Information Required
16. Provide additional detail demonstrating that the turnaround bay at the end of the aisle is sufficient to allow B99
vehicles to manoeuvre the site and exit in a forward gear. The additional detail must be prepared by a suitably qualified
person (RPEQ) and include, but not be limited to:
         a. assume proposed carparks R2, R3 and R5 are occupied.

Response
In response to Council’s information request, a unit has been removed from Level 1. This provides additional space for
manoeuvring areas on level 1. In consultation with TTM traffic consultants, Blackburne Jackson Design have prepared a
revised parking layout for Level 1 (refer to Attachment A). As part of TTM’s updated traffic assessment (refer to
Attachment C) a swept path analysis was conducted, which demonstrates that a B99 vehicle can turn at the end of the car
park using the parking aisle and turning zone only, assuming all spaces are occupied. This will allow a car to exit in a
forward direction when all parking spaces are full. The swept path analysis also shows manoeuvring for all spaces are
possible with no more than 3 turns for each entry and exit manoeuvre. Accordingly, TTM have concluded that the revised
car parking layout is functional and fit for purpose.

This correspondence and attachments represent a response to all the information requested, in accordance with s13.2 of
the Development Assessment Rules.

We trust the above and enclosed information satisfactorily addresses Council’s Information Request requirements.




Yours faithfully,




TIMOTHY BALCOMBE
SENIOR URBAN PLANNER
JFP URBAN CONSULTANTS

CC/ - Cambooya Pty Ltd



Attachment A – Architectural plans
Attachment B – Landscape plans
Attachment C – Traffic response
Attachment D – Waste response
Attachment E – Engineering response
Attachment F – Stormwater management response
Attachment G – Geotechnical response




JFP Ref: M3024P                                                                                                 Page 19
Log in to download the original file

20230926_36-38 Duke St_Information_Request_Response (MCU23-0070).pdf · 627 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.