Original source · versioned page text
2015-04-07 Item 2 - Attachment 1 - Pre feasibility Study of Electric Bus Routes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Figure 6 Four Local Bus Routes in Noosa Three (3) bus route options were developed and assessed for the electric bus trial. They are described with the advantages and disadvantages in the following sections. The key criteria that were considered in the assessment of the route options for the trial are: Maximise patronage for local residents, tourists and visitors with a route that connects key local destinations, such as Tewantin, Noosa Heads and Noosa Junction Maximise the exposure for the general public to promote Noosa as a Shire with sustainable transport values and attract new patronage Minimise installation costs of the trial to be attractive for electric bus suppliers Support operational efficiency with the location of the recharging stations Minimise disruption to the existing bus routes and passengers with requirements to change timetables for only the trial period Minimise impacts on driver shifts, rosters and depot operations Test the physical capability of the electric bus with a mix of operating environments, terrains and street types and speed limits with and without traffic calming devices Minimise operational costs for the trial 3.2.1 Option 1 - Redesign local bus network Option 1 is a redesigned local bus network that includes a reconfiguration of Routes 626, 627, 628 and 629 to create a new dedicated high frequency route between Tewantin, Noosa Heads and Noosa Junction via Pelican Street, Memorial Drive, Hilton Terrace, Gympie Terrace, Weyba Road, Noosa Parade, Noosa Drive and Sunshine Beach Road. This new Route 625 would be a merger of the sections of Routes 626 and 627 between Tewantin and Noosa Junction via Noosa Heads into one route. It would operate every 15 minutes from 7 am to 7 pm daily, which is the same as the existing combined service frequency of Routes 12 | GHD | Proposal for Noosa Council & TransLink Division - Planning Report
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.