Reference Documents - Preliminary Engineering Plans 132005.638.04
Plans and drawings: the text below has words only, no drawings.
Very large file (25.4 MB): may take a few minutes to open.
IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO CONTACT THE RELEVANT
AUTHORITIES TO CONFIRM THE LOCATION OF
ALL EXISTING SERVICES PRIOR TO THE
COMMENCEMENT OF EXCAVATION
BULK EARTHWORKS NOTES
1. STRIP ALL TOPSOIL CONTAINING ORGANIC MATTER TO A DEPTH OF
100mm AND SPOIL TO SUITABLE STOCKPILE AREA. REMOVE RUBBLE
MATERIAL, OVERSATURATED MATERIALS, ORGANIC MATTER AND
OTHER UNSUITABLE MATERIAL FROM THE SITE.
2. EARTHWORKS ON ALLOTMENTS SHALL BE CARRIED OUT IN
ACCORDANCE WITH AUSTRALIAN STANDARDS AS3798 - GUIDELINES
ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL
DEVELOPMENTS - COMPACTION TO 95% STANDARD (AS1289E1.1).
3. SIMILARLY, SUBGRADE COMPACTION TO 98% STANDARD
(AS1289E1.1). REMOVE ANY SOFT OR COMPRESSIBLE ZONES AND
SHEET C302 REPLACE WITH SUITABLE MATERIAL.
4. SUPERVISION, INSPECTION & TESTING SHALL BE CARRIED OUT TO
LEVEL 1 STANDARD U.N.O. FREQUENCY OF COMPACTION TESTS ARE
AS FOLLOWS:
LOCATION FREQUENCY
17 16
FINISHED LEVEL OR ROAD SUBGRADE (IN
1 per 100 m
CUT OR FILL)
ALLOTMENT FILL WHERE DEPTH 300 - 500mm 1 per LOT
SHEET C301 ALLOTMENT FILL WHERE DEPTH > 500mm 1 per LOT/500mm
16
LEVEL OF INSPECTION FOR ALLOTMENT FILL LEVEL 1
16
5. QUALITY TESTS OF IMPORTED MATERIAL ARE REQUIRED AT A RATE
OF 1 TEST PER 400 cu m OR PART THEREOF.
16
15
6. IMPORTED FILL MATERIAL SHALL BE LOW PLASTICITY GRANULAR
FILLING. PLACE FILL TO THE BUILDING PLATFORM AREAS IN LAYERS
OF LOOSE THICKNESS APPROPRIATE TO THE TYPE OF MACHINERY
15
BEING USED AND NOT GREATER THAN 250mm. ANY UNSUITABLE
16 MATERIAL SHALL BE IDENTIFIED, REMOVE AND REPLACE AS
15
SPECIFIED.
16
7. ALL TESTING OF EARTHWORKS SHALL BE CARRIED OUT AT THE
16
CONTRACTORS EXPENSE UNLESS NOTED OTHERWISE.
STOCKPILE NOTE
16
1. STOCKPILES OF CONSTRUCTION AND LANDSCAPING MATERIALS,
AND OTHER SITE DEBRIS, SHALL BE LOCATED CLEAR FROM ANY
POSITION FROM WHICH IT COULD BE WASHED ONTO ANY FOOTPATH,
15
15 NATURE STRIP, ROADWAY, OR INTO ANY DRAIN OR WATERCOURSE.
16
APPROXIMATE CUT/FILL VOLUMES
15 1. INCLUDES ALL QUANTITIES BETWEEN EXISTING (LESS 150) AND
FINISHED SURFACES (LESS 150). PAVING BOXING QUANTITY (300 DEEP)
NOT INCLUDED.
16
TOTAL CUT XXX.XXXm3
15
TOTAL FILL XXX.XXXm3
BULK EARTHWORKS LEGEND (100mm INC.)
14
15
CUT FILL
PROPOSED EARTHWORKS 0.00 - 0.10m
14
PROPOSED EARTHWORKS 0.10 - 0.20m
PROPOSED EARTHWORKS 0.20 - 0.30m
PROPOSED EARTHWORKS 0.30 - 0.40m
PROPOSED EARTHWORKS 0.40 - 0.50m
PROPOSED EARTHWORKS 0.50 - 0.60m
PROPOSED EARTHWORKS > 0.60m
15
EXISTING CONTOURS 3.0
DESIGN CONTOURS 3.0
SCALE 1:500 (A1) - 1:1000 (A3)
Check all dimensions before commencement of work.
Check Site boundary dimensions from the Title plans
Check Building Boundary clearances by set out.
Notwithstanding the information supplied on this drawing,
the location, depth and extent of underground or overhead
services are to be confirmed and protected on site by the
contractor prior to commencement of works.
Approved
Checked - CJT Drawing title - Project - DOONAN WASTE TRANSFER Site - Project No. 244035 Sheet No. C300
Design - JIC Drawn - JIC
BULK EARTHWORKS OVERVIEW STATION - TRAFFIC CONCEPT 561 EUMUNDI-NOOSA ROAD, Digital Ref : C300 BULK EARTHWORKS Issue : B
Scales - AS SHOWN B 20/12/24 PRELIMINARY JIC COVEY ASSOCIATES PTY LTD 124 DUPORTH AVENUE Client -
NOOSA SHIRE COUNCIL DOONAN This Document is copyright and shall not be copied
A 28/11/24 PRELIMINARY JIC
ABN 59 137 305 992 PO BOX 16 without written approval, nor shall it be used except
Document Stage - PRELIMINARY (07) 5443 7777 MAROOCHYDORE QLD 4558 for the Development and the Site Specified.
Issue Date Description By [email protected]
c:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C300 BULK EARTHWORKS.dwg Plot 24 February 2025 - 11:31 AM
Document Set ID: 23617068
Version: 1, Version Date: 05/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.