noosa @

                                 e
                    Figure LI:       Locality Plan
                    Source: Google Earth 2004

                   Creek Road in Noosaville is an urban local road with in a S0km/h default speed limit. Its sealed surface it
                   approximately 8.0 metres wide with kerb and channel on both sides. There are no stopping lines on Creek Road at the
                    horizontal curve to allow two-way traffic to safely negotiate the corner.
      1.2            Scope of the Assessment
                    The scope of this report includes the following:
                         = —aroad safety audit as per the procedures set out in the Austroads - Road Safety Audit (Second Edition
                             2009); and
                         = — areview of the suitability of bus operations along this road.

                                                                                                         Page 30 of 86
                                                                                                               He
Log in to download the original file

2014-06-17 Infrastructure and Services Committee Agenda(PDF, 6MB).pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.