STAGE 1 PROCEDURE : STAGE 2 PROCEDURE : STAGE 3 PROCEDURE :
• LOCALISED LEVELLING WISING GEOFABRK, ROCK BASE AND SCREW PIED • PROGRESSIVELY REMOVE TEMPORARY CONSTRUCTION PLATFORM AND • COMPLETE STORMWATER DISCHARGE FACILITY
RETAINING WALLS UP TO ESM HK,HI AT SITE ENTRANCE TO FORM TEMPORARY WITHDRAW TEMPORARY SCREW PILES AND STORE FOR RE-USE LATER, WILE • IF " TOP - DOWN - CONSTRUCTION METHOD IS ADOPTED.
TRACK AND VEHICLE TURN AROUND PROGRESSIVELY BUILDING 900 W X 600 0 REINFORCED CONCRETE WALL HEAD BEAM FORM UP AND BUILD PERMANENT ROOF (DRIVEWAY) SLAB. SUPPORTED ON
• MOVING PARALLEL TO WEST BOUNDARY, GRADUALLY INSTALL TEMPORARY AND 200MM BLOCK WALL OVER CONTIGUOUS PILES, ISOLATED (FA PILES AND STEEL SCREW PILES AND
SCREW PILES AND CONSTRUCTION PLATFORM OR SUITABLE LEVELLED PLATFORM • REINSTATE SURFACE PROTECTION AND SURFACE DRAINAGE TO SOILS BETWEEN BOUNDARY STRUCTURALLY CONNECT TO BUTTRESS AND BRACING WALLS UNDER
FOR (FA PILE RIG ACCESS AND INSTALL URETEK GROUT GROUND STABILIZATION AND NEW WALL, TO AVOID EROSION AND LOCAL SURFACE SAND SIP. • ROOF SLAB TO BE DESIGNED FOR CONSTRUCTION VEHICLE LOADID AND
ALOOF WEST BOUNDARY AND SURFACE SPOON DRAIN • MONITOR ADJACENT STRUCTURES, WALLS AND GOOD LEVELS MATERIAL STORAGE. AS WELL AS HORIZONTAL WALL LOAD
• INSTALL 600M DIAMETER CONTIGUOUS CFA GROUT PLED WALL AND VERTICAL • EXCAVATE ALONG CONTEAIOUS PLED WALL TO FORM PLATFORM AREA • CONTINUE TO MONITOR ADJACENT STRUCTURES
SCREW-N STEEL WICK DRAINS AT AM CENTRES • MINOR FLLNG TO MAXIMUM D 1M DEPTH • (O IE(T ROD DRAINAGE TO APPROVED STORMWATER DISPOSAL
• LOCALLY STABILISE ADJACENT FOOTNGS TO BLOCK WALLS AND FENCES • INSTALL RETANNG WALL AND ALL OTHER CONTIGUOUS AND
• MONITOR ADJACENT STRUCTURES, WALLS AND GROUND LEVELS ISOLATED PILES WITHIN BUILDING AREA
• COLLECT ANY CONCENTRATED STORMWATER FROM ABOVE AND ACROSS SITE, • INSTALL ALL REQUIRED RAKING PILE COMPRESSION AND TENSION ANCHORS,
AND DISCHARGE TO APPROVED LOCATION AND TEMPORARY SAND ANCHORS WHERE POSSIBLE UNDER WEST ADJACENT LOTS 5
• INSTALL SEDIMENT / EROSION CONTROL & 6, AS PER PLED WALL DETAILED DESIGN.
I_3-0.
.n SPRAY CONCRETE PROTECTION
TO EXPOSED CONCRETE FOOTING
ROOF SLAB I DRIVEWAY I TED INTO
TEMPORARY WORK BUTTRESS AND BRACING PILED WALLS
PLATFORM
TOP OF WALL TEMPORARY
RL 50.0 FORMWORK
3.5-40WOE o. N
URETEK GROUT -^.
EXISTING MDR FLUNG TO A nAXMM
INJECTION
GROUND SLOPE , S x> DEPTH OF La
301 SCREW PILES
AT L.O. CRS.
VERTICAL 6.0. LONG
WICK DRAINS
D (9.11L10 FOR APPROVAL
C 13.1110 FOR APPROVAL
600 DIA. CONTIGUOUS 0 12.It10 PRELIMINARY ISSUE TO CONSULTANTS
PILE WALL
A 20.10.11 PRELMURY ISSUE TO ARCHITECT
O.i, 6e•y Ms,
PROPOSED RESIDENCE
LOT 1
STAGE 1 - SECTION STAGE 2 - SECTION STAGE 3 - SECTION 71 SEAVIEW TERRACE
SUNSHINE BEACH
for A. SLINGER
EXTEND PfLE REINFORCEMENT
500.. INTO STABILISED SAND PING CONSTRUCTION
PLATFORM
STAGE 4 PROCEDURE MCU WORKS
•
•
REMOVE ROOF/DRIVEWAY SLAB FORMWORK RAFTER 20 DAYS) CONSTRUCTION
PROGRESSIVELY EXCAVATE DOWN 10 APPROX RL AS.O, IN All LENGTHS
AND (OBSTRUCT GARAGE LEVEL FLOOR SLAB TO RL AS, FULLY TED IN TO PLED WALLS
BELOW. AT THE SAME TIME NSTALL SUB-FLOOR SEEPAGE DRAINS AND (ONIE(0 VERTICAL
PROCEDURE
WICK DRAMS THROUGH PLED WALL
• PROGRESSIVELY EXCAVATE BED 2/3 AREA IN 6M LENGTHS TO APPROX RL 42.0 AND
NSTALL SUB-FLOOR SEEPAGE DRAINS AIDE CONNECT THROUGH TO VERTICAL WICK DRAINS TOP SOIL BACKF^ L AND DRAINAGE
• INSTALL GROUND ANCHORS RAKING PILES AND BUILD TIE BEAMS, POUR 6M SEGMENTS TO LANDSCAPE ARCHITECTS DETAILS
Of BEDROOM 2 & 3 FLOOR SLAB AT RL 40 FOR PERIMETER PLANT:'LAGS architect
gavin maddock
CONSTRUCT ALL BRACING CONTINUOUS 90OW x 6000
WALLS TO U/SI E ROOF SLAB WALL HEAD BEAM
I
NOTE
REFER TO JONES FLINT 6 PIKE STORMWATER TODCONSULTING
TEMPORARY GROUND MANAGEMENT PLAN M2339 I REY C I FOR DETAILS OF
ALL DRAINAGE AND FINISHED PROFILES OF THIS
ANCHORS TO BE REMOVED
AFTER COMPLETION OF 3,9+1 WIDE CON(RETE/VEGETAON LIHIED DRAIN ENGINEERS
(ONSTRUCTON
CONNECT DRAINS
THROUGH PENETRATIONS STRUCTURAL CIVIL
SUB FLOOR
SOUTH-WEST BOUNDARY
DRAINS
600 DIA. CONTIGUOUS PROTECTION DETAIL TOO CONSULTMO PTY. LTD.
^A. nvw>y
PLED WALL
Z- J a., So
i., n -^ Ch 5,4 i(.
c IM. nos++.'eeoniw^a..
DEPTH OF PILES MUST ALSO BE AT LEAST rro ... Ioa-monpmm
TAM BELOW NATURAL GROUND LEVEL
600 OA. CONTKAJOUS
PILED WALL TENSION SCREW
PILES
COMPRESSION B. GEORGE uo. K. CAPPER OCT 2110
RAKING PILES TYPICAL 600 DIA. CFA
X. (PAT S PRYSTIPA kW I -. IN
GROUT REPLACEMENT PILE 6 6 4 2 x,.
STAGE 4 - SECTION 10 0
no.., r
AHO
SCALE 1200 UNREDUCED AT Al 09578 P7 A B' C D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0169 Information Response to DERM - 71 Seaview Terrace Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 14.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.