Original source · versioned page text
2015-04-07 Item 2 - Attachment 1 - Pre feasibility Study of Electric Bus Routes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
bus technology options. The finding of the SWOT was used to inform the Multi- Criteria Analysis (MCA) to determine the most appropriate solution for Noosa. In addition, telephone interviews were conducted with transit agencies and bus operators to understand actual implementation issues, potential risks and lesson learnt, which could inform the electric bus for Noosa. The case studies included: Tel Aviv, “Dan” bus operator, BYD pilot Greater Manchester Integrated Transport Authority – Optare e-bus pilot Schiphol airport pilot program – BYD K-9 Adelaide City Council -Tindo E bus Brisbane City Council To supplement the market research, an email questionnaire was sent to selected manufacturers, transit and government agencies in the electric bus Industry whom were based locally and abroad. A copy of the questionnaire and the responses are attached in Appendix A. A review was also undertaken of relevant State and Federal Transport policy, standards, regulations and contract which may potentially influence the implementation of the electric bus project. The review also involved consulting with key industry stakeholders to understand potential changes or directions in policy and regulations that may support the Strategic Outline Case. An assessment criteria framework was developed to identify factors which influenced the project’s success and included Council’s/TransLink’s financial priorities, financing requirements, CAPEX, OPEX, potential funding sources, optimal fleet size considerations, availability of preferential interest rates, age of the current fleet and maintenance cost, etc. The assessment criteria framework was used to inform the SOC which consisted of a: Project financial model with key assumptions and variables including the CAPEX, OPEX and funding arrangements Cost-Benefit Analysis (CBA) highlighting the potential benefits and constraints of the preferred option Project risk assessment identifying project strengths and weaknesses which will assist in development of a successful future funding application. A project schedule will be developed to outline the key next steps to take the project to a live trial. 1.5 Report Structure This report is comprised of the following sections: Section 2 – Transport planning framework Section 3 – Electric bus route selection for the trial Section 4 – Review of electric bus technologies Section 5 – Review of legislation, policy standards, regulations and contracts Section 6 – Developing the most appropriate solution for Noosa Section 7 – Strategic outline case Section 8 – Conclusions and recommendations 4 | GHD | Proposal for Noosa Council & TransLink Division - Planning Report
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.