Council archive · source document
Engineering Plans · MCU16/0018
Attached to the e-mail MCU16/0018 - Response to Information Request.
Attached to the e-mail OPW16/0094 Application - 9 Duke Street Sunshine Beach.
Plans and drawings: the text below has words only, no drawings.
ABN 40 098 481 899
DEBUILD T/A
Fax (07) 5455 5696
1/11 PROJECT AVE, NOOSAVILLE QLD 4566
Drawn:
●CIVIL●GEOTECHNICAL
Scale:
Ph (07) 5455 5604
Project
SCG
Title:
Drg No.
Issue:
Date:
le
Power po
Scr 2
ew
44.6
45.48
0 2
.1 .7
45 44 8
45.36 44.3
45.22 44.86 44.87 3
45.4
9 44.4
Telstra P 45.55
it Concrete Footpath 44.57
45.33 44.93 44.64
45.62
45.44 140°0' 44.66
Water Meter
133°0'
6 6.789 44.64
.8
45 8.348
.8
3 45.29
45
6
0
45.0
.8
.16
44 63
45
44.
44.93
.87
44 1
44.6
. 88
44
44.42
0
44.3
6
.2
44
44.50
44.06
9
.4
44.04
45 9
44.21
.1
44
79
44.70
.
45
45.0
45.84
9
4
44.6
47.4
1
45.7
2
45.65
46.15
48 45.45
.67
47.0 46
8 .82
48.36
27
48.
49.36
6
.9
50
0 51.36
52.5 04
51.
.41
52
54.53
8
.9
54
1.
1.73
.93
56.70 55
2
0 18 113
18 113 48
48 RP
RP 1 3
18 11
48
RP
[OCR of page images]
DRAWING SIZE - Al
NEIGHBOURING HOUSE
INDICATES CONTIGUOUS CONCRETE PILING, DESIGN AND
INSTALLATION BY OTHERS. MINIMUM VIBRATION
X 25 | TECHNIQUES TO BE USED FOR INSTALLATION, VIBRATION
@, O CONTROL AND MANAGEMENT BY PILING CONTRACTOR. EXTENT OF PILES TO BE
%> | BUILDER TO CONFIRM EXTENT REQUIRED TO SATISFY
DETERMINED IN ACCORDANCE WITH
CRITICAL DEPTH LINE PROTECTION
CRITICAL DEPTH LINE PROTECTION OF NEIGHBOURING
STRUCTURES. REFER DETAIL.
HATCHING INDICATES 40° BATTERED g
BANK WITH CONCRETE SPRAYED Oe
FACE. REFER DETAIL BELOW.
% &
S
29'Sp_
as ———_ Es ———/S
lg Busia
evo"
9€°Sb
45.48
CONSTRUCTION NOTES.
GENERAL:
1. DO NOT SCALE FROM THIS DRAWING.
2. ALL DIMENSIONS IN MILLIMETRES
3. SETTING OUT DIMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECTURAL
DRAWINGS.
4. ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE ARCHITECTURAL
DRAWINGS ARE TO BE REFERRED TO THE ENGINEER IMMEDIATELY.
5. THE BUILDER IS RESPONSIBLE FOR LOCATING ALL EXISTING SERVICES
WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE THAT ALL NEW
WORKS ARE IN ACCORDANCE WITH THE ATTACHED CRITICAL DEPTH LINE
DIAGRAM.
FOOTPATHS AND DRIVEWAYS:
1. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TO REMOVAL
2. CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES
3. CONCRETE DRIVEWAY 10 BE 125mm THK. EXCLUDING ANY FINISHED
TREATMENTS, EG. STAMPING
4. CONCRETE SURFACE TOLERANCE +5.0mm OVER 3.0m
5. CONCRETE N25 IN ACCORDANCE WITH AS 1379 AND AS 3600
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB DEPTH.
7. EXPANSION JOINTS TO BE 10mm WIDE WET TOOLED WITH EVERY 2ND MESH
WIRE CUT ALONG JOINT.
8. ONE ACCESS POINT PERMITTED FOR EACH ALLOTMENT.
9. FOR CURVED DRIVEWAYS, MAXIMUM GRADES APPLY TO INSIDE EDGE OF
CURVE
10. ALL SERVICES TO BE LOCATED AND PROTECTED AS REQUIRED PRIOR TO
WORK COMMENCING
FILLING NOTES:
THE SITE IS TO BE SCRAPED CLEAR OF ALL ORGANIC MATERIAL AND
DEBRIS.
— THE SUBGRADE IS TO BE ROLLED WITH A VIBRATING STEEL DRUM
ROLLER TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95% THE
COMPACTION IS TO BE SUFFICIENT TO ACHIEVE A BLOW COUNT OF 7
BLOWS PER 300mm WITH AN APPROVED PERTH SAND PENETROMETER
FOR A DEPTH OF 1.0m BELOW EXCAVATED LEVEL. COPIES OF
COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG CONSULTING
ENGINEERS FOR APPROVAL.
— THE FILL MATERIAL CLEAN GRANULAR MATERIAL (LE. SAND TO A
CLAYEY SAND IN ACCORDANCE WITH AS1726) BE FREE OF ANY
ORGANIC MATERIAL AND HAVE A CLAY CONTENT OF LESS THAN 12%
(PLASTICITY INDEX LESS THAN 25% LINEAR SHRINKAGE OF 15%). THE
PROPOSED MATERIAL IS TO BE INSPECTED BY SCG CONSULTING
Sb
ol Pp ENGINEERS PRIOR TO ITS REMOVAL TO ENSURE ITS COMPATABILITY.
oy Ower pbi
oa Sc e — THE FILL IS TO BE PLACED AND COMPACTED IN ACCORDANCE WITH
Yu AS3798-1996 TO A LEVEL SUFFICIENT TO ACHIEVE A LEVEL 1
+~ KH E lu = CERTIFICATION WTH A MINIMUM RELATIVE FIELD DENSITY OF 95%
/ J \ a COPIES OF COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG
L t 20 / 4A | | 5 CONSULTING ENGINEERS FOR APPROVAL.
O 0 / / x 44.50 | 3 & — FILLING AND COMPACTING ADJACENT EXISITING STRUCTURES IS TO BE
BASTING VESETATION 0 pp4attG / PROPOSED UNIT | 7 | & IN STRICT ACCORDANCE WITH THE ASSOCIATED DETAILS AND
1 , 4 | || 2 SPECIFCATIONS.
TO ENSURE SLOPE STABILITY. / PROPOSED _ DEVELOPMENT | a # v |) = — AREAS WHERE EXISTNG STRUCTURES OR TREES ARE REMOVED SHALL
L GARAGE. / / | | |S o BE BACKFILLED WITH THE APPROVED FILL MATERIAL COMPACTED IN
s / / | | 7 ACCORDANCE WITH AS2870-1996 TO ACHIEVE A MINIMUM RELATIVE
3 s FPL 46.000 s | * Bl) 3 FIELD DENSITY OF 95%
x ‘ ev * & ° Tes — ANY LOOSE OR SOFT MATERIAL UNCOVERED IN THE SITE
8 / . 45.84 x 44.70 UNIT 2. | | ‘se 3 PREPARATION SHALL BE REMOVED AND REPLACED WITH THE APPROVED
A, © a» / | oo | > FILL MATERIAL COMPACTED IN ACCORDANCE WITH AS2870-1996 TO
a 7 <7 J | s i % ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95%
8, / * — SITE DRAINAGE AND SILT PROTECTION MEASURES MUST BE ISTALLED
25 / / PRIOR TO CONSTRUCTION COMMENCING.
ls
Checked:
ic s //90 BLOCK RETAINING WALL z | “9 S Richordeon
HATCHING INDICATES CUT BENCH o Q s 28 Rg) ot
AT R.L. 48.800. a | 5 ee ue Sos
% % | 2 eB
2 a eo &
% o
or, | | 8 e
° SITE PLAN — SITE BENCHING & RETAINING WALLS 7
| Scale 1: 100 | rm"
fnanai——1_}—1_7m1:100 @ Al
| | 1:200 @ A3
DO NOT SCALE FROM THIS DRAWING
The design ‘and associated details contained on this ‘ond associated drawings are
EXISTING STRUCTURE /DWELLING NEIGHBOURING HOUSE Se retag trgneet used or reproduced without the written permission of
INCLUDING NEIGHBOURING
ALLOTMENTS
THE BUILDER /CONTRACTOR
SHALL CONFIRM ALL
RELEVANT LEVELS PRIOR TO
COMMENCING WORKS.
Ground / GROUND LEVEL
pad level LEGEND AMEND DATE DESCRIPTION APPR.
UNSTABLE AMENDMENTS
&» ] ieee i POGNAED 90 INDICATES EXISTING SURFACE Tssue
THIS FOOTING IS FOUNDED ABOVE CRITICAL DEPTH 2: CONTOUR AND LEVEL TO AHD. FOR DEVELOPMENT APPROVAL
BELOW CRITICAL DEPTH LINE AND IS UNSTABLE. FAONG S72 MESH MODLE a DeBULDTA
LINE AND IS STABLE. STABLE * EXISTING SURFACE SPOT LEVELS. ce): onsulting ENGINEERS
STRUCTURAL eCIVILeGEOTECHNICAL
ABN 40 098 481 899
LINE OF PROPOSED FALL, — INDICATES DIRECTION OF FALL UP
OR DOWN AS INDICATED 1/11 PROJECT AVE, NOOSAVILLE QLD 4566
PIERS OR UNDERPINNING FOUNDED 1.73 aril OR OTHER Ph (07) 5455 5604 Fax (07) 5455 5696
WOULD BE NESDED 10 SUPPORT NX , EXCAVATED LEVEL Hoare eR tose er D Tie:
i FQTNG THA DINE senoge wera NX SNES stows mores masicn [OPERATIONAL WORKS:
ABOVE THE CRITICAL DEPTH LINE. i TT
Horizontal 30 Degrees —_ WORKS COMMENCING. [2.740 | SURFACE LENELS TANDSCAPING SITE BENCHING & RETAINING WALLS
NOTE: Project
CRITICAL DEPTH LINE THIS DETAIL ALSO APPLIES 70 EXISTING E INDICATES OVERHEAD ELECTRICITY rojec
FOUNDATIONS ON NEIGHBOURING 9 DUKE STREET
PROPERTIES. SHEET PILING MUST BE S/EX INDICATES EXISTING SEWER LINE SUNSHINE BEACH
OE Ne roam WILL TYPICAL SECTION ~ SPRAYED CONCRETE FACED EMBANKMENT
sw/EX ——————__ INDICATES EXISTING STORMWATER Date: le: D :
CRITICAL DEPTH LINE / DRAIN /MAIN. te Mare 16 | °°" as noteD | O"*"
Pra N° 95464 —-OW5 Rev.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Plans.pdfRelated documentApplication case desk ↗
SCG_25464-OW1-SW1_23.03.2016-1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.