Original source · versioned page text
20230926_36-38 Duke St_Information_Request_Response (MCU23-0070)
. Response In response to Item 11, TTM waste consultants were engaged to review the revised design and prepare a waste strategy for the development. As such, TTM have prepared a supplementary waste report to demonstrate how the waste management requirements for the whole development will be managed (Refer to Attachment D). Information Required 12. If required, amend the proposal plans to include a waste storage area of a sufficient size to service the whole of the development. Response In consultation with TTM waste consultants the waste bin storage size and location has been reviewed and the proposal plans amended to reflect this advice (Refer to Attachment A). ISSUE 13 – STORMWATER DRAINAGE The submitted documentation does not include sufficient information for Council to assess how stormwater generated by the development will be controlled, collected, and discharged. • It is unclear what the proposed structure downstream from the proposed detention tank is and how it will integrate into the proposed drainage system (indicated by a blue circle). • It is unclear how the proposed detention tank overflows during events up to, and including, a 1% AEP event (volume, discharge rate). • It is unclear how the infiltration outlet of the detention tank will operate. Given the large catchment area of the detention tank, Council is concerned the soil may become oversaturated and the filtration rate of the soil will reduce which may adversely affect the overall drainage system and the structural elements of the development. • It is unclear how the proposed field inlet in catchment D3 will function during a 1% AEP event. Council recognise that this field inlet serves both the overflow from the detention tank and a small catchment area. Council is concerned that during events up to, and including, a 1% AEP event this pit may surcharge and direct additional runoff on to the footpath in the road reserve. • The discharge rate of the RHS kerb adapter is unclear. Council is unlikely to support a discharge rate higher than 25 l/s during a 1% AEP event. Information Required 13. Provide additional detail to address Council’s concerns. The additional detail must be prepared by a suitably qualified person (RPEQ). Note that the detail can be preliminary in nature but must be sufficiently detailed to demonstrate that the stormwater system is conceptually functional. Response In response to Item 13, JFP Urban Consultants have updated the Site Based Stormwater Management Plan which is included as Attachment F. An engineering response has been prepared by JFP Urban Consultants (Attachment E) which provides a summary of the issues raised, which are also addressed in the update stormwater management plan. JFP Ref: M3024P Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original